Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine 5-9-2012 Bologna.

Similar presentations


Presentation on theme: "Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine 5-9-2012 Bologna."— Presentation transcript:

1 Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine 5-9-2012 Bologna

2 Objectives of PPM-DU Verification DOM in the network Verification of the DU design Verification of deployment with the LOM

3 PPM-DU layout 3 active DOM’s (place?) <= 17 dummy DOMs, <=5 buoyant spheres OFM functionality in foot container Possibly voltage conversion in foot container Properties; Top drift <= 120 m @ 0.3 m/s sea current Weight in air <= 1700 kg DOM interval <= 40 m Leader <= 120 m Height in sea <= 876 m Rope Ø = 4 mm, ρ = 970 kg/m 3, load <= 210 kg/rope VEOC Ø = 6.35 mm, ρ = 1168 kg/m 3 DOM Ø = 432 mm, ρ = 720 kg/m 3 Buoy Ø = 432 mm,ρ = 410 kg/m 3 Deadweight ≈ 946 kg in air (iron) Volume ≈ ½ x 20 foot ISO container Constrains; 2 dedicated fibres to shore 360 - 400 V=, 40 W from foot container

4 Possible sites InfrastructureLocation Shore distance (km) Depth (m) Number of output available Type of connector Voltage (V) Number of fibre per output Fibre type Antares 42 o 48 N 6 o 10 E 4225001? ODI rolling seal 500VAC2ITU-G654 Capo Passero 36 o 17,06’N 15 o 58,9’E 9534501ODI NRH375 DC2 | 3ITU-G655 Infrastructure Acoustic positioning ADCPCTDC-starCTLaser beacon AntaresOperational22222 Capo Passero To be deployed 12101 Instrumentation (partly on Nemo tower / Antares instrumentation line) Geographic and installed properties

5 Connection diagram Shore station Base container DOM #1 DOM #2 DOM #3 ? P SC O MEOC IL ? VEOC ? Depends on site; P AC/DC conversion for Antares IL Antares: spare part wm-connectors both sides IL Capo Passero: to order wm-connector JB side or both sides data sc + cw GPS JB P available covered open Anchor DAQ PPM-DU ? depends on site

6 Shore station 50/50 APD VOA on/off λ5 C2 λ1 C2 λ1-3 Concept for PPM-DU with Overlay DWDM REAM 2xCu DOM PIN λ1 λ5 C-Band 1528-1568 nm MOD + Drivers LiNbO3 45 / 95 km Data @1.25 Gbps CW + SC / Tim Base container optics Junction Box REAM 2xCu DOM PIN λ2 λ5 REAM 2xCu DOM PIN λ3 λ5 Control box λ4 Electronics DAQ

7 Concept of the power flow Client voltages from control to control to optics 200-500Vac IL VEOC <= 40 W Base container power Antares Storey 360-400Vdc 12Vdc Client voltages DOM BOB Fuse 0.5A-10ms,OCP 3Apeak Storey 360-400Vdc 12Vdc Client voltages DOM Storey 360-400Vdc 12Vdc Client voltages DOM 360-400Vdc BOB JB

8 Contributions Itemavailablecoveredopen GPSINFN/CPPM Shore DAQ / softwareDemokratos? Shore electronics??? Shore opticsNikhef Shore powerCPPM/INFN MEOCCPPM/INFN JBINFN/CPPM ILCPPMINFN Foot container mechanicsINFN/CPPM power conversionCPPM local powerCPPM power switchINFN /CPPM controlINFN/CPPM opticsNikhef AnchorNIOZ/INFN/CPPM? DU infraNIOZ, Nikhef Buoy spheresNIOZ Dummy spheresNIOZ RopeNikhef, NIOZ VEOCNikhef DOM 1,2Nikhef DOM 3 ECAP Power boardDemokratos (TBD) CLBIFIC (TBD) Software/firmware??? OctopusNikhef HV-baseNikhef PMTNikhef,CPPM,ECAP,INFN VEOC DC/DCNikhef DeploymentNIOZ ROV ConnectionCPPM/INFN Shore Network infra DU-string Sea operations

9 Site dependencies AntaresCapo Passero 2500 mdepth3450 m 45 kmdistance95 km No (now) Available JB output Yes IL (spare)physical DU connectionIL (15 wks) AC/DC (? wks)power connectionDC Base containercommunicationBase container DAQshoreDAQ Sea operationsinstallationSea operations Apache / COMEXconnectionCougar / Certamen

10 Sea operations

11 Realisation issues Major planning restrictions Complete contribution list DU complete @ NIOZ Texel20-2-2013 Crew @ Malaga Spain1-3-2013 Deployment tests1-3-2013 – 15-3-2013 PPM-DU deployment1-3-2013 – 15-3-2013 Connection 4M2013 Delivering time IL15 wks Delivering time optics13 wks manpower Mandatory Project coordinator PPM-DU Operation coordinator / site

12 Summary -Two possible sites are identified: Antares Capo Passero -Arguments are given for a choice: Time schedule Infrastructure available/offered at the sites Technical layout Site choice is URGENT


Download ppt "Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine 5-9-2012 Bologna."