Download presentation
Presentation is loading. Please wait.
Published byJune Carpenter Modified over 8 years ago
1
Development of Information System using OOA for Abdulhadi Bohligah Establishment Prepared by: Group # 3 1.Mohammed Al Ashoor 2.Abdullah Bohligah
2
Introduction This project for Abdulhadi Bohligah Establishment Aims to provide Employee Management System
3
Establishment Background Name: Abdulhadi Bohligah establishment Established: in 1977. Owner: Abdulhadi Bohligah. Location: in Al-Hufuf, Al-Ahsa, Saudi Arabia. Business type: Trading and contracting. No. of branches : two branches. No. of workers: 24 workers.
4
How did we pick this business? This est. is owned by my father The est. is growing and it gets more difficult to manage the employees This System will be very helpful
5
Contact Person My brother: – Name: Hussain Abdulhadi Bohligah – Job: executive manager.
6
Organizational Chart:
7
Phase I: Project Planning Phase 1. Defining the Problem: –all the operation was done manually –Top Manager decides to automate the est. operations starting with Employee IS –Help to manage the operations related to the employees 2.Anticipated Business Benefits: –Reduce Errors caused by their current manual system. –Ease their processes and safe time. –Manage the employees' salary. 3- System Capabilities Keep track with the employees' records Manage the payroll system electronically Performance Evaluation for bonuses or deductions. Be able to handle the increase in the number of employees.
8
Planning Phase WBS:
9
Planning Phase Gantt Chart For the Whole Project :
10
Planning Phase PERT/CPM for the Planning Phase:
11
Planning Phase 4- Confirming Project Feasibility –Economic Feasibility: Developing the system will be relatively costly because the est. doesn’t have an existing system which means purchasing hardware will have the major weight. Other costs : Software and license Training the users Travel Utilities and tools But this won’t be very effective because the system will be relatively small
12
Planning Phase – Technological Feasibility: As in the Economic Feasibility, we need to purchase almost all hardware – Schedule Feasibility: The dead line will be after 6 months from starting the project, which is very suitable for this system – Resource Feasibility: Because of the distance between the est. and our group project, we will face a problem in meeting the users. So we need to be accurate in gathering the info.
13
Planning Phase 5- Staffing the project: The project will be organized between the members of the group project( Mohammed & Abdullah ). 6- Lunching the project: The scope is defined, feasibility, team members and detailed schedule has been developed. We can start with the analysis phase.
14
Phase II: Analysis Phase 1- Gathering information: We get the information needed in two meetings with Mr. Hussain Bohligah. The System should: –Allow the HR employees to enter a data of all employees and for any new employee. –Be able to search for an employee by entering his name or ID. –Allow HR employees to update employees information –Automatically produce a detailed report salary –Automatically produce a vacation message notification to HR The HR Employees: 1.Mr. Hussain Bohligah : the manager 2.Mr. Tariq : an HR employee.
15
Analysis Phase
16
2- Define System Requirements: From the event table: –Creating New Employee –Look up an employee –Update employee info –Produce salary report –vacation announcement 3- Prioritize Requirements:
17
Analysis Phase Models used in the Analysis Phase 1- Class Diagram:
18
Analysis Phase 2. Activity Diagrams: Look Up Employee Creating New Employee
19
Analysis Phase Updating Employee information
20
Analysis Phase Producing a Vacation Message Notification Producing a Detailed Salary Report
21
Analysis Phase 3- Descriptions for Activities:
22
Analysis Phase
24
4- SSD: Creating a New Employee
25
Analysis Phase Look Up an Employee
26
Analysis Phase Update Employee Information
27
Thank You for Listening Now, I’ll leave you with Mr. Al Ashoor
28
The Design Phase
29
Design Phase Design the application architecture
30
Design Phase Design the application architecture
32
Design Phase Design the user interface
33
Design Phase Design the user interface
34
Design Phase Design the user interface
35
Design Phase Design the user interface
36
Design Phase Design the user interface
37
Design Phase Design the user interface
38
Thank You
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.