PERTEMUAN-2 Chapter 2. Project Selection and Management

Similar presentations


Presentation on theme: "PERTEMUAN-2 Chapter 2. Project Selection and Management"— Presentation transcript:

1 PERTEMUAN-2 Chapter 2. Project Selection and Management
By Kundang K Juman , Ir,MMSI

2 © Copyright 2011 John Wiley & Sons, Inc.
Chapter 2 Outline Project selection. Creating the project plan. Managing and controlling the project. © Copyright 2011 John Wiley & Sons, Inc.

3 CREATING THE PROJECT PLAN
Project management phases consist of - initiation - planning - execution - control, and - enclosure. © Copyright 2011 John Wiley & Sons, Inc.

4 Project Methodology Options
A methodology is a formalized approach to implementing the SDLC. - Waterfall Development - Parallel Development - V-model (variation of the Waterfall Development) - Rapid Application Development (RAD) - Iterative Development - System prototyping - Agile Development © Copyright 2011 John Wiley & Sons, Inc.

5 Waterfall Development
© Copyright 2011 John Wiley & Sons, Inc.

6 © Copyright 2011 John Wiley & Sons, Inc.
Parallel Development © Copyright 2011 John Wiley & Sons, Inc.

7 © Copyright 2011 John Wiley & Sons, Inc.
V-model © Copyright 2011 John Wiley & Sons, Inc.

8 Rapid Application Development: Iterative Development
© Copyright 2011 John Wiley & Sons, Inc.

9 Rap Rafid Application Development: System Prototyping
© Copyright 2011 John Wiley & Sons, Inc.

10 © Copyright 2011 John Wiley & Sons, Inc.
(cont’d) Throwaway prototyping © Copyright 2011 John Wiley & Sons, Inc.

11 © Copyright 2011 John Wiley & Sons, Inc.
Agile Development A group of programming-centric methodologies that focus on streamlining the SDLC. Includes face-to-face communication Extreme programming – emphasizes customer satisfaction and teamwork. © Copyright 2011 John Wiley & Sons, Inc.

12 © Copyright 2011 John Wiley & Sons, Inc.
Extreme Programming © Copyright 2011 John Wiley & Sons, Inc.

13 Criteria for Selecting a Methodology
PowerPoint Presentation for Dennis, Wixom & Roth Systems Analysis and Design, 4th Edition Copyright 2011© John Wiley & Sons, Inc. All rights reserved..

14 © Copyright 2011 John Wiley & Sons, Inc.
(cont’d) Important factors to consider in selecting the development methodology - Clarity of User Requirements - Familiarity with Technology - System Complexity - System Reliability - Short Time Schedules - Schedule Visibility © Copyright 2011 John Wiley & Sons, Inc.

15 Estimating the Project Time Frame
1. Estimating Project Time Using Industry Standards 2. Function point approach (Appendix 2A) © Copyright 2011 John Wiley & Sons, Inc.

16 Function Point Approach – Appendix 2A
Estimate project size Use function points Calculate TUFP Calculate APC Calculate TAFP Use lines of code (see figure 2A-3, p. 93) Estimate effort required (in person-months) 1.4 * thousands of lines of code Estimate time required (in months) 3 * person-months1/3 © Copyright 2011 John Wiley & Sons, Inc. 2-16

17 Developing the Work Plan
Identify Tasks © Copyright 2011 John Wiley & Sons, Inc.

18 © Copyright 2011 John Wiley & Sons, Inc.
(cont’d) Work Breakdown Structure © Copyright 2011 John Wiley & Sons, Inc.

19 © Copyright 2011 John Wiley & Sons, Inc.
(cont’d) The project work plan © Copyright 2011 John Wiley & Sons, Inc.

20 © Copyright 2011 John Wiley & Sons, Inc.
STAFFING THE PROJECT Staffing Plan - Staffing levels will change over a project’s lifetime - Adding staff may add more overhead than additional labor - Using teams of 8-10 reporting in a hierarchical structure can reduce complexity © Copyright 2011 John Wiley & Sons, Inc.

21 © Copyright 2011 John Wiley & Sons, Inc.
(cont’d) Reporting structure © Copyright 2011 John Wiley & Sons, Inc.

22 © Copyright 2011 John Wiley & Sons, Inc.
(cont’d) The staffing plan describes the kinds of people working on the project The project charter describes the project’s objectives and rules A functional lead manages a group of analysts A technical lead oversees progress of programmers and technical staff members © Copyright 2011 John Wiley & Sons, Inc.

23 © Copyright 2011 John Wiley & Sons, Inc.
Motivation Use monetary rewards cautiously Use intrinsic rewards Recognition Achievement The work itself Responsibility Advancement Chance to learn new skills © Copyright 2011 John Wiley & Sons, Inc.

24 © Copyright 2011 John Wiley & Sons, Inc.
Handling Conflict Clearly define plans for the project. Recognize project importance to organization. Project charter listing norms and ground rules. Develop schedule commitments ahead of time. Forecast other priorities and their possible impact on the project. © Copyright 2011 John Wiley & Sons, Inc.

25 Coordinating Project Activities
CASE (computer-aided software engineering) tools – A category of software that automate all or part of the development process. - Upper CASE - Lower CASE - Integrated CASE © Copyright 2011 John Wiley & Sons, Inc.

26 © Copyright 2011 John Wiley & Sons, Inc.
(cont’d) Standards Formal rules for naming files Forms indicating goals reached Programming guidelines Documentation Project binder Table of contents Continual updating © Copyright 2011 John Wiley & Sons, Inc.

27 MANAGING AND CONTROLLING THE PROJECT
The science (or art) of project management is in making trade-offs among three important concepts: - the size of the system, - the time to complete the project, and - the cost of the project. © Copyright 2011 John Wiley & Sons, Inc.

28 Tools for project management – Example of Gantt Chart
(cont’d) Tools for project management – Example of Gantt Chart © Copyright 2011 John Wiley & Sons, Inc.

29 © Copyright 2011 John Wiley & Sons, Inc.
Refining Estimates © Copyright 2011 John Wiley & Sons, Inc.

30 © Copyright 2011 John Wiley & Sons, Inc.
Managing Scope Scope creep – the most common reason for schedule and cost overruns occurs after the project is underway. The project manager should allow only absolutely necessary requirements to be added after the project begins. © Copyright 2011 John Wiley & Sons, Inc.

31 © Copyright 2011 John Wiley & Sons, Inc.
Timeboxing Set a fixed deadline for a project Reduce functionality, if necessary Don’t get hung up on the final “finishing touches” © Copyright 2011 John Wiley & Sons, Inc.

32 © Copyright 2011 John Wiley & Sons, Inc.
Timeboxing steps © Copyright 2011 John Wiley & Sons, Inc.

33 © Copyright 2011 John Wiley & Sons, Inc.
Managing Risk Risk assessment Actions to reduce risk Revised assessment © Copyright 2011 John Wiley & Sons, Inc.


Download ppt "PERTEMUAN-2 Chapter 2. Project Selection and Management"