Download presentation
Presentation is loading. Please wait.
1
Madison Elementary School District
Loading dock Warehouse Bethany Home Rd Madison Elementary School District December 2016
2
Madison Park Student Commons
3
Madison Park Student Commons
4
Madison Park Student Commons
5
Madison District Warehouse
6
Madison District Warehouse
8040 square feet Completion date May 2017
7
Madison Meadows The new Madison Meadows classroom building is undergoing a holistic energy modeling exercise to optimize construction costs, design efficiently, maximize the APS utility incentive and select energy efficient equipment that proves to be cost-effective and a good investment. The investment will more than pay for itself in first-cost savings and improved APS incentives.
8
Madison Meadows
9
Rebates and Grants received
Madison #1 lighting rebates from APS $1,030 Madison Camelview lighting rebates from SRP $3,200 Madison Camelview lighting rebate from SRP $16,737 Madison Camelview parking lot lighting rebate from SRP $5,600 Madison Simis Lighting rebate from APS $25,445 Madison Rose Lane lighting rebates from APS $2,500 Madison Rose Lane lighting rebate $26,435 Madison Park lighting rebate from APS $29,099 Madison Meadows lighting rebate $28,788 Madison Heights lighting rebate from APS $27,251 Madison Simis HVAC equipment rebate from APS $17,889 Madison Simis HVAC package unit rebate from APS $11,800 Madison Heights HVAC/EMS upgrades rebate from APS $59,000 Madison Simis Elementary controls rebate from APS $22,122 Madison Rose Lane fluid cooler rebate from City of Phoenix $175 Madison Heights “APS Schools incentive” APS grant $52,500 Madison #1 campus wide roof rehabilitation SFB grant (preliminary approval received) Est $325,000 Madison Camelview fire alarm replacement, SFB grant $127,590 Totaling over $750,000
10
Rebates and other savings
Madison Camelview repair of chillers instead of replacement, prolonged life by estimated 5 years (capital funded). Madison Rose Lane replacement of compressors and heat exchangers $40,000 saved (capital funded). Madison Meadows cooling tower repairs instead of replacement. Installation of District wide water treatment for central plants extends life (capital funded). Madison #1 cooling tower replacement includes stainless instead of galvanized. Minimal investment ensures double life of components (bond funded). Repurposing of 3 year old 20 ton HVAC unit from Madison Park café to Madison Rose Lane (bond funded). Madison #1, campus wide roof rehabilitation (Applied and received preliminary SFB grant funding). Madison Camelview, fire alarm replacement (applied for and awarded SFB grant funding). District wide lighting upgrades, utilizing both bond and capital funds.
11
Upcoming projects Performing Arts Center 1/17-4/18
Madison Meadows Classroom Replacement 5/17-1/18 EMS Controls at Madison Park Middle School Roof renovations Madison #1 (SFB funded) Chiller pump replacement at Madison Camelview Elementary District Wide lighting upgrades (In-house/contracted) Questions?
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.