Presentation is loading. Please wait.

Presentation is loading. Please wait.

Buildability™ for Your Homes Your Logo Here. Problem: Framing mistakes hurt your bottom line. So do “red tags”, delays, waste, and roof, floor or wall.

Similar presentations


Presentation on theme: "Buildability™ for Your Homes Your Logo Here. Problem: Framing mistakes hurt your bottom line. So do “red tags”, delays, waste, and roof, floor or wall."— Presentation transcript:

1 Buildability™ for Your Homes Your Logo Here

2 Problem: Framing mistakes hurt your bottom line. So do “red tags”, delays, waste, and roof, floor or wall framing that doesn’t match the plans. They cost you: Increased Material Costs Unnecessary Labor Time Delays Jobsite Waste Costs

3 There is a solution: Buildability™

4 What is Buildability? Predictable Costs Faster Construction Structural Integrity Code Compliance Less Waste It’s what is built into well-designed structures:

5 What is Buildability? “Buildability means that you can actually build the home you just sold.” And when done it’s right:

6 SAPPHIRE™ Technology + Early Collaboration + Pre-Fabricated Components Buildability: How Do We Achieve It?

7 SAPPHIRE™ Technology We use MiTek SAPPHIRE™ Software True 3D Structural BIM (Building Information Model) Each element is modeled, including connections Our designers accounts for all design loads and framing We eliminate interferences and design for efficient solutions. If it works in SAPPHIRE, it works on site! We can design and produce trusses, walls, and floor systems with precision and efficiency – and make structural options easier to select.

8 Collaboration Using SAPPHIRE™ Viewer: FREE 3-D Software for the builder and trades. Shows your entire structure in full 3-D on your desktop, iPad, or Windows tablet. Allows efficient review, approval, decision- making, on-site clarity and verification. EARLY collaboration (before the home contract) maximizes builder benefits.

9 Pre-Fabricated Components: Benefits SBCA study (2100 Sq. ft. side-by-side framing) found: The use of trusses and wall panels resulted in – 250 less man-hours onsite, – 13 cubic yards less scrap – For a total savings of $3,356 vs. Stick Framing That’s $3,356 straight to the bottom line. -SBCA Framing the American Dream Study

10 Questions?

11 Let’s Get Started NEXT STEPS: Select plan for a home design that is in-progress We’ll create the SAPPHIRE Model and review options with you. We’ll work together with you to lock in the best framing package options, along with your costs. During estimating and construction we’ll review the framing details with your framer to ensure clarity and correct installation the first time.

12 Thank You! We’re ready when you are. Your Logo Here


Download ppt "Buildability™ for Your Homes Your Logo Here. Problem: Framing mistakes hurt your bottom line. So do “red tags”, delays, waste, and roof, floor or wall."

Similar presentations


Ads by Google