Seafloor Network Km3Net phase1 meeting R. Papaleo 30 jan 2013.

Similar presentations


Presentation on theme: "Seafloor Network Km3Net phase1 meeting R. Papaleo 30 jan 2013."— Presentation transcript:

1 Seafloor Network Km3Net phase1 meeting R. Papaleo 30 jan 2013

2 Team F. Ameli G. Cacopardo R. Cocimano A. D’Amico R. Masullo M. Musumeci A. Orlando R. Papaleo

3 Where we are The status of the deep sea infrastructure in capo passero site consist of: Main Electro Optical Cable with 20 fibre G655 able to manage until100 kW Termination frame with MVC Alcatel 10kW 8 OF 3 ROV wet hybrid mateable connector NH type (ODI) [3 (out #1)+ 3 (out #2) + 2 (out #3)] PFE 50 kW R. Papaleo

4 Termination frame MVC 2 of 2 ec 3 of 2 ec 3 of 2 ec ODI hybrid connectors Main EOC Termination frame MVC Main EOC New Termination frame 20 o.f. 2 e.c. Rov wet mateable connectors Deployed System (2007) System to be realized and deployed (< 2014) R. Papaleo

5 Manifold MVC Main EOC 20 o.f.2 e.c. Rov wet mateable connectors 20 o.f.2 e.c. 4 o.f. 2 e.c. Connection Manifold - JB Manifold R. Papaleo

6 Manifold and possible DU connection scheme 20 o.f.2 e.c. Manifold 1 2345 Outp ut DU to be connectedSchedule 1#8 DU (NEMO Tower)< 2014 2#8 DU (NEMO Tower) #12 DU (DOM String) < 2014 3#6 DU String #6 DU string < 2014 TBD 4#12 DU StringTBD 5#12 DU StringTBD R. Papaleo

7 MVC and DU – Power constrains ItemPower @ unit # unitTotal power NEMO Tower 210 (W)81.680 (W) DOM String180 (W)325.760 (W) JBs + CU +..1.000 (W) TotalAbout 8.500 (W) The max power supply available is 8.5 kW @ 375V R. Papaleo

8 Manifold and possible DU connection scheme 20 o.f.2 e.c. Manifold 1 2345 4 optical fiber 2 electrical conductor 8 NEMO tower12 string or 8 NEMO tower 12 string JB#1JB#2JB#3JB#4JB#5 R. Papaleo

9 Power Pod Goal To manage the power supply towards the DUs PBS 1 Vessel 130 (diametro interno) x L (da definire) 1 PSS board= Power Supply System 1 PCS board= Power Control System 1 electric hose [10 m with rov wet mateable electric connector] 1 electric connector 8 PIN  POWER – ELECTRONICS 1 electric connector 4 PIN  POWER – OPTICAL 1 electric connector 16 PIN  POWER – ELECTRICAL MANIFOLD Power POD (*) Electrical Optical Electrical Manifold R. Papaleo

10 Electrical POD Goal Management of JB system PBS 1 Vessel 130 (diametro interno) x L (da definire) 1 FCM board 1 PCS board= Power Control System 1 electric connector 8 PIN  POWER – ELECTRONICS 1 electric connector 8 PIN  Acoustic TX 1 optic connector 4 PIN  ELECTRICAL - OPTICAL Electrical POD (*) Optical Power R. Papaleo

11 Optical POD Goal To manage optical data flux from / to shore PBS 1 Vessel 130 (diametro interno) x L (da definire) 16 optical filters 1 optic connector 16 PIN  OPTICAL – MANIFOLD OTTICO 1 electric connector 4 PIN  OPTICAL - ELECTRICAL 1 optic connector 4 PIN  ELECTRICAL – OPTICAL 1 penetrator (optical connector) + 10 m cable + optic rov wet mateable connector Optical POD (*) 10 m Connector or penetrator (TBD) Optical manifold Electrical Power R. Papaleo

12 Tower Base Optical POD (*) Electrical POD (*) Power POD (*) Optical ROV wet mateable connector – 2 Fibres G655 APC Electrical ROV wet mateable connector – 2 electrical wires 375V 5 kW Electrical Connector 10 m Connector or penetrator (TBD) (*) All POD are 1 ATM 14 13 12 3 2 1 28 optical fibres G655 28 Electrical wires 375 V 500 W Opticon R. Papaleo

13 Seafloor network  string The main structure of the JB will remain the same Power POD Electrical POD Frame Optical POD (if possible) What will change? Optical POD components  to be provided by NIKHEF in order to be Compliant with POD dimension Manifold JB – DU R. Papaleo