Mechanical Components have been ordered and should arrive by Week 1 of winter quarter Outstanding electrical components dependent on varying mechanical parts Working on methods to attach and store electrical components (due Week 1 winter) Test plans have been created for each component, will be ready to complete upon arrival
3
*Minimum Life Until Failure: As part of the design and testing process teams should consider ways to prove an expected life as listed. Previous tests on the device or tests conducted on components in a similar application will be acceptable. Methods of superposition or extrapolation of high wear components may also be considered.
8
Electrical component selection will be finalized when verify mechanical component testing Outstanding purchased parts ◦ electrical components for PCB and battery ◦ Steel for attachment ◦ Need to verify electronic attachment Testing plan- need to verify power terrain, how to determine speed, full system testing
11
https://edge.rit.edu/edge/P13002/public/Pr oject%20Review https://edge.rit.edu/edge/P13002/public/Pr oject%20Review
12
Added individual owners to all risk items Risk items more specialized, before was a generalization Added specific tasks once finalized the system architecture with the locking mechanism Customer needs have been identified, should be met based on current design
13
Notes from Meetings ◦ General Meetings https://edge.rit.edu/edge/P13002/public/Meetings% 20by%20Date https://edge.rit.edu/edge/P13002/public/Meetings% 20by%20Date ◦ Feedback from Reviews https://edge.rit.edu/edge/P13002/public/Meeting%20Not es/2012-10-05%20Systems%20Design%20Review.pdf https://edge.rit.edu/edge/P13002/public/Meeting%20Not es/2012-11-01%20Detailed%20Design%20Review.pdf