Energy Saving Server Solutions Presented by MicroAge
IBM Confidential
2
Programme Introduction to MicroAge
Brett Beranek Marketing Director MicroAge Canada Energy-saving Server Solutions Martin Chagnon System X Specialist IBM Canada Q & A IBM Confidential
3
MicroAge at a glance Canada’s leading network of independently owned systems integrators and value- added resellers Over 40 locations across Canada, many in operation since 1981 Specializing in multi-vendor turnkey solutions: hardware + software + technical & professional services Vast experience in SME & public sector IBM Confidential
4
MicroAge Delivers IT Solutions Industry-leading IT products
IT consulting Procurement planning Training Technical support Flexible leasing/financing options IBM Confidential
5
MicroAge: your trusted business technology partner
Highly qualified local IT personnel Proven experience and IT knowledge breadth and depth Strength of national network Commitment to customer service excellence IBM Confidential
6
IBM Big Green Overview A Focus on Energy Efficiency in the Data Center
IBM Confidential
7
Top IT Business Priorities
Virtualization now the norm in most datacenters Power / Heat is top priority Blades everywhere 10GB Ethernet starting to break through Multi-core processors (six core now / octo-core 2009) Server Consolidation ‘green’ technologies IBM Confidential 7
8
Technologies that Matter
Innovation Manageability Serviceability Reduced Failures Scalability Performance Redundancy Flexibility HIGH AVAILABILITY Features Hot-swap SATA Drives Hot-swap fans in 1u server Light-path diagnostics Hot-spare / mirrored memory Blade Expansion Options SFF SCSI drives ServeRaid module Cool-Blue™ Portfolio PFA on more components eX4 Architecture IBM Confidential
9
Power in - $ out According to IDC, by 2010 for every $1 spent on hardware, 70 cents will be spent on power and cooling and by 2012 for every $1 spent on hardware, $1 will be spent on power and cooling. Data centers typically consume 15 times more energy per square foot than a typical office building IBM Confidential
10
How is energy typically used in the data center?
IT Load 55% 45% Power and Cooling Dept of Energy Stats IBM Confidential
11
Where does the energy go in a typical data center?
Average Data Center > 2,000 Sq. ft. and 3 years or older 33 Units Delivered 100 Unit Input 35 Unit Output Server, Storage, and Network Operations Chillers, Humidifiers, CRAC, PDU, UPS, Conversion, and Distribution 55% Power and Cooling 45% IT Load Chillers, humidifiers, CRAC, PDU, UPS, Lights, and Power distribution Servers, Storage, and Network Data source: Creating Energy-Efficient Data Centers, , U.S. Department of Energy , May 18, 2007 IBM Confidential
12
Typical Data Center Cooling Conversion
Why green data centers? Highly energy-intensive and rapidly growing Consume 10 to 100 times more energy per square foot than a typical office building Large potential impact on electricity supply and distribution Used about 45 billion kWh in 2005 At current rates, power requirements will double in 5 years. Typical Data Center Cooling Conversion IT Load Power and Cooling IT Load A 10% Improvement could save 20 billion kwH in the USA. 55% 45% 45% 55% Power and Cooling Data source: Creating Energy-Efficient Data Centers, , U.S. Department of Energy, May 18, 2007 IBM Confidential
13
IBM response – Project Big Green
“IBM to reallocate $1 billion a year” Armonk, May 10, 2007 Create an 850 member worldwide IBM “Green Team” of energy efficiency specialists. Plan, build or prepare our facilities to be Green Data Centers based on IBM best practices and innovative technologies in power and cooling. Use virtualization as the technology accelerator for our Green Data Centers – to drive utilization up and our annual power cost per square foot down. IBM Project Big Green Re-affirmed IBM’s long standing commitment to environmental leadership IBM energy conservation efforts from 1990 – 2005 have resulted in a 40% reduction in CO2 emissions and $250 billion in energy savings. IBM is committed to an additional 12% CO2 savings by 2012. IBM will double the compute capacity in our Green Data Centers by 2010 without increasing power consumption or carbon footprint, thus avoiding 5 billion kilowatt hours per year. IBM Confidential
14
RTP Green Demo Center Rack dense Blades, Servers and Storage Solutions
Description Extension of Systems and Technology Group’s RTP Executive Briefing Center providing a demonstration showcase for IBM and partner energy efficient data center elements Rack dense Blades, Servers and Storage Solutions Big Green Partnership Solutions: APC, Eaton, Emerson and GE Power/Workload Management HW &SW innovations Tivoli solutions, IBM Systems Director Active Energy Manager Rack Level Cooling Estimated size: 2000 sq ft Value proposition Providing an environment to showcase IBM and partner innovation in energy efficient data center solutions and to promote leadership technologies and showcasing IBM’s and partner “green” capabilities for our customers Co-location at IBM EBC allows broad exposure to large number of EBC events and integration into focused, Power & Cooling themed events. Onsite proximity to GTS, SWG and Retail Executive Briefing Centers for cross platform sales activity Business impact Drive awareness of IBM leadership position in energy efficient data center technology Promote sales for IBM solutions and data center services IBM Confidential
15
RTP Green Solution Center Layout
D F E C G A B
16
Broad energy ecosystem to holistically address the issue
Partnering with leading global data center power and cooling technology providers in the world Governments and energy utilities are also helping clients improve their overall energy efficiency RTP EBC Green Solutions Center Showcase – April 2008 IBM Confidential
17
Innovations to build energy-efficient data center
IBM Data Center Stored Cooling Solution – The ”Cool Battery” Increase the cooling capacity in existing or new data center Cut energy costs IBM Optimized Airflow Assessment for Cabling Replace cabling systems with high-performance fiber transport systems Improve cooling and reduce energy usage across data center IBM Scalable Modular Data Center Get racks, power, cooling, security and monitoring Deploy 500 and 1,000 square foot data centers in 8 to 12 weeks Manage integration and coordination of data center Save 15% over the price of a traditional approach IBM Thermal Analysis for High Density Computing Identify and resolve existing and potential heat-related issues Prevent outages and provide options for power savings and expansion IBM Confidential
18
Example – IBM Data Center Stored Cooling Solution
Thermal storage solution to improve efficiency of cooling system by 40-50% and reduce energy costs Shift energy usage to off-peak hours saving up to 30% Provide extra cooling capacity to enable growth and survive grid failures Thermal storage device between computer room air conditioners and chillers Cooling System with PCM (phase-change material) heat HVAC unit PCM storage Chiller Cooling tower heat IBM Confidential
19
How is energy typically used in the data center?
Server hardware 70% 30% Power supply, memory, fans, planar, drives . . . Processor IT Load 55% 45% Power and Cooling IBM Confidential
20
See BLUE , think GREEN $1B investment in energy initiatives
Technologies across full STG family Recognized as industry leader Modular systems contributions: Rear-door heat xChanger Bezel designs Back-to-back fans Vectored cooling Thermal sensors on planar Low-voltage processors 91% efficient power supplies Flash drives Active Energy Manager 20 IBM Confidential 20
21
IBM’s Vision For Green Data Centers Of Tomorrow
By the End of the Decade, IBM will - Decrease Server Power Consumption by 50% Cut expenses with leadership energy-efficiency Eliminate the Need for Data Center Air Conditioning Cap the carbon footprint for Data Centers Increase Compute Density by a factor of 10 Scale Data Center computing with no new construction Eliminate Servers From Landfills Completely recycle old servers IBM Confidential
22
Less Power and Cooling with IBM BladeCenter
Nearly 10% lower power and cooling costs with BladeCenter H Smarter thinking around power and cooling with IBM can lead to savings greater than 30% over traditional thinking LV processors BladeCenter E (super efficient chassis) Larger DIMMs Solid State Drives BladeCenter can deliver 10-30% more processors per rack for power restricted environments System IBM BladeCenter H Local Storage HP BladeSystem c7000 Server Blades Per Chassis 14 16 Peak Power Consumption per Server Blade (Watts) 300.63 333.42 IBM Advantage - Percent Less Power Consumption Per Blade 9.84% N/A Server Blade BTU/Hr IBM Advantage - Percent Less BTU/Hr Per Server Blade Combined Server and Cooling Power Consumption (kWh) 134.68 149.37 Combined (Server & Cooling) Cost per year Uniform Configuration (224 blades) $110,902.12 $122,999.76 Edison Power Study Summary Edison Group Blade Power Study (Nov 7, 2007). Comparable configurations IBM HS21XM vs. HP BL460c:: 2 x 1.86GHz processors, 8x1 GB of memory, RAID 1 internal storage. Test exerciser SpecJbb Ambient temperature 75F +/- 2F. 30% claim uses 1.86GHz LV, 4x2GB DIMMs, 16GB .SSD. IBM Confidential
23
Bladcenter Power There are two kinds of power: DC – the type of power the server components run on AC – the type of power that we distribute in the data center Power supply converts AC to DC Heat Heat 220V AC in 12V DC out 220V AC in 12V DC out Typical Power Supply BladeCenter Power Supply Example: 2000W AC in at 70% efficiency = 1400DC output Example: 2000W AC in at 91% efficiency = 1820DC output Because BladeCenter power supplies are over 90% energy efficient a lot less power is wasted as it is transitioned from AC to 12V DC for the server to run on
24
IBM Solid State Drives Power
Solid state drive power consumption is extremely low: 87% less than that of conventional drives Generate practically no noise compared to traditional HDDs Less power, more savings How cool? Single Blade BladeCenter Chassis 4 BC Chassis per Rack Average Power per blade 350W 3500W 16800W Power Consumption Reduced (from two 3.5” SAS drives to two Solid State Drives 16W – 2W = 14W x 2 drives) 28W 392W 1568W Cost Savings per year (at $.10 USD per KW) $27.99 (1) $391.90 $ IBM Confidential
25
Datacenter Improvement Efficient Power Supplies
IBM Technologies Server level cooling Moore’s Law Rack level cooling Low Voltage Smarter design Function Density Datacenter Improvement Airflow increases Utilization Current Leakage Power Management Power & Cooling Virtualization “Cool Blue” Technologies Imperative for dual/quad-core Lower noise/power levels Patented “Flo-thru” Advanced cooling technology Power Executive Heat Sinks Efficient Power Supplies IBM Confidential
26
Datacenter Improvement
IBM Technologies Server level cooling Moore’s Law Rack level cooling Low Voltage Smarter design Function Density Datacenter Improvement Airflow increases Utilization Current Leakage Power Management Power & Cooling Virtualization “Cool Blue” Technologies Imperative for dual/quad-core Lower noise/power levels Patented “Flo-thru” Advanced cooling technology Heat xChanger Bezel Design Hot Swap Fans IBM Confidential
27
IBM Rear Door Heat eXchanger
Ideal solution to help customers deal with increased BTU output for increasing dense server deployments Removes up to 50,000 BTU (14KVa) per rack Fits on IBM Enterprise rack Runs with Customer supplied water (with-in IBM specs) IBM Confidential
28
IBM Rear Door Heat eXchanger
Air temperature exiting RDHx prior to water circulation After water flow begins IBM Confidential
29
Innovation – IBM Rear Door Heat eXchanger Help Cut Exhaust Heat up to 50 or 60%
Solving today’s data center issues with mainframe thinking IBM used water in the mainframe back then… Helps: Increase density easily Solve “hot spots” in the data center Avoid cost of purchasing another AC unit Potentially postpone spend on major renovations in the data center After Before IBM Confidential
30
Georgia Tech and Cool Blue savings
On Feb 8, 2006 Georgia Institute of Technology dedicated their new super computer (named Razor) which, according to the press release, became the 41st fastest computer in the world. Razor features 1000 IBM BladeCenter LS20 server blades with 2000 dual-core AMD processors (4000 processing cores) in a 1000 ft2 space. The use of 12 Rear Door Heat eXchangers allowed for cooling with the existing CRAC units, avoiding a costly retrofit of the computer room -- Savings of $160,000* * IBM Confidential
31
How is energy typically used in the data center?
Server hardware Server loads 80% 20% Idle Resource usage rate IT Load Processor 55% 45% 70% 30% Power and Cooling Power supply, memory, fans, planar, drives . . . IBM Confidential
32
Typical Server Utilization Rates
Used Wasted Mainframe UNIX® x86 < 20%
33
Virtualization – Economic engine of a green data center
Server consolidation conserves energy Virtualization Software APP 5 APP 6 70% busy 4KW APP 1 APP 2 APP 3 APP 4 APP 7 APP 8 Total Power 4KW … APP 1 APP 2 APP 7 APP 8 APP 3 APP 4 System 1 System 2 System 4 10% busy 2KW 10% busy 2KW 10% busy 2KW Total Power 8KW Server consolidation exploiting virtualization is a very effective tool in reducing energy costs IBM Confidential
34
How could virtualization help you lower costs?
Immediate savings potential for: Reduce the number of devices in the data center Improve utilization of existing resources Save on data storage costs Reduce the number of software licenses to monitor and pay Allow recapture floor space for more profitable use Increase your power and cooling efficiencies Cut administrative expenses IBM Confidential
35
Active Energy Manager Compare actual vs. name plate power at system level Manage Power at the rack, server, blade, storage, switch and iPDU level Trend power use over time and view current data Ability to set power capping without performance throttling
36
IBM offerings help across the board
Data center Server hardware Server loads 70% 30% 80% 20% 55% 45% Power supply, memory, fans, planar, drives . . . Processor Idle Resource usage rate Power and Cooling. . . IT Load. . . Scalable Modular Data Center Data Center Facilities Design Energy Efficiency Assessments Thermal Analysis Server Consolidation Services Active Energy Management Storage and server virtualization leadership IBM BladeCenter IBM Cool Blue Rear Door Vectored Cooling Back to Back fans Efficient Power supplies IBM Confidential
37
Take advantage of innovative technologies
IBM has 40 years of experience in delivering energy efficiency IBM BladeCenter® Active Energy Manager IBM X-Architecture® IBM Confidential
38
Questions ? IBM Confidential