Presentation is loading. Please wait.

Presentation is loading. Please wait.

MOL Mission Operations Laboratory MOL Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 On-Orbit Operations.

Similar presentations


Presentation on theme: "MOL Mission Operations Laboratory MOL Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 On-Orbit Operations."— Presentation transcript:

1 MOL Mission Operations Laboratory MOL Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 On-Orbit Operations Summary (OOS) Status Lori Manis EO10/Planning, Operations, and Analysis Branch (256) 544-2942 lori.manis@nasa.gov

2 MOL Mission Operations Laboratory Page 2 NASA MSFC Engineering Directorate Huntsville, Alabama Agenda  Stage Utilization Assumptions  Stage Utilization Overview  Issues/Concerns  Product Schedule  Contacts

3 MOL Mission Operations Laboratory Page 3 NASA MSFC Engineering Directorate Huntsville, Alabama Stage Utilization Assumptions  Since we have just begun the iURC coordination phase with the PDs, we do not have an OOS Overview (one- pager) at this time  The following spreadsheet documents payloads, contained in CR9274 - IDRD Annex 5, Increment 12 Payload Tactical Plan, that will operate during this increment  X’s in the stage column represent timeframe of ops not number of performances  Crew time is an estimate based on tactical planning and/or past operations  Minimize payload operations in Stage 12A.1 to mandatory science  Spreadsheet includes potential payloads rolling over from Increment 11

4 MOL Mission Operations Laboratory Page 4 NASA MSFC Engineering Directorate Huntsville, Alabama Stage Utilization Overview

5 MOL Mission Operations Laboratory Page 5 NASA MSFC Engineering Directorate Huntsville, Alabama Stage Utilization Overview (Cont.)

6 MOL Mission Operations Laboratory Page 6 NASA MSFC Engineering Directorate Huntsville, Alabama Issues/Concerns  Stage 12A.1 Crew Time  Currently, the IDRD has 0 hours of crew time allocated to payloads in this stage.  We need ~ 16 hours to accommodate our mandatory science (Renal Stone, GASMAP Healthcheck, Journals, SWAB, and MISSE PEC 5 Shutdown).  If time is not available for dewar cleanup, MELFI may remain powered during this stage.  Power Availability  Due to EPS configurations changes, Channels 2B and 4B will experience power interruptions during Flights 12A and 12A.1.  We need power management plans to minimize impact of outages on utilization (MELFI, TROPI, POEMS).  MSG Seal Replacement  Seals must be replaced before PromISS can operate in the 20P stage.

7 MOL Mission Operations Laboratory Page 7 NASA MSFC Engineering Directorate Huntsville, Alabama Product Schedule  iURC Internal Cadre Review: 4/13 – 4/25  iURC Coordination w/ PDs Complete: 4/27  iURC Promotions Complete, Software models and crew time rollups to PPMs: 5/6  iURC ECR Review: 5/20 – 6/3  Preliminary OOS Integration TIM in Moscow: 6/20 – 7/1  Gr&Cs ECR & PL OOS Review: 7/20 – 8/3  Final OOS Integration TIM in Houston: 8/15 – 8/26  Integrated OOS delivered: 8/30  EPAS Deliveries  Flight 12A: Preliminary – 5/9, Baseline – 9/8  Flight 12A.1: Preliminary – 7/8, Baseline – 11/9

8 MOL Mission Operations Laboratory Page 8 NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 Contacts If you have any questions concerning the planning products for Increment 12, please contact: Lori Manis – Lead (256) 544-2942 lori.manis@nasa.gov Jim Reaves (256) 961-4926 james.e.reaves@msfc.nasa.gov Ted Mavrotheris (256) 961-1291 ted.n.mavrotheris@msfc.nasa.gov


Download ppt "MOL Mission Operations Laboratory MOL Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 On-Orbit Operations."

Similar presentations


Ads by Google