1 ~ Delivery Material Management ~ ~ デリバリー材料 ~ KLRDC 25 th February 2013

2 1 Table of Content 1.Current Issue 1.1 Store Management 1.2 Address 2.Location 2.1 GPS Coordinate 2.2 Aerial View 2.3 DC Truck Driveway 3.Layout 3.1 Loading Bay 3.2 Backroom 4.Planning 4.1 Delivery Plan Result 4.2 Delivery Material Movement 5.Operation 5.1 AEON DC 5.2 AEON PTC 6.Requirement 6.1 Equipment 6.2 Manpower 6.3 Facility 7.SCM Contact Person 7.1 AEON DC 7.2 AEON PTC

3 2 1. Delivery Material 1.1 Introduction Cart Rack Peak Season *Pallet Peak Season Metal Box DC Operation DC Delivery to Store Cart Rack Metal Box Pallet

4 3 2. Cart Rack 2.1 Total Cart Rack Management Factor New Unit New Unit Charter/ Rental Write Off Write Off Maintenance Daily Tracking Incident/ Accident Standard Rules & Usage

5 4 2. Cart Rack 2.2 Cart Rack Standard Usage for Xtra Size Cargo (Electrical) 25 kg Point of Gravity High density to collapse this side

6 5 2. Cart Rack 2.3 Cart Rack Type Normal Double Decker Medium X

7 6 2. Cart Rack 2.3 Cart Rack Physical Size (Inside) Medium 92cm 139cm 80cm 92cm 46cm

8 7 2. Cart Rack 2.3 Cart Rack Physical Size (Inside) Normal 107cm 152cm 81cm 93cm 59cm

9 8 2. Cart Rack 2.3 Cart Rack Physical Size (Inside) Double Decker 104cm 88cm 104cm 21cm

10 9 2. Cart Rack 2.4 Cart Rack Movement Report Point of View AEON Store Point of View AEON KL RDC Quantity keep by store every morning (Daily Opening Balance). Quantity delivered by each lorry from RDC. Quantity returned by each lorry to RDC. Quantity keep by store every night (Daily Closing Balance). Quantity keep by RDC for operation every morning (Daily Opening Balance). Quantity delivered by each lorry from RDC. Quantity returned by each lorry to RDC. Quantity new cart rack received. Quantity damaged cart rack separated. Quantity repaired cart rack received. Quantity of other factor/source…. Quantity keep by RDC every night (Daily Closing Balance).

11 10 3. Pallet 3.1 Total Pallet Management Factor Source Damaged/ Faulty Lead Time Specification Standard Return Standard Return Alternative Delivery Standard Cycle Flow Handling Standard Trace & Track

12 11 3. Pallet 3.2 Pallet Standards for DC – Store 1200mm X 1000mm 4-way entry pallet (ISO 6780) with chamfered bottom boards. Only wooden CHEP & LOSCAM pallet allowed. Safe working load of a minimum of one tonne.

13 12 3. Pallet 3.2 Pallet Standards for DC – Store (Continue) Full Pallet 1200mm (L) X 1000mm (W) X 1690mm (H), single SKU, full wrapping, maximum weight is 1,250Kg (1.25 Tonne) Half Pallet 1200mm (L) X 1000mm (W) X 850mm (H), single SKU, full wrapping, maximum weight is 625KG (0.65 Tonne) Multiple SKUs 1200mm (L) X 1000mm (W) X 1800mm (H), multiple SKU, full wrapping

14 13 3. Pallet 3.3 Pallet Usage Authorization Cart Rack Not Enough Daily Cart Rack Report Movement Approval to Use Pallet By SCM/DC Manager YES Delivery DC to Store By Pallet & Cart RackDC SCM & SOS Store Transfer merchandise from cart rack to foodline pallet Request Extra Cart Rack From Store Return all cart rack To DC Verify cart rack Quantity enough YES Stop Pallet Usage NO

15 14 3. Pallet 3.4 Pallet DC Loading Guide/Standard to Store Lorry Head - Cart Rack - Pallet (CHEP/Loscam) - Truck Safety Cargo Belt/Stopper Total: 12 Cart Rack 4 Pallet Lorry Head Total: 16 Cart Rack 2 Pallet Lorry Head Total: -NIL- Cart Rack 10 Pallet

16 15 3. Pallet 3.5 Pallet Store Loading Guide/Standard to DC (Empty Condition) Lorry Head - Cart Rack - Pallet (CHEP/Loscam) - Truck Safety Cargo Belt/Stopper *Empty pallet at most of the back of the truck *DO NOT place the pallet inside cart rack *Empty pallet at most of the back of the truck *DO NOT place the pallet inside cart rack

17 16 3. Pallet 3.6 Pallet Type in AEON LOSCAM Pallet CHEP Pallet Foodline Pallet Type Ownership Picture Usage Delivery Medium ONLY From Supplier to DC / From Supplier to Store From DC to Store Delivery Medium ONLY From Supplier to DC / From Supplier to Store From DC to Store Delivery Medium ONLY From Supplier to DC / From Supplier to Store From DC to Store Delivery Medium ONLY From Supplier to DC / From Supplier to Store From DC to Store Storage/Display Medium ONLY Backroom/Selling Floor

18 17 3. Pallet 3.7 Picture Sample X Not full wrapping using transparent plastic wrapping Only uses cello tape as a wrapping method Not full wrapping using transparent plastic wrapping Only uses cello tape as a wrapping method  Plastic wrapping covered from bottom base Cross/twist wrapping method used. Plastic wrapping covered from bottom base Cross/twist wrapping method used.

19 18 3. Pallet 3.7 Picture Sample X Not full wrapping using transparent plastic wrapping

20 19 4. Metal Box 4.1 Total Metal Box Management Factor New Unit New Unit Charter/ Rental Write Off Write Off Maintenance Daily Tracking Incident/ Accident Standard Rules & Usage

21 20 4. Metal Box 4.2 Dimension (Old Metal Box) 75.5cm 76cm 61cm 2cm Thickness 2cm Thickness

22 21 4. Metal Box 4.3 Current Issue Not suitable for wine & liquor Not user friendly and hard transfer merchandise from inside metal box by staff. High cost of maintenance.

23 22 4. Metal Box 4.4 Sample Picture

24 23 4. Metal Box 4.5 Future of Metal Box

25 24 5. GID to Store 5.2 GID Methods ETA Based ETD Based X 

26 25 5. GID to Store 5.1 Loading Bay Operation Hour

27 26 5. GID to Store 5.3 Lead Time Estimation

28 -This slide ends here – ありがとう THE END 27