Welcome to Cloverland Electric Cooperative’s Special Board Meeting

Similar presentations


Presentation on theme: "Welcome to Cloverland Electric Cooperative’s Special Board Meeting"— Presentation transcript:

1 Welcome to Cloverland Electric Cooperative’s Special Board Meeting
October 24, 2016 The program will begin at 7 p.m.

2 Chairperson Virgil Monroe

3 President and CEO Dan Dasho

4 2016 Cost of Service Study Ratemaking Process Cost of Service Study
Revenue Requirement Rate Design

5 2016 Cost of Service Study Test Year
Test Year – 12 Months Ended December 2015 Test year operating results were adjusted for “known and measurable” changes (“Pro Forma Adjustments”) Standard approach in industry, for both regulated and non-regulated utilities

6 2016 Cost of Service Study Allocates the cooperative’s costs to members as fairly as possible based on their power usage patterns.

7 2016 Cost of Service Study Purpose of a Cost of Service Study
Determines if the revenue generated by a member class is covering its cost of providing service Determines subsidies between rate classes Determines cost based rate components

8 2016 Cost of Service Study Types of Costs in a Cost of Service Study
Fixed Cost Many are joint costs that must be allocated to each class of service Variable Cost

9 2016 Cost of Service Study Rate Design Principles
Rates should be fair and equitable for all members Members should pay the costs that they impose on the system Recover fixed costs through fixed charges

10 2016 Cost of Service Study Rate Design Principles
Recover variable costs through variable charges Reduce or eliminate subsidies between classes Simplify rate classes from 15 to 6

11 Times Interest Earned Ratio (TIER)
2016 Cost of Service Study Times Interest Earned Ratio (TIER) A calculation used to measure a company’s ability to meet its debt obligation.

12 Board Considered Three Options:
2016 Cost of Service Study Board Considered Three Options: 2.0 TIER = $5.68 Million 1.8 TIER = $3.98 Million 1.6 TIER = $2.27 Million Target TIER is 1.8 Normal range 1.6 to 2.2

13 1.6 TIER = $2.27 million or 2.9% increase
2016 Cost of Service Study 1.6 TIER = $2.27 million or 2.9% increase

14 Current FC (Facility Charge) Proposed FC
2016 Cost of Service Study Proposed Residential Changes Current FC (Facility Charge) Proposed FC $ $23.75 Current EC (Energy Charge) Proposed EC ESE $ $ CEC $ $

15 2016 Cost of Service Study Proposed Change Impacts on a
1,000 kWh Residential Electric Bill: ESE = + $10.75 CEC = - $11.03

16 2016 Cost of Service Study Proposed Small Commercial Changes
Proposed FC Single Phase $25.60 Three Phase $40.60 Proposed EC $

17 Proposed Demand Charge
2016 Cost of Service Study Proposed Large Power Changes Proposed FC $110 Proposed EC $ Proposed Demand Charge $8.80

18 Proposed Demand Charge
2016 Cost of Service Study Proposed Large Power Mining Changes Proposed FC $265.00 Proposed EC $ Proposed Demand Charge $15.00

19 2016 Cost of Service Study Proposed OPL Yard Lights Existing Equipment
175 mv $12.12 400 mv $23.75 250 sv $15.69 100 sv $10.42 LED $9.97

20 2016 Cost of Service Study Proposed OPL Yard Lights New Equipment
175 mv $14.19 400 mv $25.27 250 sv $16.92 100 sv $11.48 LED $11.17

21 Cooperative Facility Charge Great Lakes Energy $32.21 Alger Delta $25.00 Cloverland - Proposed $23.75 Midwest Energy $18.00 Presque Isle HomeWorks $17.50 Cherryland $15.00 Ontonagon REA Thumb Electric $12.00

22 Cooperative Energy Charge Ontonagon REA $0.1810 Alger Delta $0.1490 HomeWorks $0.1228 Thumb Electric $0.1209 Midwest Energy $0.1104 Cherryland $0.1098 Cloverland - Proposed $0.0914 Great Lakes Energy $0.0864 Presque Isle $0.0860 * Standard Residential Rate

23

24 Proposed New Supplemental Service Charges
Any special service at member’s request-outside working hours $200 Any special service at member’s request-during working hours $75 Meter test charge (includes meter reading)-field test required $75 Connections-outside working hours $200 Reconnect charge-outside working hours $200 Reconnect charge-during working hours $75 Did not pay field trip $75 Disconnect at pole-outside working hours $250

25 Proposed New Supplemental Service Charges
Disconnect at pole-during working hours $100 Nonsufficient funds charge $30 Deposit interest % Unauthorized use of electricity penalty (New) $1,000 Membership fee $5 Late payment penalty % Transfer service-no service interruption $20

26 Proposed 2017 PSCR Factors 2017 Maximum Authorized Factor Contingent Factor $ $