Factory Building Symposium on Lean Production

Similar presentations


Presentation on theme: "Factory Building Symposium on Lean Production"— Presentation transcript:

1 Factory Building Symposium on Lean Production
January 29, 2007 Austin, Texas

2 Empowering the Lean Team
Cavalier Homes, Inc. Addison, AL Michael Wade, Director of Manufacturing Operations

3 Cavalier Plant 2 Started: 1993 Location: Addison, AL Home type(s):
HUD Code Price point: Moderate Design: Minimal customization Production: 8 floors/day Market area: Southeast US

4 Gaining Support for Lean
Inspire through example Build from small to large

5 Cavalier’s Strategy Form a lean team of volunteers
Improvements: Combined electrical activities into one area Streamlined material flow Eliminated obsolete materials and equipment Relocated closer to the point of use Form a lean team of volunteers Select highly visible electrical department for first success Push to get it done: complete overhaul applying the “Five Ss” Anthony Dickerson, water tester, committee chair Jerry Andrews, assistant production manager Dave Berry, QC inspector Mike Cornelius, exteriors Barry Doss, assistant supervisor - floor department Greg Gilliland, supervisor, partitions and electrical departments (rotating member) Roger Naylor, purchasing agent Buck Vickery, maintenance Greg Wiggins, production manager Johnny Wooten, QC manager Lean Committee Corporate Liaison Michael Wade, director of manufacturing operations Timothy Donaldson, value engineer

6 Leveraging the Initial Success
Celebrate success Next, a major improvement

7 Exteriors Department Poorly organized work area resulting in multiple inefficiencies

8 Exteriors Department Equipment and materials Conveyance Loading
Storage Then Now Lack of storage system Designated storage locations and racks for all materials Excessive motion to supply materials into the area Arranged materials for ease of loading Material not close to point of use Disposed of obsolete materials and fixtures Brought materials closer to point of use Obsolete materials and seldom used equipment clogging area

9 Highlights Lean team mainly production employees Team took initiative
Little upper management pushing “Me too” factor Workers own results Strategy to sustain changes Lean a framework for efficiency initiatives Freedom to express constructive opinions

10 Moving Forward Expand “Five S” activity Initiate more ambitious RPIs
Celebrate success Form lean teams at all other facilities

11 Lean Symposium

12 Factory Building Symposium on Lean Production
Manufactured Housing Research Alliance Jordan Dentz (212) x13


Download ppt "Factory Building Symposium on Lean Production"