Download presentation
Presentation is loading. Please wait.
Published byMelanie Webb Modified over 8 years ago
1
Steve Oliver Global Environmental Modelling Systems Pty Ltd (GEMS)
2
Sino Iron Project 100 km south west of Karratha Production late 2012 Rights to three billion tonne resource Production to 70 million tonnes per year
7
System Schematic ADCPNEMOMODEM CONVERTER NEXT G MODEM BASE STATION Internet DATA CENTRE SERVER
8
System Schematic ADCPNEMOMODEM CONVERTER NEXT G MODEM BASE STATION Internet DATA CENTRE SERVER
9
Sub-surface Configuration Workhorse Sentinel 600kHz ADCP Workhorse NEMO (OEM) Benthos Modem (OEM) Six Month+ Battery Supply ADCPNEMO ACOUSTIC MODEM Waves Array Hourly waves 10 Minute Currents NMEA Strings
10
Sub-surface Instrument Pod
11
System Schematic ADCPNEMOMODEM CONVERTER NEXT G MODEM BASE STATION Internet DATA CENTRE SERVER
12
System Schematic ADCPNEMOMODEM CONVERTER NEXT G MODEM BASE STATION Internet DATA CENTRE SERVER
13
Buoy/Shore Station MODEM RS232/422 CONVERTER NEXT G MODEM VPN CLIENT Antenna Acoustic head DC/DC 12>30V Regulator Solar Panel(s) 12V Battery
14
Buoy/Shore Station MODEM RS232/422 CONVERTER NEXT G MODEM VPN CLIENT Antenna Acoustic head DC/DC 12>30V Regulator Solar Panel(s) Micro Controller 12V Battery
15
Buoy/Shore Station MODEM RS232/422 CONVERTER NEXT G MODEM VPN CLIENT Antenna Acoustic head DC/DC 12>30V Regulator Solar Panel(s) Micro Controller 12V Battery v v
16
System Schematic ADCPNEMOMODEM CONVERTER NEXT G MODEM BASE STATION Internet DATA CENTRE SERVER
17
Data Manager
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.