Rural Water Programme 2006 Evaluation of Progress John Fitzgerald John Fitzgerald Engineering Inspector Rural Water Programme 2006 Evaluation of Progress.

Similar presentations


Presentation on theme: "Rural Water Programme 2006 Evaluation of Progress John Fitzgerald John Fitzgerald Engineering Inspector Rural Water Programme 2006 Evaluation of Progress."— Presentation transcript:

1 Rural Water Programme 2006 Evaluation of Progress John Fitzgerald John Fitzgerald Engineering Inspector Rural Water Programme 2006 Evaluation of Progress John Fitzgerald John Fitzgerald Engineering Inspector

2 Procurement Guidance Documents Part A:Rural Water Modulw (DBO) Part B:Small Wastewater Projects Part C:Small Water Supply Projects Part A:Rural Water Modulw (DBO) Part B:Small Wastewater Projects Part C:Small Water Supply Projects

3 Chapter 12: Conventional Procurement for GWSS

4 Prior to Group employing Consulting Engineer Local Authority will (a)Prepare Brief (b)Determine indicative scale of fee acceptable for grant purposes – if scheme advances to construction. Prior to Group employing Consulting Engineer Local Authority will (a)Prepare Brief (b)Determine indicative scale of fee acceptable for grant purposes – if scheme advances to construction.

5 Scale of fees: (a)Fee per member for preparation of design drawings and calculations still valid. (b)Scale of fees based on Circ. 11/87 Preliminary Report 0 – 20% Design and Tender Drawings. Up to 30% Conditions of Contract / Specifications. 0 – 20% Construction Stage. 0 – 30% (c)PSDS accures separate fee. (ACEI scale of fee dated 9/2/96) Scale of fees: (a)Fee per member for preparation of design drawings and calculations still valid. (b)Scale of fees based on Circ. 11/87 Preliminary Report 0 – 20% Design and Tender Drawings. Up to 30% Conditions of Contract / Specifications. 0 – 20% Construction Stage. 0 – 30% (c)PSDS accures separate fee. (ACEI scale of fee dated 9/2/96)

6 L. Doyle One Price Three Prices National Newspapers OJEU The Procurement “Goalposts” OJEU National Newspapers Three Prices One Price Waste Water Directive 04/18/EC Waste Water Directive 04/18/EC Water Directive 04/17/EC Water Directive 04/17/EC

7 L. Doyle One Price Three Prices National Newspapers OJEU The Procurement “Goalposts” Waste Water Directive 04/18/EC Waste Water Directive 04/18/EC Water Directive 04/17/EC Water Directive 04/17/EC

8 Water Quality Water Conservation Water Quality Water Conservation

9 New & Upgrade(85%) Takeover(100%) New & Upgrade(85%) Takeover(100%)

10 DBO Civil (85%) M&E(100%) DBO Civil (85%) M&E(100%)

11 Metering grants for DBO only. Universal Metering Domestic (85% grant subject to max €300) Non-domestic (85%) grant subject to max €250) Additional CLAR funding Metering grants for DBO only. Universal Metering Domestic (85% grant subject to max €300) Non-domestic (85%) grant subject to max €250) Additional CLAR funding