03-12-2008 Stephane Deghaye (AB/CO). 03-12-2008 2 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives.

Slides:



Advertisements
Similar presentations
Migration Considerations and Techniques to MPLS-TP based Networks and Services Nurit Sprecher / Nokia Siemens Networks Yaacov Weingarten / Nokia Siemens.
Advertisements

Department of Software and Computing Systems Physical Modeling of Data Warehouses using UML Sergio Luján-Mora Juan Trujillo DOLAP 2004.
FESA 3 Implementation Status Stephane Deghaye BE/CO On behalf of the FESA team and many users.
FESA Vs 2.0 AB/CO TC - 12 Feb July 2004 FECOMSA FESA2 2.0β.
NJIT From Inception to Elaboration Chapter 8 Applying UML and Patterns Craig Larman.
1 Samples The following slides are provided as samples and references for the Quarterly Reviews Additional slides will be added.
Copyright © 2007 Software Quality Research Laboratory DANSE Software Quality Assurance Tom Swain Software Quality Research Laboratory University of Tennessee.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
From Inception to Elaboration Chapter 8 Applying UML and Patterns -Craig Larman.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
© 2006, Cognizant Technology Solutions. All Rights Reserved. The information contained herein is subject to change without notice. Automation – How to.
Rapid Application Development Environment based on LabVIEW A. Raimondo (AB/CO) ATC/ABOC Days, January 2008.
1 IBM Software Group ® Mastering Object-Oriented Analysis and Design with UML 2.0 Module 1: Best Practices of Software Engineering.
Industrial Control Engineering PXI software support and accelerator integration.
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
Controls renovation WorkshopFE Software 1 Front-end software C.H.Sicard.
OFC 200 Microsoft Solution Accelerator for Intranets Scott Fynn Microsoft Consulting Services National Practices.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
WWWWhat timing services UUUUsage summary HHHHow to access the timing services ›I›I›I›Interface ›N›N›N›Non-functional requirements EEEExamples.
Chapter 7 Applying UML and Patterns Craig Larman
Stephane Deghaye (AB/CO) ATC/ABOC days.
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
Massachusetts Open Standards Policy Claudia Boldman Director of Policy and Architecture Information Technology Division, MA.
Fifth Lecture Hour 9:30 – 10:20 am, September 9, 2001 Framework for a Software Management Process – Life Cycle Phases (Part II, Chapter 5 of Royce’ book)
1 Chapter 3 1.Quality Management, 2.Software Cost Estimation 3.Process Improvement.
Application Development for Operations in the Coming Years Mike Lamont.
T HE BE/CO T ESTBED AND ITS USE FOR TIMING AND SOFTWARE VALIDATION 22 June BE-CO-HT Jean-Claude BAU.
SEAL Core Libraries and Services CLHEP Workshop 28 January 2003 P. Mato / CERN Shared Environment for Applications at LHC.
Software Engineering 1 Object-oriented Analysis and Design Applying UML and Patterns An Introduction to Object-oriented Analysis and Design and Iterative.
LHCbComputing Manpower requirements. Disclaimer m In the absence of a manpower planning officer, all FTE figures in the following slides are approximate.
Debriefing of controls re-commissioning for injectors after LS1 TC 09 October 2014.
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
CERN Control Standards Front-End Computer Layer Stéphane Deghaye BE/CO/FE
Authentication and Authorisation for Research and Collaboration Licia Florio AARC Workshop The AARC Project Brussels, 26 October.
CERN Raul Murillo Garcia BE-CO LS1 review – TE-EPC feedback BE-CO LS1 review TE-EPC feedback Raul Murillo Garcia on behalf of TE-EPC Daniel Calcoen Stephen.
FESA FRONT-END SOFTWARE ARCHITECTURE [FESA] Michel Arruat, Leandro Fernandez, Stephen Jackson, Frank Locci, Jean-Luc Nougaret, Maciej Peryt, Anastasiya.
Computer Science 340 Software Design & Testing Software Architecture.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
Rational Unified Process (RUP)
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
AT Control Forum First Meeting. Introduction  The AT Controls FORUM :  Is responsible for coordination of the overall strategy for controls activities.
Implementation Review1 Archive Ingest Redesign March 14, 2003.
POST-ACCOR renovations until LS2 – DEBRIEFING – Marine Pace, CO3 – 17 September 2015 Input from Chris, Marc, Stephen, Stephane, Wojtek.
EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January ARCON – RAMSES Bridge ATC/ABOC Days CERN – 21 to 23.
FESA S. Deghaye for the FESA team BE/CO. What happened since April? followed by “Our plans”
The ACCOR Project Status Report and Outlook for 2010 and beyond M.Vanden Eynden on behalf of the ACCOR Project Team 1M.Vanden Eynden (BE/CO) - IEFC Workshop,
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
CIT’s Web Single Sign-on Service SRM Report CUWebAuth Investigation Identity Management Team OIT/CIT Security April 16, 2007.
The OP Viewpoint on the Accelerator Complex Controls Renovation R. Steerenberg on behalf of the OP group Accelerator Complex Controls Renovation Workshop.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
Solutions for demanding business City, date 1 How can Open source technologies help to reduce the cost of development?
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
V4.
Accelerator Controls Renovation Project “ACCOR”
C/C++ Build tools & Testbed
Status and Plans for InCA
BA Continuum India Pvt Ltd
SAP Value Assurance plan and safeguard service package for SAP SuccessFactors HCM Suite Business Needs Need to follow leading practices and reduce risk.
Middleware – ls1 progress and planning BE-CO Tc, 30th september 2013
Software Myths Software is easy to change
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT– WEEK 4 Mumtaz Ali Rajput +92 – 301-
CIPSEC Future Activities
Seasonal Adjustment software Cristina Calizzani - Unit B2
Applications Development - Unit Testing
ESS.VIP Validation Item 5.1
Other System Requirements
Presentation transcript:

Stephane Deghaye (AB/CO)

The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives Scope Planning Work Packages Human Resources & Budget Summary Conclusions

Reduce effort duplication Homogenise the solutions deployed across the accelerator complex. Reduce the number of specific applications needed by providing high-level services. Reduce maintenance cost Suppress remaining 30+ X-Motif applications Renovate & redefine some (obscure) PS specific parts. Improve Controls system performance Tackle the performance, scalability and reliability problems experienced in the PS complex. Provide sound technical solutions to common problems badly handle due to architecture limitations. 3 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

All accelerators except LHC. SPS only for some components (Timing) Most of the CO high-level software components Generic/specific applications General services (control, acquisition and configuration) Data model and data access Timing (aiming at a complete integration) Some low-level components (to ensure vertical coherency) FESA framework services and class guidelines CMW services 4 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop First two phases completed  Architecture validated during several MDs Release 1.0 with minimal set of feature end of summer 09 (or end of the 09 run). Version 1.0 not to replace existing system (reduced functionality) Transition phase from mid 2010 (early estimation)

The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

FTEkCHFFTEkCHFFTEkCHFFTEkCHF Application Data model Timing FESA Com. & Infra TOTAL CO Documented in APT from 2008 to 2011 Doesn’t take into account the OP effort for: Domain expert (+/- 0.5 FTE) System configuration (+/- 0.5 FTE) Specific application development (+/- 6 FTEs available) 12 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop

The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Project well on the way (Architecture validated) Homogenise the high-level control system across the accelerators while keeping the specific ways of operating +/- 9 FTEs & 200 kCHF per year needed over 4 years

Thank you for your attention! 14 The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop