Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 DREAMZWAY - MILESTONE. LOCATION MAP 2 DREAMZWAY - MILESTONE.

Similar presentations


Presentation on theme: "1 DREAMZWAY - MILESTONE. LOCATION MAP 2 DREAMZWAY - MILESTONE."— Presentation transcript:

1 1 DREAMZWAY - MILESTONE

2 LOCATION MAP 2 DREAMZWAY - MILESTONE

3 MILESTONE DETAILS ADDRESS GH-01, TECH-ZONE-4 PLOT AREA 9 ACRE TOTAL TOWERS 10 TOWERS LAUNCHED 4 POSSESSION 3.5 YRS. PARKING 2 LEVEL TOWER HEIGHT G + 23, G + 30 SIZES(SQ.FT) 980 / 1080 / 1230 / 1605 NO. OF LIFTS 3 ARCHITECT KGD FLATS LAUNCHED 544 COMMERCIAL INHOUSE SHOPPING ARCADE CLUB HOUSE + SWIMMING POOL 1 3 DREAMZWAY - MILESTONE

4 4

5 ARIAL VIEW OF PROJECT DREAMZWAY - MILESTONE 5

6 MILESTONE DREAMZWAY - MILESTONE 6 The MILE STONE is located near the first round about at GH 01,Tech Zone IV, Greater Noida West. It is a mix of affordable and premium high rise apartments which is developed in 9 acres of land. This project is one of the most economical property in Greater Noida west which has huge upside potential. The High Rise at River View affords an excellent panoramic view of Golf Course and Farm Houses around it. The projects has exclusive state of the art club and offers great recreational and sports facilities. The residents will have access to essential facilities like jogging track, amphitheatre, basketball & tennis court, billiards & card rooms and meditation centre to enable them to lead a healthy lifestyle.

7 SIGNIFICANT FEATURES DREAMZWAY - MILESTONE 7  CEILLING HEIGHT 10.25ft.  ONE YEAR MAINTENANCE FREE FOR EVERY APPARTMENT.  CONNECTING WALKWAY ON 23 rd FLOOR FOR EVERY TOWER  FULLY AUTOMATED PROJECT.  CONSTRUCTION TECHNIQUE – ALUMINIUM FORMWORK

8 LOCATION ADVANTAGE DREAMZWAY - MILESTONE 8  The project has connectivity to Sec-79 having being developed on 100 meter wide road, which is already in execution, and is supposed to be completed in next few months. Once connected THE MILESTONE will apparently be a part of Noida, having excellent connectivity with Delhi, Greater Noida, NH-24, Crossings Republic, Faridabad through FNG, it will also be benefited from proposed metro line that connects Greater Noida (West) from Noida City Centre.  THE MILESTONE will be less than a minutes’ drive from proposed metro station at Kisan Chowk, and would just be 3 minutes’ drive to the Sector 79 Metro station. It’s just 15 Min drive from DND, a few minutes’ drive to Ghaziabad railway Station and proposed Inter State Bus Terminal at Second round about of Noida Extension.

9 SOCIAL INFRASTRUCTURE DEVELOPMENT  The project is less than 2 mins. drive from upcoming proposed Metro Station & under construction Hindon bridge, connecting Greater Noida West to Noida at sector – 79.  With already an operational Sarvottam Engineering College, Ryan International school & DPS in the vicinity, it will be only a kilometer distance from upcoming Educational Hub.  With excellent social infrastructure like upcoming malls, multiplexes, retail, office space, international schools, hospital near to HCL biggest north India Corporate Office spread over 120 acres, this will be a complete living experience. Project offers an abode that is lined with lush greenery on all sides and has a soothing and rejuvenating aura. 9 DREAMZWAY - MILESTONE

10 PROJECT HIGHLIGHTS  3 S I DE OPEN PLOT  60 MT ROAD ACCESS  3 S I DE OPEN FLATS  NOVEL CONCEPT OF POD I UM  AMPLE PARK I NG SPACE - 2 LEVEL PARK I NG (TOWER & NON TOWER AREA)  CLOSE TO FNG CORR I DOR  2 MINS DRIVE FROM PROPOSED METRO STATION OF GREATER NOIDA WEST  1KM DISTANCE FROM UPCOMING EDUCATION HUB  NEAR TO HCL CORPORATE OFFICE LAND  THE PROJECT HAS CONNECTIVITY TO SEC-79, NOIDA HAVING BEING DEVELOPED ON 100 METER WIDE ROAD, WHICH IS ALREADY IN EXECUTION, AND IS SUPPOSED TO BE COMPLETED IN NEXT FEW MONTHS (OVER BRIDGE – HINDON RIVER) 10 DREAMZWAY - MILESTONE

11 ACCOMODATION OPTIONS TYPE OF UNIT ACCOMODATION SIZES (SQ.FT) TOWERSUNIT NO. 12 BHK + 2 TOI980MS-41,2,5,6 22 BHK + 2 TOI + STUDY1080MS-43,4,7,8 33 BHK + 2 TOI1230 MS-11,2,3,4 MS-2,31,4 43 BHK + 3 TOI + SER.1605MS-2,32,3 11 DREAMZWAY - MILESTONE

12 12 DREAMZWAY - MILESTONE

13 13 DREAMZWAY - MILESTONE

14 14 DREAMZWAY - MILESTONE

15 15 DREAMZWAY - MILESTONE

16 PRICE LIST... 16 DREAMZWAY - MILESTONE GH-01,Sec-Tech-Zone-IV,G.Noida (west) FLOORBSP (/sq. ft.)FLOORBSP (/sq. ft.) Mandatory Additional Charges 13000162750 22970172740ParticularsAmount / Rate 32940182730Covered Car Parking Charges250000 42910192720Club Membership Charges75000 52880202710Lease Rent ChargesRs.55/sq. ft. 62850212700EEC & FFCRs.50/sq. ft. 72840222690 82830232680 Mandatory View PLC Charges 92820242670Park FacingRs.50/sq. ft. 102810252660RoadFacingRs.50/sq. ft. 112800262650Corner FlatRs.50/sq. ft. 122790272640 132780282630 142770292620 152760302610

17 17 TERMS & CONDITION *No escalation charges for booked unit/No hidden charges. *Price list and payment plan can be changed without notice at sole discretion of the company. *DD/Cheque Should be in favour of ‘THE MILE STONE’. *Service Tax as applicable (i.e. According to Government of India). PAYMENT SCHEDULE FOR TOWERS WITH 30 FLOORS HEIGHTPAYMENT SCHEDULE FOR TOWERS WITH 23 FLOORS HEIGHT S.NoParticularsInstalmentsS.NoParticularsInstalments 1On Booking100000/-1On Booking100000/- 2Within 7 days from date of bookingBalance of 10%2Within 7 days from date of bookingBalance of 10% 3On Signing of FBA10%3On Signing of FBA10% 4On Commencement of Foundation10%4On Commencement of Foundation10% 5On Upper Basement Roof Slab10%5On Upper Basement Roof Slab10% 6On Ground Floor Roof Slab5%6On Ground Floor Roof Slab5% 7On 2nd Floor Roof Slab5%7On 2nd Floor Roof Slab5% 8On 5th Floor Roof Slab5%8On 5th Floor Roof Slab5% 9On 8th Floor Roof Slab2.5%9On 8th Floor Roof Slab5% 10On 12th Floor Roof Slab5%10On 11th Floor Roof Slab5% 11On 16th Floor Roof Slab5%11On 14th Floor Roof Slab5% 12On 20th Floor Roof Slab5%12On 17th Floor Roof Slab7.50% 13On 24th Flor Roof Slab5%13On 20th Flor Roof Slab5% 14On 27th Flor Roof Slab5%14On Top Floor Roof Slab5% 15On Top Floor Roof Slab5%15On Starting of Finishing Work5% 16On Starting of Finishing Work5%16On Possession 7.5% + OTHER CHARGES 17On Possession7.5% + OTHER CHARGES

18 18 DREAMZWAY - MILESTONE

19 ALUMINIUM FORMWORK SHUTTERING Aluminium formwork requires relatively less labour More seismic resistance Increased durability Lesser number of joints and reduced leakages Higher carpet area Smooth finishing of wall and slab Uniform quality of construction Negligible maintenance Faster completion It remarkably reduces time It gives a good finish without any requirement of Plaster Pre-engineering of Conducting & Plumbing is easier It has greater earthquake resistance It uses M50 Grade concrete which gives more strength and durability. https://www.youtube.com/watch?v=y3SfltCFOlY

20 Stair caseWalls + Ceiling Bird View

21 WHY MILESTONE...? Most reasonably price loaded with modern amenities with latest technology and unmatched location. MILESTONE offer best “ROI” for your investments. To obtain the peace, serenity and prosperity, this project is the most fruitful and hopeful for buyers.


Download ppt "1 DREAMZWAY - MILESTONE. LOCATION MAP 2 DREAMZWAY - MILESTONE."

Similar presentations


Ads by Google