Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.

Slides:



Advertisements
Similar presentations
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Transmission Workstream – 6 th August 2009.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Enduring Offtake Arrangements including an Off-Peak Interruptible Service Peter Bolitho.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Transfer & Trades Special Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Transfers and Trades Transmission Workstream
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
Transfers and Trades Special Transmission Workstream
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
Transitional Exit Capacity Proposals -Update
Exit Capacity Release Methodology Statement
Transmission Planning Code – Draft Document
Exit Capacity User Commitment – Transmission Workstream update
Transmission Workgroup 4th October 2012
Transmission Workstream, 6 August
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
NTS Entry Charging Review Update
PARCA Security and Termination Amounts
Exit Capacity Substitution and Revision
7th July 2011 Transmission Workgroup - Elexon
Update on Exit Capacity Substitution and Revision
MOD National Grid NTS Initiated Flow Swaps
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Transmission Workstream – Partial Assignment
UNC Transmission Workstream 7th December 2006
Proposed Transitional Gas Exit Arrangements
Incremental Entry Capacity Release Methodology Statement
Presentation transcript:

Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009

2 Exit Capacity Release Methodology Statement. Requirement of the Gas Transporter Licence.  Special Condition C18: – The licensee shall, before 1 April, prepare and submit for approval by the Authority an NTS exit capacity release methodology statement setting out the methodology by which it will determine how it will release NTS exit capacity to gas shippers or DN operators. – National Grid is required to consult (28 days) on it proposals and provide a conclusions report to Ofgem. – Proposed statement is effective upon approval or, if not vetoed, after 2 months. This means that the ExCR:-  Informs on how and when National Grid will make capacity available for Users to obtain.  Links obligations under both the Licence and UNC and provides extra information where there is lack of detail.  Is particularly important in respect of the release of “obligated incremental” capacity as this often has lead-time and funding implications.

3 ExCR – Overview Part A covers “Transitional Exit Period”. Essentially the same as last years ExCR, but with some updating. Part B covers “Enduring Exit Period”. Concentrates on release of Enduring Annual NTS Exit (Flat) Capacity: Application Processes; annual, ad-hoc and ARCA. Reduction Process. User Commitment. General Introduction. Covers common sections applicable to both the Transitional and Enduring Exit Periods: e.g. contact for connection services, Licence obligations.

4 ExCR – Part A Part A covers “Transitional Exit Period”. Main changes are: ARCA terms (paragraph 21) To ensure consistency with the Enduring Exit Period the User Commitment will be based on four years of exit capacity charges. Forwards and Options (paragraph 28) Mitigating actions that may be explored (to enable release of capacity) include; forwards and options. Lead-times (paragraph 36) Section B applies to requests for capacity beyond investment lead times and for release in the Transitional Exit Period. So the section has limited scope; applying only to offers made before 1 st July 2009.

5 ExCR – Part B Part B covers “Enduring Exit Period”. Concentrates on release of Enduring NTS Exit (Flat) Capacity: Application Processes; Annual Application Window; Non-window (“Ad-hoc”); and ARCA applications. Reduction Process User Commitment also covers release of: Annual, Daily and Non-Obligated NTS Exit (Flat) Capacity: and NTS Exit (Flexibility) Capacity

6 Part B: Major Points a) Capacity Terminology (paragraphs 4 – 8).  Capacity terms used in the Licence and UNC are complex and not totally aligned. – We are currently pursuing possible changes to the Licence.  Until, any changes are implemented the ExCR refers to existing terminology. A revision may be required in Q  Diagrams provide a simplified explanation of the terms used. – But the Licence and UNC definitions prevail. b) Planning Process (paragraphs 10 – 16).  Long term User signals are the driver to investment.  Exit Capacity Substitution obligation is intended to reduce unnecessary investment. – NG expects the obligation to be deferred.

7 Part B: Major Points c) Principles (Chapter 1)  National Grid will release NTS Exit Capacity (including baseline capacity) having regard to: – Overriding obligations in the Gas Act and the Licence; e.g. where safe and efficient to do so. – Reasonable endeavours obligation in the Licence.  National Grid will release Enduring Annual NTS Exit (Flat) Capacity subject to a User Commitment. – Other forms of exit capacity will not require a User Commitment.

8 Part B: Allocation of Enduring Annual NTS Exit (Flat) Capacity (Chapter 2) d) Initialisation (paragraphs 26-30).  The ExCR refers to UNC Transition Document for initialisation rules.  For NTS Supply Points and NTS Connected System Exit Points – the maximum firm capacity utilised is the highest value of capacity booking for any Gas Day in Gas Year 2007/8: and – the maximum interruptible capacity utilised is the highest value of any interruptible gas allocation for any Gas Day in Gas Year 2007/8: – where either of the above two values would be in excess of the baseline the values will be pared back to the baseline - firstly interruptible and then firm on a pro rata basis – where an ARCA has been agreed with a capacity release date within the Transitional Exit Period, the value specified in the ARCA is used: and – For new NTS Exit Points that are not subject to an ARCA the registered allocation at 30th September 2012 is used.  For DN Offtakes – The 2008 OCS is used – New offtakes / ARCA treated same as Supply Points

9 Part B: Allocation of Enduring Annual NTS Exit (Flat) Capacity (Chapter 2) e) Increases  Three processes  Subject to User Commitment (paragraph 33) – But the User Commitment is not applicable to the initialisation quantity, unless increased (see paragraph 34).  Exit Point must be in Licence (paragraph 36),  National Grid will only be obliged to release incremental capacity, where there is a revenue driver in the Licence (paragraph 36) – May need six months notice before application / ARCA.  National Grid may enter into a PWA if an applicant is unable to provide long term signal (see paragraph 38). Annual WindowAd-hocARCA Release dates 1 st Oct Y+4, Y+5, Y+6 1 st Month, M+7 to 1 st Oct Y+4 As for ad-hoc (para 58) Application Dates1 st – 31 st July1 st Oct – 30 th JuneAny time

10 Part B: Allocation of Enduring Annual NTS Exit (Flat) Capacity (Chapter 2) f) Reductions.  Requests can only be made in the annual reduction window (1 st – 15 th July) or in response to an ad-hoc request from National Grid (paragraph 63).  Only permitted if there is no outstanding User Commitment and normally requires 14 months notice (paragraph 61).  Reduction before Oct Y+2 (i.e. less than 14 months) permitted at National Grid discretion where this would mitigate the need to release incremental capacity at the exit point (paragraph 65).  Reductions must be effective on 1 st of month and no earlier than Oct Y+1 (paragraph 64).  Applies to initial allocation as at 1 st Oct 2012 (paragraph 62).

11 Part B: Allocation of Enduring Annual NTS Exit (Flat) Capacity (Chapter 2) g) User Commitment (paragraphs 68-73).  This requires the User to be the registered User of (and hence to pay for) the allocated capacity for four years.  It applies to all tranches/increases in an application and applies to the total allocation (incremental plus existing).  The User Commitment Amount is only relevant if the allocated quantity is reduced early (generally this is not permitted); except  The User Commitment Amount is paid by a Reservation Party if all the reserved capacity is not allocated or is allocated late. h) User Commitment Amount (paragraphs 74-79)  Only determined if needed.  Is based on the indicative price in the offer / ARCA.  Calculated as Price * Quantity * Days (for which capacity not allocated) – Calculated from reduction effective date to 4 th anniversary of release for Users; – Calculated from release date to date of allocation for non-Users.

12 Part B: Allocation of Enduring Annual NTS Exit (Flat) Capacity (Chapter 2) i) Multiple ad-hoc applications & ad-hoc applications overlapping the annual window (paragraphs 50-52).  Applications for capacity made in the annual application window will be considered in aggregate, whereas  Ad-hoc and ARCA applications will be considered individually as they are subject to an offer / acceptance process.  Each ad-hoc / ARCA application can affect the offer to made in respect of other ad-hoc / ARCA applications or those in the annual window.  Hence in respect of interacting / overlapping applications process National Grid will seek to amend offer / acceptance timelines and they will be considered sequentially.  If agreement on timelines cannot be agreed then the offer will be based on all outstanding offers being accepted (i.e. assume worst case). This will also apply in respect of the annual application window process.

13 Part B: Allocation of Enduring Annual NTS Exit (Flat) Capacity (Chapter 2) j) Default Capacity Release Lead-Times.  Where incremental capacity is required to be released this will normally be from 1 st October Y+4.  Permits may shorten or extend the default time-line – Early contact needed

14 Part B: Allocation of Other Capacity Products (Chapters 3, 4, 5) k) Annual NTS Exit (Flat) Capacity.  Refers to UNC processes. l) Daily NTS Exit (Flat) Capacity.  Refers to UNC processes.  National Grid may release non-obligated capacity. This will be in accordance with incentives and obligations in the Licence.  “Off-peak” released in accordance with UNC. m) NTS Exit (Flexibility) Capacity.  Available to DNO Users only.  Shippers obtain flow flexibility via OPNs.  Incremental NTS Exit (Flexibility) Capacity will not be released if this would increase costs, adversely impact safety, trigger reinforcement, or exceed the baseline quantity.  National Grid may release non-obligated capacity. This will be in accordance with incentives and obligations in the Licence.

15 Timeline and Next Steps  Presentation on draft ExCR.  05 th February at Transmission Workstream.  With Ofgem.  Review/Amend draft ExCR to resolve issues raised as appropriate.  23 rd February commence consultation (28 days).  Submit proposed ExCR to Authority (by 31 st March 2009)  01 May 2009 ExCR effective.  Assumes approval within 1 month (Licence allows 2 months).