Presentation is loading. Please wait.

Presentation is loading. Please wait.

Inter State Exchange Programme (ISEP) Govt. of Rajasthan, Jaipur

Similar presentations


Presentation on theme: "Inter State Exchange Programme (ISEP) Govt. of Rajasthan, Jaipur"— Presentation transcript:

1 Inter State Exchange Programme (ISEP) Govt. of Rajasthan, Jaipur
Rajasthan Experience Rohit Kumar Commissioner EGS RD & PR Department, Govt. of Rajasthan, Jaipur

2 ISEP 16 – 19 May 2016 - Participation
MoRD officials led by Smt. Aparajita Sarangi, Joint Secretary (Mahatma Gandhi NREGA) Host : Government of Rajasthan- Officers from the States of : Uttar Pradesh Madhya Pradesh Jharkhand Chhattisgarh Odisha Maharashtra

3 Progress 2015-16 Vis-a vis All india
S.N. Parameters All India Rajasthan 1 Person days Generation Crore (% Against Appvd. LB) (98%) 23.41 (111%) 2 % PD Generation by Women 55 69 3 Av. Days of Employment per HH 48.86 55.47 4 Timely Payment (%) 35 47 88% within a month 5 % Exp. On Ag. & allied works 60.4 60.52 6 Exp. On Material (%) 26 18 (33) 7 % HH Completed 100 Days 10 11 (4.69 Lakh) 8 AADHAR Seeding (%) 62 70 (89% on Bhamashah) 80% - current yr. active workers

4 State Initiatives To capture the real/hidden demand
Worksite supervision, GTNPS and Women Mate Individual Beneficiary works Focus on creation of Durable assets CFT Issues Mukhya mantri Jal Swavlamban Abhiyan (MJSA) - Convergence

5 Demand Capture - Strategy adopted
To capture the real/hidden demand Proactive demand registration/dated receipts Rozgaar Diwas – every Thursday at GP Bhawan (Thursday weekly off), fixing (x,y,z,t) of the Gram Sewak/GRS - must Multiple agencies for demand capture – Sarpanch Ward Panch ANM, ICDS worker, Mate FPS dealers, Aanganbari Kendra etc. Application form (Form 6) readily available – GP Bhawan, Mate, worksite, Sarpanch/Ward Panch, FPS, SHC/PHC, Agri Supervisor, AWC Effective Toll Free Helpline – capture demand/dated reciept Sufficient no. of works to be in a ready state FS - villagewise at least 2 works should always be available Emphasis on Individual Beneficiary works

6 Demand Capture – Strategy adopted (cont…)
Emphasis on timely payment – 47% - 88% payment within a month MR trekking 15% in 13-14 Monitoring Daily monitoring of Labour Deployment by Commissioner/DPC/ADPC Monthly VC with DPC/ADPC Effective Mate system FULCRUM – Mobilization of workers, demand registration/dated receipts, worksite management,, NAPI on a daily basis, monitoring GTNPS "LINK" – GP officials and workers GTNPS (Groupwise Task NAPI Payment System), women Mate

7 CTNPS – Combined Task Napi Payment System
Inefficient work culture Clear cut demarcation – SWF/NSWF Category No of Laborer in a worksite Total Task Given per day (Cu. ft.) = (Col 2 X 50 Cu Ft) Total Task Done per day (Cu. Ft.) Av. Wage (should have been) per man day as per their share of task = (Col 4 /Col 3) X 173 Av. wage actually paid per man day (based on CTNPS) =(3800/5000) X100 Diff. of Av. wage = (Col 6 – Col 5) 1 2 3 4 5 6 7 Sincere work force 70 3500 Rs 173 Rs 132 - Rs 41 Non sincere work force 30 1500 300 Rs 35 + Rs 97 Total 100 5000 3800

8 GTNPS - Group Task Napi Payment System
Only permanent solution: CTNPS  GTNPS Who will do this ? THE Women MATE Worksite Supervisor At least 50% women – more sincere, methodical & honest 5th pass – women & 8th pass – men Concept of Daily Task - SoR – simplified form – lead/lift, soft /hard soil Concept of "Chowkdi" Concept of Napi – simplified - 1" = Rs. 14 Daily Recording of Groupwise Napi on MR

9 Concept of "CHOUKDI" e.g Labour ~ 50 cubic ft : 5 Labour  250 Cubic ft Knowledge of Chowkdi : 25’x10’x1’ Full Task 173/-

10

11

12 Works of Individual Beneficiary
Linkage with RGAVP – 2.51 Lakh completed works (Land development, Tanka/Farm pond/wells, Diggi, Horticulture plantation, Med bandhi etc.) Identification of 1 lakh SHG Members for works under this category 25000 Farm Ponds/Tanka Special Gram Sabha/IPPE - II Main Focus on field bunding, water conservation, horticulture plantation, cattle shed , vermi/NADEP compost, khaalaa

13

14 Focus on - Durable Assets
Renovation of traditional water bodies & new WHS – including Farm Ponds/Tanka Food Godown – 2000 Anganwadi – 2000 Play grounds – 2000 Cattle shed Roadside/Pasture land plantation (Panch Phal) Well/Group well

15 CFT Project –important deliverables
PD generation against approved LB % SC/ST HH provided employment Av. Days of employment to SC/ST Timely Payment % Exp. on Individual Beneficiary works Zero attendance MRs Av. wage rate paid % women Mate No. of GPs with no on going works

16 Some Important Issues Procurement:
Minus the unskilled labour – should be done as a “composite work” and not as item wise procurement/Master Circular  Improvement in quality & work completion Individual Beneficiary works–sanction for SF/MF–Saturation Mode RUP construction to be allowed  ensure real connectivity Internal road width – should be 3.75 m instead of 3 m/IRC

17 Some Important Issues MIS related issues:
Multiple selection of sub works, like Farm pond/Tanka/Wells/ Plantation (package) and Reports generation AADHAR /Bhamashah Seeding – Linkage/consent Option of Group Well/Kitchen shed Material bill vouchers of – to be booked in only

18 Mukhayamantri Jal Swavlamban Abhiyan (MJSA)
To create 7 lakh water conservation structures in 4 years. 1 lakh structures to be completed by 30th June 2016 Special plantation drive in July-August, around these structures Scientific ridge to valley treatment - conservation structures MPT’s/CCT’S, Farm Ponds/Tankas, Field Bunds/Check Dams Mass movement, people offering ‘Shramdaan’. Crowd Sourcing touched Rs. 50 crore/JCBs, Machines, POL Convergence of line department’s activities and funds- Mahatma Gandhi NREGA ,IWMP and State Funds Technological interventions - Geo-tagging, GIS maps,mobile application Villages taken – 3500 this year Mahatma Gandhi NREGA – Rs. 400 crore out of Rs crore; works

19

20 Interlocking tile road

21

22 Women Mate

23 Tanka Construction

24 Tanka Construction

25 Farm pond

26 Diggi construction

27 Panch Phal (Karonda)

28 Khala Construction

29 BFT Training

30 Women Mate

31 Anicut construction

32 Anicut construction

33 Inter locking tiles road

34 Anicut construction

35 Well Construction

36 Development of Crematoria

37 Cattle shed

38 THANK YOU

39 Target – Focus are Targets for specific works to districts –
Farm Pond/Tanka Aanganwadi Centers Vermi/NADEP Compost Road side Plantation Km Food grain Godowns Play Fields Horticulture Plantation Beneficiary Cattle shed Lakh Development of Cremation Grounds 2000

40 Target works to be taken up in FY 2016-17
S.N. District Farm Pond /Tanka Nos. AWC Buildings Nos. (a) Vermi Compost Tanks and (b) Nadep Compost Nos. Roadside Plantation (Length In Km) Food grain Storage Structures Nos. Development of Play Fields Nos. Horticulture Plantation No. of Beneficieries Cattle Shed Nos. Development of Crematoria Nos. 1 Ajmer 200 25 500 40 50 55 10 2850 61 2 Alwar 147 100 70 150 5175 95 3 Banswara 120 1000 110 105 3497 75 4 Baran 1873 37 5 192 72 451 2234 47 Barmer 58338 632 14084 174 119 225 136 4942 115 6 Bharatpur 45 122 30 3780 68 7 Bhilwara 1398 284 400 3881 81 8 Bikaner 4000 2000 2931 9 Bundi 79 65-63 116 197 1850 34 Chittorgarh 106 550 22 11 Churu 1270 80 2567 12 Dausa 16 2365 41 13 Dholpur 196 155 125 1728 14 Dungarpur 90 15 2941 Hanumangarh 18 700 28 96 2537 jaipur 5377 102 17 Jaisalmer 60 1415 20

41 Target works to be taken up in FY 2016-17
S.N.` District Farm Pond /Tanka Nos. AWC Buildings Nos. (a) Vermi Compost Tanks and (b) Nadep Compost Nos. Roadside Plantation (Length In Km) Food grain Storage Structures Nos. Development of Play Fields Nos. Horticulture Plantation No. of Beneficieries Cattle Shed Nos. Development of Crematoria Nos. 18 JALORE 500 274 1000 10 30 50 2769 54 19 JHALAWAR 20 700 100 300 2547 JHUNJHUNU 1505 60 903 80 3042 21 JODHPUR 48 4600 160 4710 108 22 KARAULI 200 2294 41 23 KOTA 62 1245 155 775 1567 34 24 NAGAUR 2000 170 4720 95 25 PALI 40 3244 68 26 PRATAPGARH 828 33 2475 210.6 165 330 1668 27 RAJSAMAND 2092 47 28 S. MADHOPUR 63 2021 29 SIKAR 430 15 5 99 129 3467 61 SIROHI 75 1637 31 S. GANGANAGAR 800 12 90 9 3396 32 TONK 150 2325 UDAIPUR 2700 5498 115 Total 77549 3044 49855 1799.6 3265 2838 7701 100000


Download ppt "Inter State Exchange Programme (ISEP) Govt. of Rajasthan, Jaipur"

Similar presentations


Ads by Google