Presentation is loading. Please wait.

Presentation is loading. Please wait.

GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa ESA L2P Operational Service Nigel Houghton ESA / ESRIN NRT and Archive L2P Processing.

Similar presentations


Presentation on theme: "GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa ESA L2P Operational Service Nigel Houghton ESA / ESRIN NRT and Archive L2P Processing."— Presentation transcript:

1 GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa ESA L2P Operational Service Nigel Houghton ESA / ESRIN NRT and Archive L2P Processing of (A)ATSR data

2 GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa Aim of Project To promote greater use of (A)ATSR data as a reference data set for seasonal forecasting and climate research, Provide NRT L2P to GMES Marine Core Services (MCS) MyOcean project. Provide smooth transition between Medspiration and L2P

3 GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa History Originally requested by the International GHRSST-PP Science Team at the 6th GHRSST-PP workshop in 2005. Announced at GHRSST Meeting in 2008 Developed by consortium managed by Space ConneXions consisting of Rutherford Appleton Laboratory, University of Leicester and Met. Office. First Operational version released December 2008 to establish operational service before the end of the DUE Medspiration. Successful transfer from DUE to Operational service.

4 GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa Implementation MDB generated for all ATSR Series MDB analsed to generated associated SSES ESA product ESA Quality Assurance applied. Documentation on earthnet website. NRT mode and Archive mode.

5 GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa NRT L2P Operational NRT Service based on AATSR NRT production. AATSR NRT L2 products transferred from NRT Stations to UK-MM-PAF for processing to NRT L2P L2P Products pushed to MyOcean and PO.DAAC

6 GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa Operational versions Version 1.1. December 2008. First version. Aligned with Medspiration Version 1.2. Bug fixes Version 1.3 Corrected reported inconsistencies with GDS1.7 and issues with Metadata. Addition to read AOD and SST Analysis. Version 1.4 Different ancillary data for archive processing. Version 1.5. May 2009. Fixed all known GDS issues + pixel co-ordinates. Note: Version 1.5 Lat/Long is referenced to the centre of the pixel, instead of the edge. Now different from Medspiration product.

7 GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa

8 Percentage of L2 products received generated to L2P May 2009: 100%

9 GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa Archive L2P Archive L2P based on archive-quality products. Products start/stop at ANX Includes all historical ATSR-1 and ATSR-2 data in L2P format Includes all historical AATSR data plus new data as generated at UK-MM-PAF (approx two weeks after acquisition). Archive L2P does not include AOD nor SST Analysis at this point.

10 GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa (A)ATSR Mission Archive Complete archive of L1, L2 (and soon) L2P product for all three missions with all products generated with a common algorithm. August 1991 to now. ESA copy held at UK-MM-PAF Identical version of L1, L2 archive at NEODC, RAL for use of UK users. Currently missing all data from ATSR-2 Regional Mission (June 2003 onwards). All products gzip compressed. L1, L2 approx 70 TBytes compressed. L1, L2 also available on request from ESA on LTO4

11 GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa Schedule for L2P Archive Processing (A)ATSR Archive processing expected to start June 2009 (verification underway) All data for all three missions expected 2009Q3 (slightly delayed compared to previous schedule announced at GHRSST8). Rapid reprocessing if necessary (All three ATSR missions in one month).

12 GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa Requesting Access Standard Cat1 proposal with EOPI website On-line access to ATSR data will be free of charge, since no reproduction cost would apply. Username/Password issued quickly.

13 GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa Eopi.esa.int

14 GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa Data Access (NRT and Archive) All data (L1, L2, L2P) for ATSR-1/ATSR-2 and AATSR available via FTP from UK-MM-PAF L2P data additionally pushed to “Super Users” : MyOcean/PO.DAAC NRT L2P in rolling archive of one year (how long required?) NRT Archive will be kept in full. Method of delivering Archive L2P still being defined (for historical archive). FTP push? L2P Archive estimated 2 TBytes compressed.

15 GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa MERCI Access to (A)ATSR L1 and L2 (full resolution) products via http. http://ats-merci- uk.eo.esa.int:8080/merci/welcome.dohttp://ats-merci- uk.eo.esa.int:8080/merci/welcome.do Product download Child product extraction Statistics (flags, bands) Subsetting (Spatial and by Band)

16 GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa MERCI

17 GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa L2P: Looking further ahead AOD and SST Analysis into archive product. Regular monitoring of historical and on- going SSES performance based on MDB updates. Annual SSES review. Inclusion of (A)RC project methodology into L2P (also L1 and L2).

18 GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa Summary New L2P product with SSES ESA product. NRT and archive processing Covers data for all ATSR-1, ATSR-2 and AATSR with same processing algorithm High quality dataset Further developments in the future.


Download ppt "GHRSST Science Team Meeting 10. 1 st – 5 th June, 2009, Santa Rosa ESA L2P Operational Service Nigel Houghton ESA / ESRIN NRT and Archive L2P Processing."

Similar presentations


Ads by Google