1 DATEX ENABLING TRAFFIC MANAGEMENT - COLLABORATING ITS SERVICE 2016-09 DATEX User Forum Dublin

2 DATEX II from Data Delivery to Road Network Operation  Requirements  Operators Needs to Manage Devices based on Conditions which may arise in neighboring Network VMS Messaging / SignSetting Cameras, Lane Control Systems, Traffic Lights  activate Combined Network Operation Traffic Management Plans (TMPs / TMPlan)

3 Background  Easyway DATEX II ESG2 TMS-SA03 “DATEX II and TMPs” joined action with DATEX ESG5 task force  Delivered Proposed Extension  FR-ES Pilot  Italian Motorway Operation Exchange  VMS oriented  Evolving TMP Model: IT TMPlan Extension on www.datex2.eu  EIP CIS Workitem Started 2015  TMPlan as specialization of Collaborative ITS Services  Use Case Description delivered Input to Exchange Platform Indipendent Model development  CIS and TMPlan Model delivered In the time needed to deliver an updated Exchange PIM, DATEX II Organisation managed to publish 2016 as version 2.3 extension

4 Information Exchange among Centres Information Delivery What happens ? Traffic Management / Infrastructure Management How to deal ? Improving Safety – Environment - Comfort Objectives

5 DATEX II System Boundaries Business Case: Information Delivery Main goal: Exchange Information among Centres

6 Data Delivery Business case  Data are delivered with only request to be received and syntactically checked  ACK - RECEIVED !

7 D2 CIS Business case  Data are delivered  To activate a processing based on those data Synthactic & Semanthic relevance Processing Results: Feedback ! CIS Domain Data Delivery

8 What is a CIS ? TMPlan perspective  In TMPlan perspective ITS Services are Services offered by a Road Operator or TCC Operator to improve the road network performance, increase safety and reduce pollution

9 ITS Services  Traveller Information  Traffic Management  Freight and Logistic

10 ITS Services Book and Usage of Resources offered by Infrastructure or Road Operator, Authorities, TCC, SP ( ITS Centres)  Broadcast Information  Network Management By means of devices and operator actions Closures, roadworks, alternative paths, lane closures, dynamic lane management, hardshoulder running, traffic lights, VMS setting Patrols to control and manage traffic  Infrastructure usage (Safety) Park Spaces Booking Tunnel Driving Slot / Rerouting Custom Check Services

11 ITS Collaborative Services definition ITS System1 serviceA serviceB serviceC ITS System2 serviceG serviceH serviceI ITS System3 serviceD serviceE serviceF ITS System serviceJ serviceK serviceL Call Service CIS ALPHA Server1 ( service B ) Server2 ( service H ) Server3 ( service D ) Agreement (Request) Execution (Implementation) CIS Services Meta Descriptions TCC Centres available services Measure as services combination

12 ITS Collaborative Services by DATEX ITS System1 serviceA serviceB serviceC ITS System2 serviceG serviceH serviceI ITS System3 serviceD serviceE serviceF ITS System serviceJ serviceK serviceL Call CISService «ALPHA» Node1 ( ServiceName B ) Node2 ( ServiceName 2 ) Node3 ( ServiceName A ) Agreement (Request) Execution (Implementation) CISService «Interface» (D2 Payload Feedback) CIService ( ServiceName, ServiceData (D2Payload), Condition (D2Payload(s)) CISService «Interface» (D2 Payload Feedback) CIService ( ServiceName, ServiceData (D2Payload), Condition (D2Payload(s)) CIS Services Meta Descriptions TCC Centres available services Measure as services combination D II node

13 DATEX Collaborative ITS Services Use of ITS Services among two or more ITS Centres to achieve a common goal  CIS operating implies  Semanthic  Handshaking DATEX Model for Semanthic Request and Feedback Information Exchange Specification for full interoperability  DATEX II used for triggering Distributed ITS Services

14 CIS Requirements and Design  Based on experience about impact on road conditions and frequency of situation occurring, Traffic Engineers may design solutions to cope with problems which frequently arouse in road operation or High Impact Situation.  We can depict a CIS Design generalizing TMPlan design expressed in Easyway TMS DG

15 Collaborative ITS Services modeling Business Scenario Feasibility Study CIS Activation Contract CIS Activation Contract Scenario (Triggering Conditions) Scenario (Triggering Conditions) Actions Measure resources organizations problem Workflow Management CIS (TMPlan) Design CIS (TMPlan) Design Service Request Design Phase Implementation Operation Problem Definition Feedback Strategy

16 Operating TMPlans 3 TMP Sharing and Approval 4 TMP Execution 5 Monitoring / Evolution 6 End of Operations 2 Measure Identification 1 TMP Trigger Condition

17 DATEX II TMPlan workflow management ? ? agreed implement done implemented done implemented implement propose Cohordinator Node manage Workflow Recognise Scenario and issue the First Request

18 Service Request Workflow Model service request compliant ok / ko Processing Phases ok / ko processed optional relevant application dependent intermediate outputs or rejected as not compliant final status Compliance check Semanthic and Processing errors

19 CIS Operating and Lifecycle Agreement Execution CIS Activation Phases CIS Operation activated updated terminated transition New CIS implemented CIS terminated CIS updated to new configuration: new CIS implemented activation update termination Implementation Request 2 phase 1 phase vs succeed fail

20 CIS Operation Workflow Management feedback Requester Centre Requester Centre Server Centre Server Centre Server Centre Server Centre Server Centre Server Centre Server Centre Server Centre approved rejected timeout implemented aborted timeout implemented aborted timeout request Agreement Execution Implementation Request implemented aborted timeout implemented aborted timeout Coordinator Service Implementers One Shot Two Phase

21 Modeling CIS Information D2 Payload(s) Situation Measured Data Elaborated Data D2 Payload(s) Situation Measured Data Elaborated Data CIS / TMPlan Publication SituationRecord Further Services Publications Scenario Actions Measure Strategy IT actions Process Broadcast generate VMS Messages IT Services Network Resources Configuration Goal CIS/ TMPlan Triggering Condition Operator Actions OperatorAction(s) Vms Sign Setting Car Parks Facilities Traffic Light / Cameras

22 How to Implement this in DATEX II Model  Service Interface  Not available by now  Data Delivery Exchange  Service Request Publication  Service Feedback Publication CISService «Interface» (D2 Payload Feedback) CIService ( ServiceName, ServiceData (D2Payload), Reference (D2Payload(s) ) Requester Server Service Request Service Feedback D II node

23 DATEX II CIS Model  Delivering to Service Implementer  Payload Publication Information to be processed Scenario Conditions Strategy, Measures, Actions Specific IT Services as VMS SignSetting  Service Request specifying Action requested on Service Agreeement Implementation Termination, Cancellation  Delivering to Service Requester  Service Request Feedback Request Status Status Reason

24 Modeling CIS  CIS Extension  Service Request  Service Feedback  WARNING: these are ITC data, not Payload Information  to be implemented in future DATEX II Exchange PIM / PSM Will not be included in any future CEN EN-16157 reserved to Traffic Road Data

25 CIS workflow I

26 CIS workflow II

27 Modeling TMPlan  TMPExtension  TMPTable Static Information TMP Strategy, Measures, Action IDs allowing to describe actions as Operator Actions  TMPActivationRequest Predefined TMP Activation referencing ID Not Predefine TMP Activation specifying specific Operator Action to be implemented  NOTE: TMPlan are Road Traffic Payload Information, so they are suitable to be included in future CEN TS-16157-n parts

28 CIS and TMPlan Model on DATEX website  Documentation available in DATEX Extensions Directory http://www.datex2.eu/content/datex-collaborative-its-services-and-traffic-management-plans- extension  CIS Use Case Description  CIS and TMPlan Extension Directory for 2.3 version CISExtension package CIS Request and Feedback Delivery CIS Workflow description TMPlanExtension TMP Workflow steps TMPActivation Delivery CIS Service Request and Feedback steps  CIS & TMPlan Extension Forum on website

29 Fabrizio Paoletti autostrade||Tech Autostrade Tech. S.p.A - Direzione Operations \ Software di ViabilitàDATEX TMG fpaoletti@autostrade.itfpaoletti@autostrade.it www.autostradetech.it Thank you for your attention


Download ppt "DATEX ENABLING TRAFFIC MANAGEMENT - COLLABORATING ITS SERVICE DATEX User Forum Dublin."

Similar presentations


Ads by Google