Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGC On-Line Monitoring 8.9.2008. Status for 1 beam Before LHC Startup on 10.9.08 TomBox: A single machine (pc-tgc-mon-rod-01) receives all TGC events.

Similar presentations


Presentation on theme: "TGC On-Line Monitoring 8.9.2008. Status for 1 beam Before LHC Startup on 10.9.08 TomBox: A single machine (pc-tgc-mon-rod-01) receives all TGC events."— Presentation transcript:

1 TGC On-Line Monitoring 8.9.2008

2 Status for 1 beam Before LHC Startup on 10.9.08 TomBox: A single machine (pc-tgc-mon-rod-01) receives all TGC events (via gigabit switch connected to 24 RODS). GNAM Segment: is implemented & stable (currently, single). SHIFTER Histograms: 2 types for each side & sector (strips or wires). “X” axis is the same for both. Each bin corresponds to a single detector in a running numbering: 0->156 (2)sides*(4)wheels*(2||3)layers*(18||22)units = 156 (see structure)see structure More detailed EXPERT Histograms OHP: See the SHIFTER Histograms See the SHIFTER Histograms xml configuration file for both standalone / combined runs. “X” axis requires a translation to the exact unit - need to add a graphical mask to each SHIFTER Histogram. DQMF: Not completely implemented – will certainly not be until 10.9

3 side A side C r φ Layer (strip/wire) sector: 1/12 of a wheel 12 Wheel 3 32 1 Barrel TGCInteractionpoint μ μ

4 Strips Wires

5 Plans for 900GeV collisions Make TGC DQMF operational… Define COOL flags for combined runs


Download ppt "TGC On-Line Monitoring 8.9.2008. Status for 1 beam Before LHC Startup on 10.9.08 TomBox: A single machine (pc-tgc-mon-rod-01) receives all TGC events."

Similar presentations


Ads by Google