Download presentation
Presentation is loading. Please wait.
Published byOswald McDaniel Modified over 9 years ago
1
NATIONAL DEVELOPMENT CORPORATION1
2
2 PRESENTATION OUTLINE 1. Tanzania Facts and Figures 2. National Development Corporation 3. Agribusiness 4. Mining 5. Power Transmission Lines 6. Railway Lines 7. Roads 8. Ports 9. Airports and Airstrips 10. Industrial 11. Industrial Parks/ Estates 12. Real Estate 13. Research and Pipeline Projects 14. Capacity Building 15. Projects Under Implementation 16. Contacts
3
NATIONAL DEVELOPMENT CORPORATION3 CapitalDodoma Largest CityDar es Salaam Total Area945,200 km 2 Population (2009 est.)43,740,000 GDP per capita (2009 est.)USD 550 International airports (3)Dar es Salaam Kilimanjaro Zanzibar Ports (3)Dar es Salaam Tanga Mtwara Major economic sectorsAgriculture Mining 1.0 Tanzania: Facts & Figures
4
NATIONAL DEVELOPMENT CORPORATION4 2.0 National Development Corporation Investment wing of the Government of the United Republic of Tanzania Collaboration along side the Ministry of Industry and Trade (MIT) Vision: Leading Industrialization in Tanzania Mission: Initiating and implementation of strategic industrial development projects in partnership with the private sector. Implementation Strategy: Utilization of smart PPP as reflected in JVA, SSA, etc, collaboration and networking with Strategic Investors. Some Projects are highlighted below:
5
NATIONAL DEVELOPMENT CORPORATION5 3.0 Mining and Processing (a) Small Scale Mining and Beneficiation (Matinje) US$7 million (b) Lapidary/ Refinery (Arusha) US$350 million (c) Nickel Cluster (kabanga, etc) US$350 million
6
NATIONAL DEVELOPMENT CORPORATION6 3.0 Mining and Processing
7
NATIONAL DEVELOPMENT CORPORATION7 3.0 Mining and Processing (a) Small Scale Mining and Beneficiation (Matinje) US$7 million (b) Lapidary/ Refinery (Arusha) US$350 million (c) Nickel Cluster (kabanga, etc) US$350 million (d) Geothermal (Kisaki, etc) US$350 million
8
NATIONAL DEVELOPMENT CORPORATION8 Mineralization on gold and base metals licences have some structurally controlled patterns Drilling confirms mineralization below surface (under laterite cover) Drilling of geothermal wells confirms potential as initial phase of feasibility study. 8 3.0 Mining and Processing
9
NATIONAL DEVELOPMENT CORPORATION9 4.0 Agribusiness Palm Oil US$160 million Sweet Sorghum & Sesame Edible Oils and Bio Fuel US$30 million Rubber Plantations and Processing Units US$ 1.5 million Meat Processing Plants (3) US$ 180 million
10
NATIONAL DEVELOPMENT CORPORATION10 5.0 Power Transmission Lines Infrastructure Mufindi Power Transmission Line (400kV) US$ 155 million Karonga Power Inter-Connector (400kV) US$ 30 million Mbeya Power Inter-Connector (400kV) US$ 60 million Songea Power Inter-Connector (220kV) US$ 55 million Strengthening of the National Power Grid US$ 800 million
11
NATIONAL DEVELOPMENT CORPORATION11 6.0 Railway Infrastructure Mtwara – Mchuchuma – Mbambabay – Railway Line (1,017km) US$2.3 billion Tanga – Arusha – Musoma Railway Line with Spur to Minjingu and Lake Natron Soda Ash Project US$2.3 billion Kange – Mwambani Railway Line US$22 million Mwambani – Mbegani Railway Line US$45 million Dar es Salaam – Isaka – Kigali – Gitega – Musongoti (Burundi) Railway Line US$3.2 billion
12
NATIONAL DEVELOPMENT CORPORATION12 7.0 Roads Infrastructure Mchuchuma – Liganga – Madaba Road US$200 million Kitai – Ngaka – Ndumbi Road US$100 million Musoma – Arusha Road US$612.6 million Matai (Tanzania) – Mbala (Zambia) Road US$90 million
13
NATIONAL DEVELOPMENT CORPORATION13 8.0 Ports Infrastructure Mtwara Port – US$2.5 billion Tanga (Mwambani) Port – USD $850 million Mbegani (Bagamoyo) Port – US$1 billion Musoma Port – US$320 million Mbamba Bay, Itungi and Manda Ports – US$300 million Heavy Capacity Ferry (in Lake Nyasa) – US$30 million Kasanga Port – US$150 million
14
NATIONAL DEVELOPMENT CORPORATION14 9. Airports and Airstrips Infrastructure Upgrading of the airports of Mtwara, Rukwa and Kigoma US$270 million Design and construction of Ludewa airstrip (Mchuchuma and Liganga Project Sites) US$200 million Vale – Brazil Operating for iron ore
15
NATIONAL DEVELOPMENT CORPORATION15 10.0 Industrial Development Revival and Expansion of General Tyre East Africa Limited (GTEA) Plant US$ 650 million Tractor Assembly Factory and Farm Implements US$300 million Integrated Textile Mill US$ 50 million Integrated Leather Processing Factory US$ 50 million
16
NATIONAL DEVELOPMENT CORPORATION16 11.0 Industrial Parks/ Estates Tanzania Automobile Manufacturing Company (TAMCO) US$10 million Kange Industrial Park US$8 million Nyanza Industrial Park US$2 million Kilimanjaro Machine Tool Center (KMTC) US$20 million
17
NATIONAL DEVELOPMENT CORPORATION17 12.0 Real Estate/ Residential Residential Houses – Rehabilitation, upgrading or construction (US$50 million) Tanzania Automobile Manufacturing Company (TAMCO) US$10 million Kange Industrial Park US$ 10 million Nyanza Glass Work US$ 10 million Kilimanjaro Machine Tool Center (KMTC) US$ 20 million
18
NATIONAL DEVELOPMENT CORPORATION18 13.0 Research or Pipeline Projects Tanzania – Malawi Cross-border Integrated Industrial Cluster US$5 billion Solar Power Projects US$ 400 million Pangani Quarry and Concrete Prefabs Factory US$10 million Fruit Processing Projects US$35 million
19
NATIONAL DEVELOPMENT CORPORATION19 14.0 Capacity Building Projects Spatial Development Initiative (SDI) / Development Corridors (DC) US$1.5 billion Institutional Capacity Building-Gas to Industry Modeling and Lesser Flamingo studies US$500 million Community Empowerment and Economic Development through PACA US$0.5 billion
20
NATIONAL DEVELOPMENT CORPORATION20 15.0 Projects under Implementation Ngaka Coal to Power US$200 million Biolarvicides Plant US$30 million Singida Wind to Power US$60 million Kasi Mpya Sponge Iron (Katewaka) US$150 million Mchuchuma Coal to Electricity and Liganga Iron Ore to Steel Plants US$3.0 Billion
21
NATIONAL DEVELOPMENT CORPORATION21 16.0 Projects under Collaborators Mpanda Gold Sekenke Gold Geothermal
22
NATIONAL DEVELOPMENT CORPORATION22 (a) Mpanda Licences (US$ 745.0million) Nickel, Lead, Copper (Basemetals); Gold, Manganese, Iron Ore, PGM, Rare Earth Elements (REE)/ Minerals PL 4393/2007 Kabulunywele, renewed and split into 2 to retain same size of198.8 sq.km PL 4655/2007 Kabulunywele, renewed and split into 2 to retain same size of 198.70 sq.km PL 7224/2011 Nkasi, Size 46sq.km 22
23
NATIONAL DEVELOPMENT CORPORATION23 Mpanda Mineral Field: Location 23
24
NATIONAL DEVELOPMENT CORPORATION24 Project Summary: Mpanda Geology 1 2 3
25
NATIONAL DEVELOPMENT CORPORATION25 Project Summary: Mpanda Magnetics
26
NATIONAL DEVELOPMENT CORPORATION26 Project Summary: Mpanda (Nkasi) Magnetics 26
27
NATIONAL DEVELOPMENT CORPORATION27 Project Summary: Mpanda Minerals Copper Nickel Manganese Iron ore REE Gold Lead Fe-Mn outcrop
28
NATIONAL DEVELOPMENT CORPORATION28 (b) Sekenke Gold (US$660.0million)
29
NATIONAL DEVELOPMENT CORPORATION29 Project Summary: Sekenke Geology
30
NATIONAL DEVELOPMENT CORPORATION30 Project Summary: Sekenke Magnetics
31
NATIONAL DEVELOPMENT CORPORATION31 (c) Geothermal –Kisaki (US$625.0million) Two licences: PL6373/2010 covering 11.84 sq.km and PL6373/2010 covering 86.91 sq.km Hot water spring in the project area One of several projects by the company Activities: to undertake detailed geophysics and drilling to establish geothermal potential, and complete a bankable feasibility estimated at US$10- 25m 31
32
NATIONAL DEVELOPMENT CORPORATION32 (g) Way forward: Plan on each gold/ base metal licence Activity Estimated costs US$(,000) Appraisal of previous information, records, etc. 60 Target generation through geochemical, geophysical and geological surveys 200 Lab analysis of geological and geochemical samples 60 Initial Rotary Air Core (RAB)/Reversed Circulation (RC) drilling of selected targets (2000-3000m each $50) 1,500 Lab analysis (1meter samples @ 20-30)180 Interpretation and reporting150 Min estimated Total on each licence2,150
33
NATIONAL DEVELOPMENT CORPORATION33 16.0 CONTACTS CEO: Mr. Gideon Nasari Managing Director National Development Corporation gnasari@tancoalenergy.comgnasari@tancoalenergy.com, gnasari@zantel.comgnasari@zantel.com Presenter: Mr. Godwill G. Wanga Director of Research, Planning and Industrialists Development National Development Corporation ggwanga@gmail.com