The Groves Phase II ALR10AT51 Operated by: Foley Grove, LLC 2/24/15 Baldwin County Taken by: D. Denson.

Similar presentations


Presentation on theme: "The Groves Phase II ALR10AT51 Operated by: Foley Grove, LLC 2/24/15 Baldwin County Taken by: D. Denson."— Presentation transcript:

1 The Groves Phase II ALR10AT51 Operated by: Foley Grove, LLC 2/24/15 Baldwin County Taken by: D. Denson

2 2 Drainage ditch to pond/basin not stabilized and/or protected. Pipe collar not protected. Sediment observed in drainage ditch.

3 3 Drainage ditch slopes to pond/basin not stabilized and/or protected. Pipe collar not protected. Sediment observed in drainage ditch and in pipe.

4 4 Clearing phase.

5 5 Drainage ditch slopes to pond/basin not stabilized and/or protected. Sediment observed in drainage ditch.

6 6 Construction entrance/exit to site over drainage ditch to pond/basin not fully protected. Pipe collars not protected.

7 7

8 8

9 9 Clearing phase.

10 10 Clearing phase.

11 11 Pond/basin slopes not fully protected. Vegetation not maintained.

12 12 Discharge point.

13 13 Clearing phase.

14 14 Vegetative buffer.

15 15 Vegetative buffer from canal/drainage ditch located right of this photo.

16 16 Clearing phase.

17 17 Vegetative buffer from canal/drainage ditch located right of this photo.

18 18 Clearing phase.