Rutherford Appleton Laboratory OEM retrievals with IASI, AMSU and MHS: Remaining Tasks PM3, Telecon 12 November 2014 R.Siddans, D. Gerber (RAL),

Similar presentations


Presentation on theme: "Rutherford Appleton Laboratory OEM retrievals with IASI, AMSU and MHS: Remaining Tasks PM3, Telecon 12 November 2014 R.Siddans, D. Gerber (RAL),"— Presentation transcript:

1 Rutherford Appleton Laboratory OEM retrievals with IASI, AMSU and MHS: Remaining Tasks PM3, Telecon 12 November 2014 R.Siddans, D. Gerber (RAL),

2 Task 6: Retrievals with one or more missing AMSU channels Task: Results will be analysed with a view to drawing conclusions re performance of Metop-A vs Metop-B and for the MWIR retrievals with/without channel 7 channels 3,7 and 8. Status: CFIs now all acquired Metop A data for 23 March 2010 and 17 Oct 2013 New days processed: Bias/covariance for Metop A based on IR OEM complete All runs as per Task 5 settings (analysis/plotting not yet done) Still to run Met B 17 Oct with/without channels too for control

3 Metop A bias cf IR OEM – 17 Oct 2013 Metop-B all days Metop-A 17 Oct 2013

4 Metop A bias cf IR OEM – 23 March 2010 Metop-B all days Metop-A 10 March 2010

5 Estimation of noise Metop A: 23 March 2010 Metop A: 10 Oct 2013 Metop B: 10 Oct 2013

6 Remaing / future work Task 4/5/6: Still want to test impact of tightening assumed measurement error in MW windows – e.g. adopt sea noise model also over land Task 7: Final reporting & deliverables Results in hdf files, including statistics Should iterate off-line on precisely what required Further work beyond study Further improve emissivity fitting over desert Assess ozone performance Use relaxed prior constraint Compare to sondes + models (more data processing required) Link to parallel methane OEM study OEM CH4 scheme currently relies on analysis + RTTOV emissivity Use results from MWIR OEM and test impact (op L2 + improved)

7 Schedule

8 EventLocationDeliverablesPlanned Date Kick-Off Meeting Teleconferenec e 9 th December 2013 PM 1TeleconferenceReport on Tasks 1-2 1 st April 2014 PM 2EUMETSATReport on Tasks 3-4 24 th June 2014 PM 3TeleconferenceReport on Tasks 5-6 11 th November 2014 Final Presentation EUMETSATFinal Report, Datasets and Presentation 9 December 2014 Meetings / deliverables Current plan: Draft report by end of year. Final meeting in January Final report + deliverables early in new year (January?)


Download ppt "Rutherford Appleton Laboratory OEM retrievals with IASI, AMSU and MHS: Remaining Tasks PM3, Telecon 12 November 2014 R.Siddans, D. Gerber (RAL),"