Presentation is loading. Please wait.

Presentation is loading. Please wait.

PM PILLAR VISION Go to ZERO breakdown, shortstop and speed loss, under safe operation condition with possible lowest cost. PM PILLAR MISSION Increases.

Similar presentations


Presentation on theme: "PM PILLAR VISION Go to ZERO breakdown, shortstop and speed loss, under safe operation condition with possible lowest cost. PM PILLAR MISSION Increases."— Presentation transcript:

1 PM PILLAR VISION Go to ZERO breakdown, shortstop and speed loss, under safe operation condition with possible lowest cost. PM PILLAR MISSION Increases Equipment Performance and Maintain maintenance cost at $0.8/hl end product 1 Support AM TEAMS 2 Improve OPI by reducing downtime


Download ppt "PM PILLAR VISION Go to ZERO breakdown, shortstop and speed loss, under safe operation condition with possible lowest cost. PM PILLAR MISSION Increases."

Similar presentations


Ads by Google