Presentation is loading. Please wait.

Presentation is loading. Please wait.

COORDINATION MEETING ON ANTARCTIC METEOROLOGY AND RELATED IPY ACTIVITIES ST. PETERSBURG, 21 – 23 NOVIEMBRE 2005 REPUBLICA ARGENTINA.

Similar presentations


Presentation on theme: "COORDINATION MEETING ON ANTARCTIC METEOROLOGY AND RELATED IPY ACTIVITIES ST. PETERSBURG, 21 – 23 NOVIEMBRE 2005 REPUBLICA ARGENTINA."— Presentation transcript:

1 COORDINATION MEETING ON ANTARCTIC METEOROLOGY AND RELATED IPY ACTIVITIES ST. PETERSBURG, 21 – 23 NOVIEMBRE 2005 REPUBLICA ARGENTINA

2 OBSERVATION SYSTEM DATA PROCESSING SYSTEM REVIEW OF THE MONITORING RESULTS DATA COLLECTION & DISTRIBUTION IPY, PLANNING & COORDINATION ACTIVITIES

3 ORCADAS AMC - ADCC MARAMBIO ESPERANZA BELGRANO II SAN MARTIN JUBANY ARGENTINE STATIONS Updated, Nov 20th 2005

4 OBSERVATIONAL DATA OBSERVING SYSTEM ANTARCTICBASICSYNOPTIC / CLIMATOLOGICAL NETWORK X GUAN XBELGRANO II 89034 XSAN MARTIN 89066 XXXMARAMBIO 89055 XJUBANY 89053 XXORCADAS 88968 XXESPERANZA 88963 C TEMPCLIMATGSNSTATION Updated, Nov 20th 2005 1953 1904 1979 1985 1969 1951

5 ALTITUDE STATION : 89055 OZONOSONDINGS (#) JUN to DECJAN to MAY Frequency2 weekly2 monthly Estimated daysWednesdays and Saturdays 1st and 3rd wednesday of the month (#) under agreement with the Finnish Meteorological Institute

6 Presence monthly average, in operational time, of the Argentina Antarctic Stations, recieved at the RSMC Buenos Aires

7

8 QUALITY CONTROL AT THE ERMC BUE:

9 BUE MBI

10 Delay control of synop reports at RTH Buenos Aires (1 to 5 January 2005)

11 Delay control of synop reports at RTH Buenos Aires (1 to 5 January 2005)

12 CONDICIONES METEOROLOGICAS EN BASE MARAMBIO 14 de noviembre de 2002, 12.00 HOA ESTADO DEL TIEMPO Parcial nublado VISIBILIDAD10 km TEMPERATURA-7.0 ºC SENSACION TERMICA-15.3 ºC HUMEDAD93 % VIENTOEste 14 km/h PRESION NIVEL LOCALIDAD 972,2 hPa ESTACIONHORA (HOA)ESTADO DEL TIEMPOVISIBILIDAD TEMP [ºC] SENSACION TERMICA [ºC] HUME DAD [%] VIENTO [km/h] PRESION [hPa] Base Esperanza 12:00Cubierto10 km-3.7-6.878 Sudeste 9 995,2 Base Jubany12:00 Cubierto con precipitación a la vista 3.0 km-2.2-3.393 Sudoeste 7 995,8 Base Marambio12:00Parcial nublado10 km-7.0-15.393Este 14972,2 Base Orcadas12:00Parcialmente nublado25 km1.8-2.384Este 11985,8 Base San Martín 12:00Parcialmente nublado20 km1.5-7.081Sur 18993,3 ( www.meteofa.mil.ar)

13 Coastal Areas: Mar de la Flota Gerlache Strait Margarita Bay and Erebus and Terror Gulf areas Oceanic Areas Southern Drake Strait (South of 60ºS) Northern Bellinngshausen Sea Northern Weddell Sea Southern Wedell Sea

14 Twice a day, 18 hours validity. In English and Spanish Contains: Gale Warning Weather Synopsis Forecast for coastal areas Forecast for oceanic areas.

15 WWAA02 SAWB 151100 1:31:06:01:00 SEGURITE WEATHER BULLETIN FOR SHIPING ANTARTIC OCEAN ELABORATED BY MARAMBIO ANTARTIC METEOROLOGICAL CENTER - ARGENTINA AIR FORCE - PART ONE: GALE WARNING PART TWO: SINOPTIC SITUATION AT 0900 UTC 02/11/15 SIGFENOM: LOW 978 HPA 63S 46W. AND 995 HPA 53S 69W. PART THREE: FORCAST ISSUED AT 151500 UTC 02/11/15 VALID UNTIL 160300 UTC 02/11/16. COASTAL ZONE. MAR DE LA FLOTA COAST/GERLACHE STRAIT: MODERATE BREEZE FROM NORTHEAST. OVERCAST/PARTLY CLUODY PRECIPITATION POOR VISIBILITY. MARGARITA BAY ZONE: FRESH BREEZE FROM SOUTHEAST.PARTLY CLOUDY.MODERATE VISIBILITY. EREBUS AND TERROR GOLF ZONE: GENTLE BREEZE FROM ORTHEAST. OVERCAST MIST MODERAE VISIBILITY. OCEANIC AREAS SOUTH OF DRAKE STRAIT: FRESH BREEZE FROM NORTHWEST.OVERCAST MODERATE VISIBILITY. NORTH OF BELLINGSHAUSEN SEA: GENTLE BREEZE FROM NORTHEAST CUBIERTO MODERATE VISIBILITY. SOUTH OF BELLINGSHAUSEN SEA: GENTLE BREEZE FROM NORTHWEST.PARTLY CLOUDY MODERATE VISIBILITY. NORTH OF WEDDELL SEA: FRESH BREEZE FROM NORTHWEST. OVERCAST/ PRECIPITATION INPROVING POOR.VISIBILITY. SOUTH OF WEDDELL SEA: GENTLE BREEZE FROM WEST.MIST POOR VISIBILITY.

16 SIGNIFITIVE HEIGHT OF WAVES (metres)

17 Area Forecast and Severe Weather warning, TWELVE (12) hours validity, for Southern Drake Strait, Bellingshausen Sea (N/S) and Wedell Sea (N/S), in English and Spanish. Weather Status/Report Runway reports PRONAREA MBI:

18 Twice a day, 18 hours validity. Contains: Weather Synopsis WIND/TEMP Weather Forecasts for Marambio, Jubany and Esperanza.

19 LINK CMA MBI – RTH BUE : VSAT Link point to pint at 64 Kbps. Alternative: AFTN via VSAT LINK CMA MBI – ETC SOUTHBURY (USA) : Via RTH SABM - MC SBCW, VIA GTS. LINK CMA MBI – Antarctic Stations: HF

20 Name of Station Call SignFrequences (KHz or MHz) Type of transmission Transmission time (UTC) Observations Centro Meteorológico Antártico Marambio (Período desde el 15 de octubre al 14 de abril) LUU – (SAWB) 4807.0 10870.0 J2B00.20 C. SYNOP 35) 00:00h Boletín MET p/ Nav. Marítima 36) 4807.0 10870.0 J2B03.20 C. SYNOP 35) 03:00h Boletín MET p/ Nav. Marítima 36) PRONAREA MBI 31) 4807.0 10870.0 J2B06.20 C. SYNOP 35) 06:00h PRONAREA MBI 31) 10870.0 16209.5 J2B09.20 C. SYNOP 35) 09:00h 10870.0 16209.5 J2B12.20 C. SYNOP 35) 12:00h Boletín MET p/ Nav. Marítima 37) 10870.0 20732.0 J2B15.20 C. SYNOP 35) 15:00h Boletín MET p/ Nav. Marítima 37) PRONAREA MBI 31) C. GLACIOLOGICA * 38) 4807.0 9951.5 J2B18.20 C. SYNOP 35) 18:00h PRONAREA MBI 31) 4807.0 9951.5 J2B21.20 C. SYNOP 35) 18:00h (*) Tuesdays and Thursdays only

21 AREAISSUING SERVICE CES FOR SCHEDULED BROADCASTS BROADCASTS SCHEDULE (UTC) 60ºS / COST 20ºw / 90ºw ARGENTINA CMA VCOM MBI SOUTHBURY FOR AOR (W) 02:3017:30

22 OBSERVING SYSTEM : Significative efforts will be made in order to keep the operatio- tional status of all the Argentine Antarctic Meteorological Stations. During 2006 it is expected to put in operation AMC MBI HRPT station (NMS – CONAE) The NMS offered logistical support to increase the upper air observations in MBI as a contribution to the IPY, in accordance to its possibilities.

23 DATA PROCESSING SYSTEM : A double quality control is performed (at the stations and at the ERMC Buenos Aires), a high presence of data is observed. The availability of data at the AMC MBI is optimized for forecasting purposses.

24 TELECOMMUNICATION SYSTEM : Alternate means of transmission between AMC MBI-RTH BUE are under review. Regular monitoring of the RTH Buenos Aires incoming data. All the observational data and products are introduced on the GTS and NMS web

25 THANK YOU VERY MUCH! QUESTIONS?QUESTIONS?


Download ppt "COORDINATION MEETING ON ANTARCTIC METEOROLOGY AND RELATED IPY ACTIVITIES ST. PETERSBURG, 21 – 23 NOVIEMBRE 2005 REPUBLICA ARGENTINA."

Similar presentations


Ads by Google