Presentation is loading. Please wait.

Presentation is loading. Please wait.

Brussels, 22 September 2009 – 101st MVEG 1 WLTP – DHC Results of Validation Phase 1 tests (drivability of the new test cycle)

Similar presentations


Presentation on theme: "Brussels, 22 September 2009 – 101st MVEG 1 WLTP – DHC Results of Validation Phase 1 tests (drivability of the new test cycle)"— Presentation transcript:

1 Brussels, 22 September 2009 – 101st MVEG 1 WLTP – DHC Results of Validation Phase 1 tests (drivability of the new test cycle) Alessandro.Marotta@jrc.ec.europa.eu Monica.Tutuianu@jrc.ec.europa.eu Brussels, 11 October 2011 – DHC 10 meeting WLTP-DHC-10-12

2 Brussels, 22 September 2009 – 101st MVEG 2 Tested Vehicles Car 1Car 2Car 3Car 4 Vehicles categoryLCVPC PC/LCV ManufacturerFordVWFiatMitsubishi Model nameTransitPassat500L200 Fuel typeDiesel PetrolDiesel Engine displacement [cm³] 219819688752477 Max. rated power [kW/min -1 ] 103/2625105/420062.5/4125100/3000 Vehicle test mass [kg] 185519309301880 AftertreatmentDOCDOC + SCRTWCDOC Emission standardEuro 4Euro 6Euro 5AEuro 4 Transmission5MTAT5MT

3 Brussels, 22 September 2009 – 101st MVEG 3 Tests VehiclesGear Shift Strategy Vehicle Condition Test Series Ford Transit Fiat 500 Mitsubishi L200 JPCold1; Hot1, 2, 3; EU Cold1; Hot1, 2, 3; VW PassatATCold - day 1 Cold - day 21; Hot - day 1 Hot - day 21, 2; DAY 1DAY 2DAY 3DAY 4 Vehicle preparation and pre-test of WLTC with the 2 GS strategies. Preconditioning and soak at 22 ºC. NECD coldWLTC JP cold 1WLTC HS cold 1 Precond. WLTC JP hot 1WLTC JP hot 3WLTC HS hot 2 Precond. WLTC JP hot 2WLTC HS hot 1WLTC HS hot 3 Precond.

4 Brussels, 22 September 2009 – 101st MVEG 4 Test Results – Mandatory Information - 1

5 Brussels, 22 September 2009 – 101st MVEG 5 Test Results – Mandatory Information - 2

6 Brussels, 22 September 2009 – 101st MVEG 6 Test Results – Voluntary Information - 1

7 Brussels, 22 September 2009 – 101st MVEG 7 Test Results – Voluntary Information - 2

8 Brussels, 22 September 2009 – 101st MVEG 8 Vehicle Tolerance Calculations

9 Brussels, 22 September 2009 – 101st MVEG 9 Low Speed Phase

10 Brussels, 22 September 2009 – 101st MVEG 10 Medium Speed Phase

11 Brussels, 22 September 2009 – 101st MVEG 11 High Speed Phase

12 Brussels, 22 September 2009 – 101st MVEG 12 Extra-High Speed Phase

13 Brussels, 22 September 2009 – 101st MVEG 13

14 Brussels, 22 September 2009 – 101st MVEG 14


Download ppt "Brussels, 22 September 2009 – 101st MVEG 1 WLTP – DHC Results of Validation Phase 1 tests (drivability of the new test cycle)"

Similar presentations


Ads by Google