2012-04-08 9:00 meetingEBH 11 Saturday 7.4.2012. 2012-04-08 9:00 meetingEBH 2  7:58 Fill 2483 (264 bunches) dumped by reference orbit set to zero in.

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
Friday 23 rd November - morning Coming out of loss maps over night Thu – Fri  in shadow of MKD problem in SPS (and CMS cryo recovery) 07:35 Start pre-cycle.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
17/09/2012LHC 8:30 meeting LHC Summary Week 37 Coordination: Jorg Wenninger & Jan Uythoven.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
LHC 8:30 meetingEBH 11 Thursday 24 November 2011.
Saturday 7ish – refill for RP set-up 9:15 Going for Roman pot alignment. Stefano is coming. 12:10 TOTEM: Alignment of horizontal RPs B2 finished, short.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
● Main goals for week 33: – Luminosity production; – First 150 ns bunch train attempts; – Roman Pots: check movement at 3.5 TeV, with 1b; – Off momentum.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Saturday ● 06:00: Physics fill from the night shift ● 15:00: End stable beam mode: – problems with incorporation of settings for the squeeze ● 16:40:
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
07:30 – 10:30 Asynchronous dump test with Beam 2. No issue found. FIDEL update. Now chromaticity decay corrected. 12:13 Beam dump due to problem in the.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
Crossing Schemes Considerations and Beam-Beam Work plan T. Pieloni, J. Barranco, X. Buffat, W. Herr.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
LHC Status Tue Morning 22-Aug
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Saturday 24 March 2012.
Wednesday 21 March 2012.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Summary of Week 11: 14 – 21 March
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
LHC commissioning Week 38
Mike Lamont, Jorg Wenninger
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Week 35 – Technical Stop and Restart
Monday Morning – recovery from cryo.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Saturday – Morning 7:36 beams dumped
Friday Morning 7:30 injection for fill 2908
Sunday
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Summary Thursday h21: Stable beams fill #1303.
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Thursday 22 September 2011.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
LHC Morning Meeting - G. Arduini
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Tuesday – Morning and Evening
Wednesday morning / afternoon
Saturday 26 November 2011.
Tuesday
Tuesday
Presentation transcript:

:00 meetingEBH 11 Saturday

:00 meetingEBH 2  7:58 Fill 2483 (264 bunches) dumped by reference orbit set to zero in V plane in the last step of the squeeze  new SIS interlock triggered as it should  Problem investigation  Fill 2484 to test the procedure for collisions in IP8 (3 bunches);  12:13 dumped by OFSU problem during squeeze  Fill 2485: Corrected the beam process for going to LHCb tilted crossing without having head-on collisions at LHCb.  tested successfully  Loss maps: B1 H + V, B2 H + V + longitudinal (-500 Hz)  19:17 – 20:47 stable beams fill 2486 (84 bunches)  Average intensity  start of ramp: 1.35x10 11 ppb  start of stable beams: 1.33x10 11 ppb  Initial luminosity: 2.9x10 32 cm -2 s -1  1.4 pb -1 delivered in 1:36 hour Saturday Morning and Afternoon

:00 meetingEBH 3  22:00 – 23:23 no beam from SPS: trip of main power supply (Depart 18 kV BA3) – only 36b missing for B2  0:48 – 5:09 Fill 2488 stable beams (264 bunches)  Average intensity  start of ramp: 1.34x10 11 ppb  start of stable beams: 1.31x10 11 ppb  Initial luminosity: 9.6x10 32 cm -2 s -1  10.5 pb -1 delivered  7:17 Fill 2489 stable beams (264 bunches) Saturday Night

:00 meetingEBH 4  Problem with transmission (or reception) of the references to the OFSU  Caught with the new SIS interlock  Found a way to diagnose the problem before launching the squeeze  repeat the sequencer task sending the orbit references till they are received all right  Origin of the problem to be investigated/solved next week Orbit feedback missing reference Missing orbit reference

:00 meetingEBH 5  Problem unrelated to the previous one  OFSU reconnected automatically and with the correct reference orbit, but it was disarmed.  rearmed it  it did take the correct reference, but with a scaling factor of zero  beam dumped by SIS  if it had not been rearmed, it would have continued with a frozen orbit reference and the SIS would not have dumped. It would have driven the orbit towards the collimators.  SIS interlock for OFSU down was reduced to 9 sec during the squeeze by Joerg, to catch this problem. Deployed and tested successfully. OFSU crashing during the Squeeze

:00 meetingEBH 6 Translating of the procedure into functions: 1.0 – 40 sec:  Reduce vertical separation -650 um-> -100 um 2.40 – 60 sec:  create vertical crossing angle 0 -> + 90 urad sec – 220 sec:  create horizontal separation 0 -> + 42 um to get the beams in the leveling plane (diagonal)  collapse horizontal crossing angle -> 0 urad  All positions calculated relative to the measured (30.3.) position of the head-on collisions.  All signs apply for beam 1 and have the opposite sign for beam 2.  All settings for positive LHCb polarity. LHCb tilted crossing

:00 meetingEBH 7  LHCb: beams stay separated during the physics process; automatic leveling worked fine  CMS: collapsing of the separation goes to far  updated settings  Some vacuum activity  4L8 and 6R7 Fill 2486

:00 meetingEBH 8  Atlas and CMS separated to 75% peak luminosity and stay with constant offset for 1 st hour  Atlas and CMS at 100% for 2 nd hour  3 rd hour separated to 75% again (2:59)  3:20 – 3:50 Sudden losses on several bunches  4:04 back at 100%  5:09 beams dumped Fill 2488 – 264 bunches

:00 meetingEBH 9  Atlas and CMS separated to 95% peak luminosity and stay with constant offset for 1 st hour  8:24 Atlas and CMS at 100% for 2 nd hour Fill 2489 – 264 bunches

:00 meetingEBH 10 Fill 2488 – 264 bunches, cont.

:00 meetingEBH 11  Tune change in the collisions beam process:  B1: previous increase was reverted back to a flat function  B2: increase by 2E-3 both planes  ADT: increased by a factor of two (from 0.02 to 0.04) on Friday  Trip of ADT (module H2B1)  At the moment: tune FB off during squeeze and collision  Problems:  Orbit feed-back reference  High losses on some bunches Others

:00 meetingEBH 12 Planning

:00 meetingEBH 13 Planning  Friday till Monday the morning meeting will be at 9:00  Tuesday 8:30 summary of the week  2-3 fills and 4-6 hours with 264b and 624b (cycle validation)  3 fills and 20 hours with 840b, 1092b, 1380b (intensity/lumi related problems)

:00 meetingEBH 14  2-3 fills and 4-6 hours with 48b, 84b, 264b and 624b (cycle validation)  3 fills and 20 hours with 840b, 1092b, 1380b (intensity/lumi related problems)  MP checklists after 84b, 624b, 840b, 1092 bunches  Regular MP checklists every two weeks when operating with 1380b Intensity ramp-up BunchesMax number of bunches injectedAlice 31Main-main 4812Main-satellite 8436Main-satellite 26436Main-satellite 62472Main-satellite Main-satellite Main-satellite Main-satellite