Download presentation
Presentation is loading. Please wait.
Published byRosemary Blankenship Modified over 8 years ago
1
Portable Ergonomic Spine Solution Team #5 Kin Li Joelle Seto Robert Martinez Gabriel Stall-Paquet Wanli (Jerry) Zhu Karla DiBartolo Final Presentation
2
Overview Introduction of Team Road Map Objectives Market Research Manufacturing Final Design Testing Promotion of Product Conclusion
3
Organizational Hierarchy Project Manager Karla Manufacturing Engineer Joelle Project Engineer Kin Marketing Manager Wanli Supply Representative Karla Design Engineer Robert Product Engineer Gabriel
4
Project Development Product Planning Concept Development Testing and Refinement Production Ramp Up Product For Market System Level Design Detail Design
5
Objectives To design an innovative ergonomic back support product which provides a competitive edge over existing products To make a portable, inflatable, and flexible back support that will accommodate individuals who spend long hours seated To provide a reliable product that becomes a household necessity
6
Market Research - Statistics 80% of North Americans will suffer back pains at some point in their lives 15-20% of the population have significant symptoms each year From 30 to 40 % of all workplace absences in Canada are due to back pain
7
Market Research - Spine Research and consultation with physiotherapist… Bad seating posture DOES increase pressure on the intervertebral discs. Using lumbar support DOES reduce excessive pressure.
8
Effect of Lumbar Support
9
Market Research – Existing Products
10
Market Research - Survey Customer Need Percentage 1.Comfort26.19% 2. Portability/Size 17.83% 3. Low Maintenance 17.54% 4. Cost 16.33% 5.Versatility/Adjustability12.38% 6. Appearance 9.73%
11
Manufacturing - Material Selection Main Body Dual layer fabric (100% polyurethane, 100% polyester) Dual layer fabric (100% polyurethane, 100% polyester) Inserts Prototype - Rice and black beans Prototype - Rice and black beans Mass production – Barley Mass production – Barley Valves Air Sealant
12
Manufacturing - Procedure Prototype Pattern Layout Pattern Layout Sewing Sewing Valve Inclusion Valve Inclusion Insert Fabrication Insert Fabrication Belt Attachment Belt Attachment Air Sealing Air Sealing Mass Production Main Body - Hot Template Press (valve inclusion) Inserts - Same Procedure Belt Attachment Self-inflating Valve
13
Production Obstacles Valve Sourcing Insert Material Selection Material had to be light-weight yet comfortable Material had to be light-weight yet comfortable Main Body Material Selection Air-tight material difficult to find Air-tight material difficult to find Sealant required for seams Sealant required for seams
14
Final Design Air Compartment 1 Pocket Air Compartment 2
15
The Prototype
16
Testing and Verification Potential customers tested prototype for: Comfort Comfort Durability Durability Portability Portability Modifications made according to feedback Weight of inserts reduced Weight of inserts reduced Type of material for inserts altered Type of material for inserts altered Quality control assurance
17
Financial Model Based on selling price of $30.00 and 50,000 units produced
18
Product Promotion - Immediate Kiosks in shopping centers across Canada Displays and demonstrations in pharmacies and department stores TV commercial/infomercial Website
19
Product Promotion - Globalization Goal to attain 20% Canadian market share by Q1 2005 Evaluation of global market after 6 months following market release Branch sales potential to US market Global sales via internet
20
In Conclusion… Concurrent Engineering Process: Met deadlines Met deadlines Increased efficiency of design process Increased efficiency of design process Excellent communication amongst team members Excellent communication amongst team members Built on skills of team members to accomplish tasks Built on skills of team members to accomplish tasks SYNERGY!!! SYNERGY!!!
21
Thank –You! Questions or Comments?
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.