Presentation is loading. Please wait.

Presentation is loading. Please wait.

NEXPReS EVN-NREN Meeting 3 Richard Hughes-Jones DANTE Delivery of Advanced Network Technology to Europe NEXPReS EVN-NREN Meeting 3, 25 Jun 2013.

Similar presentations


Presentation on theme: "NEXPReS EVN-NREN Meeting 3 Richard Hughes-Jones DANTE Delivery of Advanced Network Technology to Europe NEXPReS EVN-NREN Meeting 3, 25 Jun 2013."— Presentation transcript:

1 NEXPReS EVN-NREN Meeting 3 Richard Hughes-Jones DANTE Delivery of Advanced Network Technology to Europe NEXPReS EVN-NREN Meeting 3, 25 Jun 2013

2 2 Connect | Communicate | Collaborate Welcome to the EVN-NREN Meeting Aims of this EVN-NREN meeting include: Dissemination of current achievements on NEXPReS Identification of future requirements and understanding of NREN and VLBI roadmaps Discussion on maintaining EVN-NREN communications in the future

3 3 Connect | Communicate | Collaborate Agenda Start timeminSubjectSpeaker 14:00:005Welcome & IntroductionRichard Hughes-Jones 14:05:005Update on BoD work of WP6 Paul Boven 14:10:005Update on storage & data movement WP8Tomi Salminen 14:15:0020Discussion of any connectivity issues Jimmy Cullen All VLBI users 14:35:0020 Discussion of VLBI forward look & requirements. What will be needed in 3 to 5 years time? All VLBI users 14:55:0040 NREN Status Forward look & Roadmaps 15:35:0010 Discussion on maintaining EVN-NREN communicationsRichard Hughes-Jones All 15:45:005AOB

4 NEXPReS WP6 - High Bandwidth on Demand Task 1: Integration of e-VLBI with Bandwidth-on-Demand (JIVE, SURFnet, NORDUnet, OSO, CSIRO) Task 2: On-demand access for large archives (ASTRON, SURFnet) Task 3: Testing and validation of on-demand circuits (UMAN, JIVE) Task 4: Multi Gbps on demand for e-VLBI (JIVE, SURFnet, NORDUnet, OSO) EVN-NREN 2013-06-25 Paul Boven (boven@jive.nl) - WP6 Activity Leaderboven@jive.nl Paul Boven

5 NEXPReS WP6 - High Bandwidth on Demand EVN-NREN 2013-06-25

6 NEXPReS NSI client PHP, MySQL, Soap, Linux Requester and Aggregator Released under GPL, download from NEXPReS WIKI Used for e-VLBI and LOFAR LTA Integrated testing of circuits (udpmon) NEXPReS WP6 - High Bandwidth on Demand EVN-NREN 2013-06-25

7 NEXPReS WP6 - High Bandwidth on Demand EVN-NREN 2013-06-25 LOFAR Long-term Archive Scheduled data transfers from Target, ongoing Automated NSI control of 10G circuit (SURFnet 7)

8 NEXPReS WP6 - High Bandwidth on Demand NSI controlled circuits: 10G from JIVE to SURFnet/Netherlight NSI 10G from Groningen (LOFAR) to Amsterdam 10G Torun via GÉANT Federated PoP (Hamburg) 4G Jodrell Bank via JANET, GÉANT AutoBahn 10G OSO via Sunet, NORDUnet OpenNSA (temporary) 1G ATNF (Parkes/Mopra/ATCA) via OpenNSA e-VLBI science observations using JBO and Torun (ATNF fringes next Thursday) EVN-NREN 2013-06-25

9 NEXPReS WP6 - High Bandwidth on Demand EVN-NREN 2013-06-25 Future activities (?) Implement NSI v2.0 in the NEXPReS client Topology, Pathfinding, A&A Integration with network (observatories & JIVE) Higher bandwidth observations (4 Gb/s) GÉANT GN3+ Open Call Proposal for Topic 3 (Novel uses of Dynamic Circuits) OSO, SURFnet, JIVE If accepted, starts October 2013 Research leading to these results has received funding from the European Union's Seventh Framework Programme (FP7/2007 ‑ 2013) under grant agreement n° RI-261525 NEXPReS. This material reflects only the author's views, and the European Union is not liable for any use that may be made of the information contained therein.

10 10 Connect | Communicate | Collaborate VLBI FORWARD LOOK & REQUIREMENTS.

11 RI-261525 Current and Future Requirements eVLBI is preferred to disk based observations (real time results, fault diagnosis at stations, ToO experiments, etc) Higher data rates allow increased sensitivity observations - new science Digitized data provided by:  Analogue back end: Mark 4/VLBA formatter - 1024 Mbps VSI-H - > 4096 Mbps  Digital back end: dBBC + FILA 10G, RDBE & others – 10 Gbps Third NEXPReS EVN-NREN meeting – Tuesday, 25th June 2013 Slide: 11 Time Jimmy Cullen

12 RI-261525 Current and Future Requirements Mark 5 recorders – standard for VLBI and Geodesy Current:  Mark 5A: data rates ~ 1024 Mbps to disk or network  Mark 5B: data rates ~ 2048 Mbps to disk, > to network  Mark 5C: data rates ~ 4096 Mbps to disk, > to network New (available as of 2013-06-21):  Mark 6: data rates ~ 16 Gbps continuous to disk or network (31 Gbps burst) Third NEXPReS EVN-NREN meeting – Tuesday, 25th June 2013 Slide: 12 Time

13 RI-261525 Current and Future Requirements Mark 5A/B hardware now obsolete (i.e. new units no longer available to purchase) Mark 5C/6 hardware current Mark 5* support until September 2015 Users urged to upgrade June 2012, 3 station (Efflesburg, Onsala, Yebes) eVLBI at 4 Gbps Future – more stations, more bandwidth Third NEXPReS EVN-NREN meeting – Tuesday, 25th June 2013 Slide: 13

14 14 Connect | Communicate | Collaborate GÉANT 100 GIGABIT ROLLOUT FORWARD LOOK

15 15 Connect | Communicate | Collaborate The GÉANT Procurement Transmission Architecture Optical Transmission: 500Gbit trunks with Infinera DTN-X complete end July 2013 DTN-X is a digital ROADM GMPLS allows multi-level mesh restoration

16 16 Connect | Communicate | Collaborate IP Transmission platform Switching platform Results in… improved service access & nice options to “converge” FibreLeased circuits Packet transport DWDM GR BETRIL EELVLT SK HRSIUK NL DE FR ES PTDKCZ AT ITHUCH RO BGPL IE LU MTCY “Fully featured”Off fibre netNREN POPs RU Leased circuits MKRSME “Converged” platform “Fully featured” “Better featured” ALL now “Better featured”

17 17 Connect | Communicate | Collaborate 100G trunks for L2 and L3 services KEY 100G lambda Nx10GE lambda Nx10GE lambda (detail TBD) Nx10G leased lambdas RO PT LTLVEEBG GRHU Fink ESLUBENLUKCZSKHRATSIPLDKRUDECHITFRIE Actually Infinera gives 500 Gbit

18 18 Connect | Communicate | Collaborate 18 New GÉANT footprint (complete)

19 19 Connect | Communicate | Collaborate In summary The GÉANT backbone upgrade is nearly complete offering: “More for all” – more bandwidth at our disposal – more flexibility – versatile & rapid service provisioning – more function – leading to more service offerings – more accessibility to GÉANT users Real Future Proofing … towards the Horizon (2020) The GÉANT MX approach to the 100G multi-domain challenge: BoD service available in every PoP NSI v2.0 availability – alpha July 2013 – beta in September 2013 OpenFlow on MXcould be a powerful API for configuring the L2 data plane

20 20 Connect | Communicate | Collaborate NREN STATUS FORWARD LOOK & ROADMAP

21 21 Connect | Communicate | Collaborate NREN Update AARnet DFN FCCN GARR JANET NORDUnet Funet SUnet PIONER RedIRIS SURFnet

22 Janet6 Topology

23 What we’re building - Points of Presence 7 Janet Core PoPs – Tele-xxx, Leeds, Scolocate 4 SSET Core PoPs – Bristol, Birmingham, Nottingham, Glasgow 8 SSET Transmission PoPs – Peterborough, Southport, Newcastle... 21 SSET ILA sites – everywhere 39 Regional Network Entry Points (RNEPs) – University locations * SSET = Scottish and Southern Electricity Telecoms JANET’s dark fibre provider

24 Janet6 Topology Straightforward

25 What we’re building - Lightpath Increase bandwidth between backbone nodes to 100GE Topology reflects what is currently required

26 Government e-Infrastructure initiative Phase 1  Met Office, Exeter  Norwich Research Park  Hinxton Campus, Cambridge  Francis Crick Institute, St Pancras Strategic Research Facilities

27 Final network commissioning Regional Network migrations University clearing Regional Network migration contingency Lightpath migration SuperJANET5 contract end SuperJANET5 decommissioning Project Update

28 E-VLBI update SURFnet Continued collaboration with JIVE and ASTRON Further development of NSI Interdomain authorisation Ongoing discussion with Dante about BoD peering with Geant

29 29 Connect | Communicate | Collaborate MAINTAINING EVN-NREN COMMUNICATIONS

30 30 Connect | Communicate | Collaborate EVN-NREN Communications in the Future New mailing list: evn-nren@geant.net Bi-lateral site – NREN remains most important. DANTE continue to act as a single point of contact EVN-NREN meetings Requirements for new multi-domain infrastructure EVN-NREN telecom meetings – as required Face to Face once a year Co-located with something like TNC Co-located with a VLBI technical meeting

31 31 Connect | Communicate | Collaborate evn-nren@geant.net Mailing list Richard.Hughes-Jones@dante.net lars@nordu.net 'David Salmon (David.Salmon@ja.net)' Esther Robles 'Joao Nuno Ferreira' Marco Marletta Massimo Carboni 'Peter Hinrich' Radek Krzywania michalb@man.poznan.pl 'Guido Aben' 'ckuun@csir.co.za' 'cjwright@csir.co.za' 'lstaphorst@csir.co.za' 'aloots@ska.ac.za' 'Bruce Wallace' Ralph Spencer (Ralph.Spencer@manchester.ac.uk) 'Neal Jackson' Paul Burgess (paul.burgess@manchester.ac.uk) Jimmy Cullen (jcullen@jb.man.ac.uk) 'Huib Jan van Langevelde' Arpad Szomoru Paul Boven (boven@jive.nl) 'Mark Kettenis' 'T. Charles Yun' 'Ari P Mujunen' ‘Tomi Salminen <tlsalmin@kurp.hut.fi 'John Conway' 'Simon Casey' 'Francisco Colomer' Tasso Tzioumis Shaun.Amy@csiro.au 'Chris.Phillips@csiro.au' 'ckuun@csir.co.za' 'cjwright@csir.co.za' 'lstaphorst@csir.co.za' 'aloots@ska.ac.za'

32 Some interesting applications …

33 33 Connect | Communicate | Collaborate www.geant.net www.twitter.com/GEANTnews | www.facebook.com/GEANTnetwork | www.youtube.com/GEANTtv Connect | Communicate | Collaborate Thank you!


Download ppt "NEXPReS EVN-NREN Meeting 3 Richard Hughes-Jones DANTE Delivery of Advanced Network Technology to Europe NEXPReS EVN-NREN Meeting 3, 25 Jun 2013."

Similar presentations


Ads by Google