Download presentation
Presentation is loading. Please wait.
Published byShanna Charles Modified over 9 years ago
1
Tata consultancy services CONTENTS Engineering Change Management in the SAP System Role of Engineering Change Management module Applications areas of Engineering Change Management Concepts of engineering change management Flow of Business Transaction Processing in ECR
2
Tata consultancy services Engineering Change Management in the SAP System INTRODUCTION Changes to objects such as material master,bill of material, routings etc. become necessary due to any of following reasons Changes in Technical requirements. Changes in Design. Advent of cheaper,superior materials. Commercial reasons:To acquire competitive edge in the market.
3
Tata consultancy services Role of Engineering Change Management module Control and documentation of changes to objects. Enables changes to objects at different dates Reproduce the processing status of a change object at different times(before and after change).
4
Tata consultancy services Applications areas of Engineering Change Management The object types for the change objects are as follows: Bills of material of various BOM categories Task lists of various task list types Document Material Objects in the classification system: Characteristics Characteristics of Class Classification Dependency Configuration Profile
5
Tata consultancy services Change objects from Environment Management: Material Phrase Dangerous goods Applications areas of Engineering Change Management (cont..)
6
Tata consultancy services Concepts of engineering change management Object types: It is a generic term representing a group of similar data objects eg. Bill of material,task list. Object: it is an instance of specific object type. Eg 100001 is material number(object) of type material (object type). Change number : It is numeric/alphanumeric code used to change objects.Changes are done with reference to change number. Change master record: It is a master record that contains information necessary for the management and control of changes. Revision Level: It is alphanumeric code representing the processing status of an object.
7
Tata consultancy services Concepts (cont..) ECR: An engineering change request (ECR) is a change master record with reference to a change type. ECO: Every ECR must be converted into Engineering changer order which enables us to change objects. Change Type : It is a key which controls the change process of an ECR / ECO. Object management record: It is a record to control changes to one particular object and document these changes.
8
Tata consultancy services Concepts (cont..) Valid from date: The date from which the changes made to objects with respect to change number comes into effect. Release key: It controls changes made to objects. The release key in the change master record controls which areas the changes that are made with reference to the allocated change numbers are released for. Revision level: revision levels identify material or document changes that are made with reference to a change number
9
Tata consultancy services Flow of Business Transaction Processing in ECR There are three major stages in the flow of business transaction processing: Creating an ECR. Enter descriptions,change type,objects to be changed etc. Checking an ECR and converting into ECO(engineering change order ). Check the feasibility of change, modify system status,convert ECR TO ECO. Changing objects and completing changes. Make changes to objects with respect to change number of ECR Change the system status of ECR to change complete.
Similar presentations
© 2025 SlidePlayer.com Inc.
All rights reserved.