Victor Guarino P.E. Mechanical Support Group High Energy Physics - ANL SC Design Effort Victor Guarino P.E.
2
Victor Guarino HEP-ANL Agenda for Today 1. Overview of SC Design and Issues (Victor Guarino – 20 minutes) 2. Krakow Design Concept (Jacek Niemiec –20 minutes) 3. Adapting the DESY MST Motion System to SC (Victor Guarino – 15 minutes) 4. DC-MST electrical and Safety Systems for SCT (Stefan Schlenstedt– 15 minutes) 5. DC-MST status and plans (Stefan Schlenstedt– 15 minutes) 6. Camera Mechanical Structure (Scott Wakely – 15 minutes) 7. Mech specifications for SC Design (Victor Guarino – 15 minutes) 8. Work Planning for the coming year (Victor/discussion 30 minutes)
3
Victor Guarino HEP-ANL SC Design Effort Overview of what has been done in the past. Current SC Design Concepts Krakow concept DESY-SC Concept Near term plan for engineering Planning for the PTDR
4
Victor Guarino HEP-ANL Schwarzschild-Couder Design 4 years Old Worked with UCLA on a Schwarzschild-Couder Telescope. Performed the structural design and motion system analysis. Worked on second iteration of a functioning prototype design. Complete cost estimate was obtained for the first iteration of the design. Developed complete drawings for the 2 nd iteration that were be used to get a cost estimate.
5
Victor Guarino HEP-ANL Schwarzschild-Couder Design 4 Years Old The design was iterated over time and the point spread function evaluated by UCLA.
6
Victor Guarino HEP-ANL Schwarzschild-Couder Design 4 Years Old The old design was supported from a main ring at the outer radius of the primary mirror. The secondary mirror was supported by trusses from the outer radius ring of the primary. The camera was supported by trusses from the inner radius ring of the primary. Camera supports do not shadow mirrors. The primary mirror was stiffened by a truss network which also acts as the counterbalance.
7
Victor Guarino HEP-ANL Two Current Concepts Old design was “HESS” like. There are many concepts that can be considered – we are restrained though by available recourses – In the short term we have to focus on concepts that can be adapted to the DESY motion system. Two current design concepts are being considered: Krakow design concept Primary supported concept
8
Victor Guarino HEP-ANL SC Design Mounted on DESY Positioner
9
Victor Guarino HEP-ANL SC Design Mounted on DESY Positioner
10
Victor Guarino HEP-ANL SC Design Mounted on DESY Positioner Preliminary caluculations indicate that the SC OSSwill have similar mass and moment of inertia to DC OSS Can be mounted directly onto existing DC MST motion system – minimizes engineering and development time. Tower can be shortened so that the camera is only 3m above ground for servicing. Shortened tower will allow Primary and secondary mirror structures will be close to the ground for mounting mirrors. Structural analysis is being performed to achieve the physics performance.
11
Victor Guarino HEP-ANL Krakow Design Concept See Next Talk
12
Victor Guarino HEP-ANL Where do we stand on a Design?? Only a 4 year old design has been evaluated for performance (PSF). Other design concepts exist but have not been evaluated structurally for performance or for cost. Do we have a true baseline design? Neither current concept have been evaluated structurally for performance/shadowing/fabrication/wind loading/natural frequency/cost and adaptability to the DESY DC-MST motion system.
13
Victor Guarino HEP-ANL Structural Analysis Needed Structural analysis is needed to evaluate the deformations of OSS of each design concept. Performance of the OSS evaluate by PSF calculations that are based on mirror deformations. UCLA has provided locations of mirror segmentation that can be used to create a realistic model of the primary/secondary mirror supports and to realistically evaluate the PSF. D X Y Z Front view
14
Victor Guarino HEP-ANL Structural Analysis Needed FEA analysis has begun on the two concepts presented. Need evaluation of performance.
15
Victor Guarino HEP-ANL Moving Forward……. In the MRI there is no support for developing a new motion system – assumption is that the DESY system is adopted with minimal modification. Need to evaluate concepts and determine a baseline based on performance/shadowing/cost and adaptability to DC- MST motion system. Perform detailed structural analysis and develop fabrication drawings. Strong engineering collaboration developed between ANL/DESY/Saclay/Zurich can be used to develop the SC design. Krakow group potentially can contribute engineering resources.
16
Victor Guarino HEP-ANL Steps To Develop a Design in the Near Term Complete the PTDR Define specifications (started and discussions later today) Define mirror locations and mounting points (UCLA) Develop the ability to calculate telescope performance (PSF) based on mirror deformations. (UCLA) Perform the structural analysis on promising concepts. Examine mirror deformations to understand the telescope performance. Use this evaluation to select a baseline design. Work closely with DESY group on integrating the DC Optimize the design for performance and cost. Develop fabrication drawings – obtain construction quotes – perform final detailed analysis.
17
Victor Guarino HEP-ANL