Presentation is loading. Please wait.

Presentation is loading. Please wait.

Build Smart for a Future Ready Singapore

Similar presentations


Presentation on theme: "Build Smart for a Future Ready Singapore"— Presentation transcript:

1 Build Smart for a Future Ready Singapore
OCTOBER 2017 Singapore Expo | Hall 3 & 4 | Max Atria Build Smart for a Future Ready Singapore 7 About the Project Project Description Proposed xxx development comprising 6 block of 14 storey residential building (Total 1079 Units), 1 block of Multi-storey Car Park with commercial / Community Facilities, Precinct Pavilion, ESS & Neighborhood Park at Yishun Avenue 6 / Yishun street 42 Site Area 20,000,000 sqm Gross Floor Area 80,000,000 sqm Gross Plot Ratio 4.0 Est. Project Costs $ 100,000.00 Contract Period Aug 2015 – Sep 2018 Status Under Construction / Completion Description The concept: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample The construction approach: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample BIM adoption: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample BIM Challenges:: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample BIM Solutions: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample BIM Benefts: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample. What (Basic information & Key Features) Strategies (Design to Tender) Design Communication and Collaboration Cost Estimation Design Documentation and Production Computational Design Environmental Simulations Note: Please elaborate briefly about the project, and the BIM approach, challenges, solutions and benefits at different stages in point form. Please replace the sample text with actual information and delete this note. Font size at 14, calibri Note: For completed projects, please provide an image of the actual build. For projects under construction, please provide the final rendering and delete this note Please replace with infographics/images that describes the BIM applicable for collaboration and communication , ICE (Integrated Concurrent Engineering), Virtual Visits or BIM work flow and delete this text Please replace with infographics/images that describes the BIM applicable for design purposes and delete this text Please replace with infographics/images that describes the BIM applicable for costing purposes with shop drawings or details linked with relevant costing processes to show accuracy and consistent information flow across project team members and delete this text Process Management Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Design Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Cost Monitoring Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Please replace with infographics/images that describes the BIM applicable for submissions, tender documentation, construction details or other relevant materials and delete this text Please replace with infographics/images that describes the computational BIM with Grasshopper/Dynamo/ Scripting or other parametric and coding approach and delete this text Please replace with infographics/images that describes the BIM applicable for climate studies/ solar shading/ ventilation or other environmental sustainability simulations and delete this text Documentation Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Computational Design Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Environmental Simulation Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Project Name Developer Sample Text Singapore Organisation Pte Ltd M&E Consultant Specialist Architect BIM Consultant Sample Text Singapore Organisation Pte Lt Design Consultant Builder C&S Consultant Specialists

2 Build Smart for a Future Ready Singapore
OCTOBER 2017 Singapore Expo | Hall 3 & 4 | Max Atria Build Smart for a Future Ready Singapore 7 Output and Outcome Savings Quantification and Productivity Gain Challenges, Solutions and Benefits Strategies (Construction to FM) Site Planning and Monitoring Prefabrication Site Coordination Augmented Reality Facility Management Please replace with infographics/images that describes the BIM applicable for Integrated Collaboration approach or other features and delete this text Please replace with infographics/images that describes the BIM applicable for Virtual Visits and ICE sessions or other features and delete this text Virtual Visits with Integrated Concurrent Engineering Sample explanation text BIM Benefts: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Integrated Model for Upfront Collaboration Sample explanation text BIM Benefts: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Please replace with infographics/images that describes the BIM applicable for construction site planning (tower crane radius studies, ingress/egress, contour studies for site office with BIM model or other features and delete this text Please replace with infographics/images that describes the BIM applicable for modular approach with Design for Manufacture and Assembly (DfMA) or other features and delete this text Please replace item with or other innovative BIM application if prefabrication is not applicable Please replace with infographics/images that describes the BIM applicable for RFIs or discrepancies, site coordination, virtual visits or other relevant features and delete this text Site Planning and Monitoring Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Prefabrication Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Site Coordination Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Please replace with infographics or images that describes the BIM applicable with the use of augmented reality for various purposes and delete this text Please replace item with RFID (Radio Frequency Identification Device) or other innovative BIM application if AR is not applicable Please replace with infographics or images that describes the for Facility Management and delete this text Please replace item with BIM with Robotics approach for self-installation or other innovative BIM application if FM is not applicable Please replace with infographics / graphs or charts that describes the productivity gain with time, cost, resources improvement and delete this text Augmented Reality and RFID Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample As-built and Facility Management Sample explanation text BIM Benefts: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Savings Quantification and Productivity Gain Sample explanation text BIM Benefits: 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Project Name Developer Sample Text Singapore Organisation Pte Ltd M&E Consultant Specialist Architect BIM Consultant Sample Text Singapore Organisation Pte Lt Design Consultant Builder C&S Consultant Specialists


Download ppt "Build Smart for a Future Ready Singapore"

Similar presentations


Ads by Google