Presentation is loading. Please wait.

Presentation is loading. Please wait.

Egyptian and Italian Cooperation Programme on Environment Quantitative Risk Assessment of Oil and Gas Plants Mr. Gaetano Battistella 1 Working Group n°.

Similar presentations


Presentation on theme: "Egyptian and Italian Cooperation Programme on Environment Quantitative Risk Assessment of Oil and Gas Plants Mr. Gaetano Battistella 1 Working Group n°."— Presentation transcript:

1 Egyptian and Italian Cooperation Programme on Environment Quantitative Risk Assessment of Oil and Gas Plants Mr. Gaetano Battistella 1 Working Group n°. 3 “Define quantitative risk assessment for a oil and gas industrial unit ” “Capacity Building and Strengthening Institutional Arrangement” Workshop: Quantitative risk assessment of oil and gas plants Mr. Gaetano Battistella APAT Agency for Environmental Protection and Technical Services

2 Egyptian and Italian Cooperation Programme on Environment Quantitative Risk Assessment of Oil and Gas Plants Mr. Gaetano Battistella 2 Objective Taking into account a specific oil and gas plant of your knowledge, as an example, carry out a major hazard quantitative risk assessment in a oil/gas industrial unit.

3 Egyptian and Italian Cooperation Programme on Environment Quantitative Risk Assessment of Oil and Gas Plants Mr. Gaetano Battistella 3 Activities 1 st phase: Establish criteria to define an incident as a major hazard (i.e. max incident frequency and minimal consequence OUTSIDE the plant limits) Perform a preliminary analysis of a chosen plant unit (critical points as process equipment, storage of dangerous substances, control loops, piping fittings, etc.) Incident(s) identification by a proper methodology (most normally utilised is the HAZOP – HAZard OPerability analysis). For each identified incident, calculation of frequency (outcomes/year) by utilising historical data-bases or/and fault tree analysis For each identified incident, calculation of distance for minimal established consequence outside the plant limits (if any) and related probability Risk calculation for each identified major hazard (individual or social (frequency vs consequence probability) 2 nd phase:Define a general draft for a safety report compilation Final presentation and discussion about Working Group activities.


Download ppt "Egyptian and Italian Cooperation Programme on Environment Quantitative Risk Assessment of Oil and Gas Plants Mr. Gaetano Battistella 1 Working Group n°."

Similar presentations


Ads by Google