1 LESSON 3 Quality Assurance Risk Assessment
Lesson 4: Safety Stock

2 Definitions Risk Consequence (aka Risk Impact) - is driven by the requirements of the contract. It represents the consequence of an uncertain event or condition occurring. Risk consequence cannot be influenced by GCQA surveillance. So, unless the customer changes the requirement, the QAS cannot ever change the risk consequence. However, the scope of the surveillance must be based on the risk consequence. Risk Likelihood - is based on the supplier’s performance. It is perfectly acceptable to have a high-risk consequence and low- risk likelihood based on the supplier’s performance.

3 Lesson Introduction Given a contract technical data package, you will be able to complete a Quality Assurance (QA) risk assessment using the Risk Profile and Plan Tool.

4 Lesson Objectives Upon completion of this lesson, you should be able to: Explain the importance of QA risk assessment to Government Contract Quality Assurance (GCQA) surveillance planning. Outline the QA risk assessment process. Initiate a Risk Profile using the Risk Profile and Plan Tool. Develop a Facility Process List within the Risk Profile and Plan Tool. Assess the consequence of identified risks using the predefined conditions listed in the Risk Statement Generator of the Risk Profile and Plan Tool. Write a Risk Statement using the Risk Statement Generator in the Risk Profile and Plan Tool. Assess Performance Factors for all suppliers and those with higher-level requirements. Lesson 4: Safety Stock

5 Lesson Objectives (cont.)
Upon completion of this lesson, you should be able to: Identify potential causes of an identified risk using the Facility Process List and the Performance Factors Assessment section of the Risk Profile and Plan Tool. Assess the likelihood that an identified risk cause will occur using the Likelihood Table in the Risk Profile and Plan Tool. Identify the Data Collection and Analysis (DC&A) tab, to include the data to collect, data source, and scheduling data analysis. Examine risk assessment results for use in GCQA surveillance planning. Lesson 4: Safety Stock

6 Lesson Topics During this lesson, you will complete the following topics: Importance of QA Risk Assessment The QA Risk Assessment Process Initiating a Risk Profile Developing a Facility Process List Risk Consequence Writing Risk Statements Identifying Potential Causes of Risks Assessing Risk Likelihood Developing a DC&A Plan Examining Risk Assessment Results

7 WIIFM? This lesson is important because as a QAS, you will be required to perform the risk assessment process to plan/update GCQA surveillance.

8 Importance of QA Risk Assessment
Lesson Topics: Importance of QA Risk Assessment The QA Risk Assessment Process Initiating a Risk Profile Developing a Facility Process List Risk Consequence Writing Risk Statements Identifying Potential Causes of Risks Assessing Risk Likelihood Developing a Data Collection & Analysis Plan Examining Risk Assessment Results

9 Topic 1: Importance of QA Risk Assessment
Risk Assessment is the process used to identify, assess, and document risks to quality and technical performance of contracts that require GCQA surveillance. Lesson 4: Safety Stock

10 Why Risk Assessment Risk Assessment:
Provides an effective means of determining the appropriate type and amount of GCQA. Helps sort through all of the contractual requirements and identify risk causes for GCQA surveillance planning. Captures the risks, the consequences of the risks, the potential causes, and the likelihood of the cause occurring through the use of the Defense Contract Management Agency (DCMA) Risk Profile and Plan.

11 The QA Risk Assessment Process
Lesson Topics: Importance of QA Risk Assessment The QA Risk Assessment Process Initiating a Risk Profile Developing a Facility Process List Risk Consequence Writing Risk Statements Identifying Potential Causes of Risks Assessing Risk Likelihood Developing a Data Collection & Analysis Plan Examining Risk Assessment Results

12 Topic 2: The QA Risk Assessment Process
Risk assessment concept Risk statement Eight risk assessment process steps Risk Profile and Plan Tool Risk Assessment Consequence Assessment Risk Statement Potential Cause Assessment Likelihood Assessment Lesson 4: Safety Stock

13 QA Risk Assessment Concept
Consequence Assessment Risk Statement Potential Cause Assessment Likelihood Assessment

14 Consequence Assessment Likelihood Assessment
Risk Statements Risk Statement Consequence Assessment What would happen if the risk statement were to occur? Cause Assessment What process, product, or system failures would cause the risk statement to occur? Likelihood Assessment What is the likelihood that the cause or potential causes will occur?

15 Risk Assessment Process Steps
1: Initiate Risk Profile Steps 2: Develop/Update Facility Process List 3: Perform Risk Consequence Assessment 4: Generate Risk Statement(s) 5: Conduct Performance Factors Assessment 6: Identify Risk Cause(s) 7: Determine Likelihood 8: Complete Risk Profile

16 Question and Answer What is the first step in the Risk Assessment Process? Develop Performance Factors for All Suppliers Determine likelihood of risk cause Identify risk cause Initiate Risk Profile

17 Risk Profile & Plan Tool Spreadsheet Overview
Individual sections of the Risk Profile and Plan Tool

18 Table of Contents

19 Tab 1: Facility Process List
Lists all manufacturing and support processes associated with contract, program, or facility. This is not a list of surveillance requirements.

20 Tab 2: Risk Statement Generator
Identify risk consequence based on a predefined conditions and questions list to generate risk statements.

21 Tab 3: Performance Factors (All Suppliers)
Identifies potential causes of the risk statements based on the supplier’s current and past performance. Applicable to all suppliers [Federal Acquisition Regulation (FAR) and -11].

22 Tab 4: Performance Factors (Higher Level)
Identifies additional potential causes of the risk statements based on the supplier’s current and past performance. Applicable to FAR suppliers.

23 Tab 5: Risk Profile & Plan
Risk Profile and Plan Provides the minimum documentation of the applicability of specific risk factors and documents the relationship between risk factors and planned GCQA surveillance.

24 Tab 6: Sample Risk Profile Plan
Sample RPP Examples and explanatory notes.

25 Tab 7: Update Log RP&P Update Log Record of RPP updates, revisions …….
RPP configuration management.

26 Tab 8: DC&A Plan DC&A Plan
Results of data collection and analysis are used as a key component for the Performance Factor Assessment.

27 Tab 9: Risk Cause Likelihood
Used to assess the likelihood that the identified risk cause will occur.

28 Question and Answer Which tabs are used to identify the causes of risk statements based on the supplier’s current and past 12 months’ performance? (Select all that apply.) Risk Statement Generator Performance Factors (All Suppliers) Performance Factors (Higher Level) Risk Profile

29 Initiating a Risk Profile
Lesson Topics: Importance of QA Risk Assessment The QA Risk Assessment Process Initiating a Risk Profile Developing a Facility Process List Risk Consequence Writing Risk Statements Identifying Potential Causes of Risks Assessing Risk Likelihood Developing a Data Collection & Analysis Plan Examining Risk Assessment Results

30 Topic 3: Initiating a Risk Profile
Risk profile header information Minimum requirements Exceptions Lesson 4: Safety Stock

31 Initiate Risk Profile Header
Supplier Risk Profile Last Risk Evaluation Performed: Latest Change/Update RP&P update Log Supplier Name: CAGE Code Address: QA Specialist Name: Plan Type Supplier POC Contract Number Supplier POC Phone Program: Highest Level Quality Requirement: Risk Statements (Use risk statements generated from Risk statement generator tab) Consequence of Risk Statement Occuring Risk Causes (Supplier Processes or Controls) Likelihood of Risk Cause Occurring (See Consequence Indicators on RSG) (See Performance Factors) Consequence RR #### Likelihood RR High Moderate Low Minimum documentation required Basic supplier information Plan Type (program, contract, or facility) Quality Management System (QMS) requirement

32 Exceptions A Risk Profile may not be required for subcontract Letters of Delegation (LODs) received to verify or witness specific tasks Activities in the delegation serve as the surveillance plan LOD Select graphic for a sample LOD

33 QALI Exceptions (cont.)
Specific mandatory requirements in Quality Assurance Letters of Instruction (QALIs) or LODs do not require a risk assessment DCMA QA responsibility for prime contracts are not limited to the QALI requirements Specific requirements shall be identified in the surveillance plan QALI Select graphic for a sample QALI

34 Exercise 1: Risk Profile and Plan Header
Students work in pairs to complete the Risk Profile and Plan Header information in the Risk Profile & Plan tab. One student open the Blank_Risk_Profile_and_Plan.xlsx file to record the information. One student open: Completed Contract Technical Review (CTR) results (pdf) file from Module 3, Lesson 1 ValleyForgings_Contract.pdf Use the Contractor and Government Entity Code (CAGE) entered in the Module 1, Lesson 1 CTR Exercise Save Risk Profile and Plan with a new name for use in later exercises Time: 10 minutes

35 Developing a Facility Process List
Lesson Topics: Importance of QA Risk Assessment The QA Risk Assessment Process Initiating a Risk Profile Developing a Facility Process List Risk Consequence Writing Risk Statements Identifying Potential Causes of Risks Assessing Risk Likelihood Developing a Data Collection & Analysis Plan Examining Risk Assessment Results

36 Topic 4: Developing a Facility Process List
Facility Process List identifies processes suppliers use to: Design Produce Deliver Facility Process List is a tab on the Risk Profile and Plan Tool Supplier Process In-House/ Subcontracted (Make or Buy) Notes: Include comments, Vendor or Facility Location, etc. as applicable Control of Purchases In-house Purchasing Department, Bldg 35 Calibration Calibration lab, Bldg 6 Welding Subcontracted Joe Welding, Inc. Milling Machine shop Heat Treat Snell House of Heat Treating Inc. Eddy Current Test/Inspection lab Document Control QMS process Leakage Test Environmental Test Lab, Bldg 12 Electrochemical Machining Acme Plating Co. Painting Paint shop Lesson 4: Safety Stock

37 Facility Process List List is part of the Risk Profile and Plan Tool spreadsheet QMS may be listed as a single process or individual clauses Based on flow of product/data through the supplier’s facility Begin at packaging/shipping Work backward through all manufacturing and/or support processes Develop a Flow Chart (Recommended) Supplier Process In-House/ Subcontracted (Make or Buy) Notes: Include comments, Vendor or Facility Location, etc. As applicable Control of Purchases In-house Purchasing Department, Bldg 35 Calibration Calibration lab, Bldg 6 Welding Subcontracted Joe Welding, Inc. Milling Machine shop Heat Treat Snell House of Heat Treating Inc. Eddy Current Test/Inspection lab Document Control QMS process Leakage Test Environmental Test Lab, Bldg 12 Electrochemical Machining Acme Plating Co. Painting Paint shop

38 Facility Process List - Support Processes
Support processes are: Supplier processes that support some or all of the manufacturing processes required for product realization The output of support processes do not result in product characteristics Examples of process include: Control of purchases Material Inspection Receiving Report (MIRR) preparation Other similar support processes Wide Area Workflow (WAWF) or DD-250

39 Facility Process List - Special Processes
Special processes are any processes where the resulting output cannot be verified by subsequent measurement. Examples of process include: Shot peening Nondestructive Testing (NDT) Liquid penetrant Magnetic particle Ultrasonic Radiography

40 Facility Process List - Stryker Armored Vehicle Example
Supplier Process In-House/ Subcontracted (Make or Buy) Notes: Include comments, Vendor or Facility Location, etc. as applicable Control of Purchases In-house Purchasing Department, Bldg 35 Calibration Calibration lab, Bldg 6 Welding Subcontracted Joe Welding, Inc. Milling Machine shop Heat Treat Snell House of Heat Treating Inc. Eddy Current Test/Inspection lab Document Control QMS process Leakage Test Environmental Test Lab, Bldg 12 Electrochemical Machining Acme Plating Co. Painting Paint shop

41 Exercise 2: Develop Facility Process List
Pair with previous partner to develop the Facility Process List in the Facility Process List tab. One student open the saved Risk Profile and Plan Tool (xlsx) file to record the information. One student open: Completed CTR results (pdf) file from Module 3, Lesson 1 ValleyForgings_ManufacturingFlowChart.pdf ValleyForgings_Traveler.pdf Save the Risk Profile and Plan Time: 15 minutes

42 Risk CONSEQUENCE Lesson Topics: Importance of QA Risk Assessment
The QA Risk Assessment Process Initiating a Risk Profile Developing a Facility Process List Risk Consequence Writing Risk Statements Identifying Potential Causes of Risks Assessing Risk Likelihood Developing a Data Collection & Analysis Plan Examining Risk Assessment Results

43 Topic 5: Risk Consequence
Assess risk consequence by using the Risk Statement Generator tab in the Risk Profile and Plan tool.

44 Assess Risk Consequence
Risk Statement Generator tool Contains the indicators for high and moderate risk consequence Low risk consequence is the result with no high or moderate conditions

45 Determine the applicability of each indicator to the contract, facility, and/or product/service

46 Assess Risk Consequence (cont.)
Contract Technical Review provides basis for identifying risks    Contract or purchase order Key or critical characteristics or processes Memorandum of Agreement (MOA), QALI, or LOD Drawings and specifications Risk consequence assessment need not be repeated for each contract, unless additional requirements add an additional risk statements CTR eTool Manual

47 Exercise 3: Complete a Risk Consequence Assessment
Pair with previous partner to assess Risk Consequence in the Risk Statement Generator tab. One student open the saved Risk Profile and Plan Tool (xlsx) file to record the information. One student open: Completed CTR results (pdf) file from Module 3, Lesson 1 ValleyForgings_ManufacturingFlowChart.pdf ValleyForgings_Traveler.pdf Save the Risk Profile and Plan. Time: 15 minutes

48 Writing Risk Statements
Lesson Topics: Importance of QA Risk Assessment The QA Risk Assessment Process Initiating a Risk Profile Developing a Facility Process List Risk Consequence Writing Risk Statements Identifying Potential Causes of Risks Assessing Risk Likelihood Developing a Data Collection & Analysis Plan Examining Risk Assessment Results

49 Topic 6: Writing Risk Statements
Risks statements describe what the QAS wants to avoid. Risk Assessment What might go wrong? What are we afraid could happen? What are we trying to prevent?

50 Example: Risk Statement Generator (1 of 3)
Stryker Armored Vehicle Example Automatic High Risk Impact Indicators High NA For each "yes" answer, write a Risk Statement or revise the Risk Statement to answer the question: “What do we want to make sure doesn’t happen?” 1. Is the product identified as a Aviation or Ship Critical Safety Item? Yes No 2. Is the product a Non-Aviation or Non-Ship CSI? E.g. Life Support, Body Armor, Vehicle Armor, etc. 3. Is the contract subject to Agency Level Memorandum of Agreement (MOA), Delegation of Authority (DOA) that include commitments associated with a high risk characteristic or process, e.g. Space & Missile MCI, Ammunition?    4. Do the product specifications identify critical characteristics or processes? Supplier fails to control processes impacting ballistic capability. Supplier fails to control critical characteristics/processes.

51 Example: Risk Statement Generator (2 of 3)
Stryker Armored Vehicle Example Indicators the Influence level of Risk Impact NA Mod For each "yes" answer, write a Risk Statement or revise the Risk Statement to answer the question: “What do we want to make sure doesn’t happen?” 5. Have special surveillance instructions or risks been identified/documented in a customer QALI, MOA or LOD, which conforms with DFARS PGI Yes No 6. Have special surveillance instructions or risks been identified/documented by a Non-DoD customer (NASA, Coast Guard, etc.) in a MOA or LOD? 7. Has the product been designated as a Critical Application Item (CAI) by the procuring activity?    8. Is product complexity (inability to evaluate important characteristics at end item) considered a risk? Supplier delivers product that prevents weapons platform from meeting mission needs. Supplier fails to control major characteristics/ processes. Yes No 9. Do the product specifications identify major characteristics or processes? Yes No 10. Are there special methods, manpower, material, equipment, testing, or environmental requirements involved in manufacturing or producing the product (Special Processes)?

52 Example: Risk Statement Generator (3 of 3)
Stryker Armored Vehicle Example For each "yes" answer, write a Risk Statement or revise the Risk Statement to answer the question: Indicators the Influence level of Risk Impact NA Mod NA “What do we want to make sure doesn’t happen?” 11. Are critical or major components, assemblies or processes performed at the subcontractor level, e.g., electronic parts such as, microcircuits? Yes No 12. Is there first article inspection or testing requirements? Yes No 13. Would product replacement, because of failure, be affected by long lead times? Yes No 14. Are there special data, reviews, activities, deliverable plans, or reporting requirements? Yes No 15. Is there a Higher Level Quality Requirement ( )? If yes, identify QMS Standard (ISO 9001:2008, AS9100C, etc.) Yes No NOTE: If all questions above are answered as “No” apply the general risk statement and identify the risk as “Low” for impact. Low General Risk Statement: “Supplier fails to deliver conforming items.”    If all questions are answered “NO,” then the RISK is LOW. Use the General Risk Statement.

53 Example: Risk Profile and Plan
Risk Cause Occurring LOD Required? Remarks & location of records All records filed on the P-Drive at p:/central/DCMA Huntsville/ Quality/Surveillance Records Location of LOD Note vendor & Remarks. Records in Transfer the information from the Risk Statement Generator tab to the Risk Profile & Plan tab.

54 Exercise 4: Write Risk Statements
Pair with previous partner to write risk statements in the in the Risk Statement Generator tab. One student open the saved Risk Profile and Plan Tool (xlsx) file to record the information. One student open: Completed CTR results (pdf) file from Module 3, Lesson 1 ValleyForgings_ManufacturingFlowChart.pdf ValleyForgings_PerformanceHistory.pdf Write Risk Statements for each question answered “Yes” in Exercise 3. Transfer Risk Statements and impact levels to the Risk Profile & Plan tab. Save the Risk Profile and Plan. Time: 20 minutes

55 Identifying Potential Causes of Risks
Lesson Topics: Importance of QA Risk Assessment The QA Risk Assessment Process Initiating a Risk Profile Developing a Facility Process List Risk Consequence Writing Risk Statements Identifying Potential Causes of Risks Assessing Risk Likelihood Developing a Data Collection & Analysis Plan Examining Risk Assessment Results

56 Topic 7: Identifying Potential Causes of Risks
Risk Profile and Plan Tool Performance Factors tabs All suppliers Higher Level Facility Process tab Inspection processes Testing processes Any special processes Lesson 4: Safety Stock

57 Performance Factors Tabs

58 Performance Factors Assessment
Review identified factors Determine applicability to supplier within the last 12 months Identify “Yes,” “No,” “Unknown” (UNK), or “N/A” Data analysis is a key component

59 Performance Factors Assessment (cont.)
All Suppliers Higher Level Suppliers -11 quality requirements Contain minimum risk indicators that need to be addressed Dornier Aircraft Assembly Facility In Germany

60 Performance Factors All Suppliers Tab (1 of 5)

61 Performance Factors All Suppliers Tab (2 of 5)

62 Performance Factors All Suppliers Tab (3 of 5)
Use DCMA Counterfeit Detection & Avoidance System Checklist

63 Performance Factors All Suppliers Tab (4 of 5)

64 Performance Factors All Suppliers Tab (5 of 5)
Supplier Risk System (SRS) shall be reviewed for current risk indicators

65 Performance Factors –Higher Level Tab (1 of 3)

66 Performance Factors –Higher Level Tab (2 of 3)

67 Performance Factors –Higher Level Tab (3 of 3)

68 Exercise 5: Develop Performance Factors
Pair with previous partner to answer Performance Factor questions in the in the Performance Factors All Suppliers and Higher Level tabs. One student open the saved Risk Profile and Plan Tool (xlsx) file to record the information. One student open: ValleyForgings_PerformanceHistory.pdf Supplier Risk System (SRS) Save Risk Profile and Plan Time: 20 minutes

69 Identify Potential Risk Causes
Document an explanation when negative performance exists. Review explanations against each applicable risk statement to identify relationships.

70 Identify Potential Risk Causes (cont.)
Potential reasons why a risk statement will occur: Inspection or test process Product characteristic QMS clause Other contractual requirement

71 Identify Potential Risk Causes Performance Factors Tab

72 Document Risk Profile and Plan
Risk Cause Occurring Partial Audit Schedule & Interval Remarks & location of records All records filed on the P-Drive at p:/central/DCMA Huntsville/ Quality/Surveillance Records Document potential Risk Causes determined from evaluation of Performance Factors Assessment and Facility Process List on the Risk Profile and Plan Tool. Mandatory Available for GCQA Plan

73 Identify Risk Causes Using the Facility Process List
Use the Facility Process List to identify processes that if uncontrolled would result in the risk statement occurring. Supplier Process In-House/ Subcontracted (Make or Buy) Notes: Include comments, Vendor or Facility Location, etc. as applicable Control of Purchases In-house Purchasing Department, Bldg 35 Calibration Calibration lab, Bldg 6 Welding Subcontracted Joe Welding, Inc. Milling Machine shop Heat Treat Snell House of Heat Treating Inc. Eddy Current Test/Inspection lab Document Control QMS process Leakage Test Environmental Test Lab, Bldg 12 Electrochemical Machining Acme Plating Co. Painting Paint shop

74 Identify Risk Causes Using the Facility Process List (cont.)
In Standard Inspection (-2) contracts, with the default risk statement and no negative performance factors, the risk causes will include, as a minimum, the supplier’s: Inspection processes Testing processes Any special processes Supplier Process In-House/ Subcontracted (Make or Buy) Notes: Include comments, Vendor or Facility Location, etc. as applicable Control of Purchases In-house Purchasing Department, Bldg 35 Calibration Calibration lab, Bldg 6 Welding Subcontracted Joe Welding, Inc. Milling Machine shop Heat Treat Snell House of Heat Treating Inc. Eddy Current Test/Inspection lab Document Control QMS process Leakage Test Environmental Test Lab, Bldg 12 Electrochemical Machining Acme Plating Co. Painting Paint shop

75 Document Risk Profile and Plan
Partial Audit Schedule & Interval Risk Cause Occurring Remarks & location of records All records filed on the P-Drive at p:/central/DCMA Huntsville/ Quality/Surveillance Records Performance Factor Welding Facility Process List Mandatory Available for GCQA Plan

76 Exercise 6: Risk Cause Identification
Pair with previous partner to identify potential causes that could make the risk statements occur. One student open the saved Risk Profile and Plan Tool (xlsx) file to record the information. One student open ValleyForgings_PerformanceHistory.pdf. Record the risk causes in the Risk Profile & Plan tab, Risk Causes column. Save Risk Profile and Plan. Time: 20 minutes

77 Assessing Risk Occurrence Likelihood
Lesson Topics: Importance of QA Risk Assessment The QA Risk Assessment Process Initiating a Risk Profile Developing a Facility Process List Risk Consequence Writing Risk Statements Identifying Potential Causes of Risks Assessing Risk Likelihood Developing a Data Collection & Analysis Plan Examining Risk Assessment Results

78 Topic 8: Assessing Risk Likelihood
Likelihood Table in the Risk Profile and Plan Tool explains risk ratings: High Moderate Low Document likelihood ratings in the Risk Profile and Plan Tool. Lesson 4: Safety Stock

79 Risk Cause Likelihood Tab
Facility Process List Risk Statement Generator Perf. Factors -11 Perf. Factors All Suppliers Risk Profile & Plan DC&A Plan Risk Cause Likelihood Table of Content

80 Risk Likelihood Assessment
Determine the likelihood of occurrence for each risk cause identified. The more likely the risk cause is to occur, the more likely the risk statement will occur.

81 Risk Likelihood Assessment (cont.)
Use the Risk Likelihood Table to rate the risk causes; ratings must be supported by data analysis The Likelihood Ratings shall be documented in the Risk Profile and Plan Risk Likelihood Table

82 Risk Cause Likelihood Table
Performance data shows evidence of an inability to meet the contractual requirements No data available to show the Supplier’s ability to meet contractual requirements Performance data shows evidence that the contractual requirements will be met

83 Exercise 7: Risk Cause Likelihood Assessment
Pair with previous partner to assess the likelihood of each potential risk cause occurring and document in the Risk Profile & Plan tab. One student open the saved Risk Profile and Plan Tool (xlsx) file to record the information. Use Risk Cause Likelihood table categories. Base likelihood on previously identified/reviewed information in other spreadsheet tabs. Save Risk Profile and Plan. Time: 20 minutes

84 Developing a Data Collection & Analysis Plan
Lesson Topics: Importance of QA Risk Assessment The QA Risk Assessment Process Initiating a Risk Profile Developing a Facility Process List Risk Consequence Writing Risk Statements Identifying Potential Causes of Risks Assessing Risk Likelihood Developing a Data Collection & Analysis Plan Examining Risk Assessment Results

85 Topic 9: Developing a Data Collection & Analysis Plan
Document data in the DC&A Plan tab of the Risk Profile and Plan Tool to include: Data to collect Source of collected data Data analysis schedule Lesson 4: Safety Stock

86 Data Collection and Analysis Tab
Facility Process List Risk Statement Generator Perf. Factors -11 Perf. Factors All Suppliers Risk Profile & Plan DC&A Plan Risk Cause Likelihood Table of Content

87 Data Collection & Analysis Plan
The results of data analysis are a key component of likelihood rating.

88 Examining Risk Assessment Results
Lesson Topics: Importance of QA Risk Assessment The QA Risk Assessment Process Initiating a Risk Profile Developing a Facility Process List Risk Consequence Writing Risk Statements Identifying Potential Causes of Risks Assessing Risk Likelihood Developing a Data Collection & Analysis Plan Examining Risk Assessment Results

89 Topic 10: Examining Risk Assessment Results
Determine surveillance methods using completed Risk Profile and Plan Tool to include: Risk Statements Potential Risk Causes Document surveillance and update profile as necessary Lesson 4: Safety Stock

90 Examining Risk Assessment Results
Supplier Risk Profile GCQA Surveillance Schedule Last Risk Evaluation Performed: Latest Change/Update If the Risk Profile headings are properly filled out and this GCQA surveillance schedule is used as a component of the Risk Profile, then no additional headings are required for the GCQA Surveillance schedule. RP&P update Log Supplier Name: CAGE Code TABLE of CONTENTS DC&A Plan Address: QA Specialist Name: Facility Process List Plan Type Supplier POC Risk Statement Generator Contract Number Supplier POC Phone Perf Factors All suppliers Program: Highest Level Quality Requirement: Perf Factors Higher Level Sample Risk Profile Plan Surveillance Event Risk Statements (Use risk statements generated from Risk statement generator tab) Consequence of Risk Statement Occuring Risk Causes (Supplier Processes or Controls) Likelihood of Risk Cause Occurring Product Examination Process Review System Audit LOD Required? Remarks (See Consequence Indicators on RSG) (See Performance Factors) Frequency Intensity (AQL/Verification Level) Incremental or Single Event (Full) Interval Schedule QMS Baseline Completed Date (Procedures are Adequate) QMS Risk Based Start Date (QMS Deemed Compliant) QMS Element Review Frequency QMS Element Review Schedule Annual QMS Risk Assessment Date Document the vendor & location of LOD records in Remarks. Consequence RR #### Likelihood RR High Moderate Low Surveillance Plan Portion Mandatory Available for GCQA Plan

91 Risk Results Feed Surveillance
Risk Statement Supplier fails to control processes impacting ballistic capability: Risk Impact Rating – High Potential Risk Cause Purchasing: Likelihood Rating - High

92 Example: Risk Statement Generator
Automatic High Risk Impact Indicators High NA For each "yes" answer, write a Risk Statement or revise the Risk Statement to answer the question: “What do we want to make sure doesn’t happen?” 1. Is the product identified as a Aviation or Ship Critical Safety Item (CSI)? Yes No 2. Is the product a Non-Aviation or Non-Ship CSI? E.g. Life Support, Body Armor, Vehicle Armor, etc. 3. Is the contract subject to Agency Level Memorandum of Agreement (MOA), Delegation of Authority (DOA) that include commitments associated with a high risk characteristic or process, e.g. Space & Missile MCI, Ammunition? 4.    Do the product specifications identify critical characteristics or processes? Supplier fails to control processes impacting ballistic capability. Supplier fails to control critical characteristics/processes.

93 Document Risk Profile and Plan
Partial Audit Schedule & Interval Risk Cause Occurring Remarks & location of records All records filed on the P-Drive at p:/central/DCMA Huntsville/ Quality/Surveillance Records Performance Factor Welding Facility Process List Mandatory Available for GCQA Plan

94 Completed Risk Profile and Plan
Partial Audit Schedule & Interval Surveillance Plan Portion Purchasing X Welding X Mandatory Available for GCQA Plan

95 Risk Results Feed Surveillance (cont.)
Surveillance Methods System audit: Partial - Annually Process review: Purchase Orders (POs) - Full - Quarterly Product exam: Monthly sampling of POs, Acceptable Quality Level (AQL) 1.0

96 Completed Risk Profile and Plan
Partial Audit Interval Schedule & Remarks & location of records All records filed on the P-Drive at p:/central/DCMA Huntsville/Quality/Surveillance Records Monthly sampling of POs AQL 1.0 X M Q A Welding X Mandatory Available for GCQA Plan

97 Reevaluate and Update Reevaluate consequence and likelihood ratings
Changes in contract requirements Risk events or changes in performance Customer complaints, Corrective Action Requests (CARs), or data analysis Risk profile update Keep the profile current As applicable and annually as a minimum

98 Summary Having completed this lesson, you should now be able to:
Explain the importance of QA risk assessment to GCQA surveillance planning. Outline the QA risk assessment process. Initiate a Risk Profile using the Risk Profile and Plan Tool. Develop a Facility Process List within the Risk Profile and Plan Tool. Assess the consequence of identified risks using the predefined conditions listed in the Risk Statement Generator of the Risk Profile and Plan Tool. Write a Risk Statement using the Risk Statement Generator in the Risk Profile and Plan Tool. Lesson 4: Safety Stock

99 Summary (cont.) Having completed this lesson, you should now be able to: Assess Performance Factors for all suppliers and those with higher-level requirements. Identify potential causes of an identified risk using the Facility Process List and the Performance Factors Assessment section of the Risk Profile and Plan Tool. Assess the likelihood that an identified risk cause will occur using the Likelihood Table in the Risk Profile and Plan Tool. Identify the DC&A tab, to include the data to collect, data source, and scheduling data analysis. Examine risk assessment results for use in GCQA surveillance planning. Lesson 4: Safety Stock

100 Questions

101 Review Question 1 What does a risk statement ask?
The causes of uncontrolled processes The likelihood that a nonconforming product/service will be distributed The impact of providing a nonconforming product/service What the QAS wants to avoid

102 Review Question 2 Treat the product/service as a high risk
During a risk consequence assessment, the QAS answers “No” to all questions on the Risk Statement Generator tab in the Risk Profile and Plan tool. What significance will this have with regard to surveillance planning? Treat the product/service as a high risk Treat the product/service as a low risk It has no risk consequence as all other questions are “Yes” Treat the product/service as high risk and write special surveillance instructions

103 Review Question 3 Why is the QA risk assessment important to GCQA surveillance planning? It helps sort through all the contract requirements and identify risk causes for GCQA surveillance It helps the QAS conduct data analysis Provides an effective means of determining the appropriate type and amount of GCQA Both A and C

104 Review Question 4 (Select all that apply.)
Potential Risk causes are determined using the _____________________. Performance Factors Facility Process List Risk Likelihood Risk Statements

105 Case Study: Part 1 Contract Review and Assessment
Students work in pairs to resolve Case Study Situation(s). Use the Case Study: Part 1 – Contract Review and Assessment document (CMQ101_M3_CaseStudy.pdf). Class review/discussion upon completion. Time: 30 minutes