Presentation is loading. Please wait.

Presentation is loading. Please wait.

Inspire Status Library Group Meeting 2010/03/31. Meetings Mar 15-25 workshop at CERN –Preparation of beta release –Travis, Joe, Zaven –Many small working.

Similar presentations


Presentation on theme: "Inspire Status Library Group Meeting 2010/03/31. Meetings Mar 15-25 workshop at CERN –Preparation of beta release –Travis, Joe, Zaven –Many small working."— Presentation transcript:

1 Inspire Status Library Group Meeting 2010/03/31

2 Meetings Mar 15-25 workshop at CERN –Preparation of beta release –Travis, Joe, Zaven –Many small working meetings Apr 15/16 4 th Summit at Harvard –Meeting of information providers/publishers –Presentation of beta + future plans –common projects –together with ADS

3 Inspire beta http://inspirebeta.net ready to go daily updates from SPIRES still a few gaps/bugs but higher speed + additional features –Detailed record –Author page

4 Beta release Beta version (http://inspirebeta.net) ready to gohttp://inspirebeta.net url distributed first to a few friends Email to poll participants Announcement on SPIRES, CDS etc CERN Bulletin/Courier User feedback to feedback@inspirebeta.netfeedback@inspirebeta.net –Via RT

5 New functionalities Gradual release of “presents” Fulltext –Bulk upload from arXiv –Stepwise upload of CERN collections Fulltext search Accounts/personalization tagging Plot extraction Author identification / claim my paper etc

6 Towards Day 1 Work still to be done on Harvesting Cataloguing tools Workflow

7 Cataloguing tools All 4 labs will start to use bibedit CERN: LHC coll notes (update records) DESY: conf procs (new records) SLAC/Fermilab: only test records bibmatch Make it more fuzzy (Piotr) Test at CERN

8 bibedit Author special mode (Joe) Well advanced Special modes for references and keywords Still to be done

9 Workflow LHC Coll Notes Start with CMS Notes Merge SPIRES id’s into CDS –based on report nr (Piotr) Copy unmatched records to Inspire –Mapping of MARC fields CDS → Inspire Correct records on Inspire –Inspire standard (e.g. affil’s) –serious test of bibedit/bibmatch Merge back to CDS –to be worked out


Download ppt "Inspire Status Library Group Meeting 2010/03/31. Meetings Mar 15-25 workshop at CERN –Preparation of beta release –Travis, Joe, Zaven –Many small working."

Similar presentations


Ads by Google