28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.

Slides:



Advertisements
Similar presentations
Update of RTML, Status of FNAL L-band and CLIC X-band BPM, Split SC Quadrupole Nikolay Solyak Fermilab (On behalf of RTML team) LCWS2010 / ILC 10, March.
Advertisements

Linear Collider AD&I Update N. Walker, E. Paterson, V Kuchler, T. Lackowski, J. A. Osbourne,J. Clarke, A. Wolski, S. Guiducci, N. Solyak,… Norbert Collomb30/08/2009.
Linear Collider Positron Source and Central Integration Update N. Walker, J. Clarke, E. Paterson, V Kuchler, J. A. Osbourne, T. Lackowski, A. Wolski, S.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
20/03/2011 Global Design Effort 1 ALCPG11 – Eugene Positron Source N. Collomb J. Clarke, D. Angal-Kalinin,
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
November 2005M. Woodley1 ILC Beam Delivery System layout with end-of-linac undulator.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
A.Seryi, Oct. 26, BDS comparison and positron source A.Seryi October 26, 2005 Discussion of BDS and positron source is given in [1] “Comment on.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
2 February 2005Ken Moffeit Spin Rotation scheme for two IRs Ken Moffeit SLAC.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Cost Impacts of two e- ML cycles at sqrt(s) < 250 GeV purpose: not to generate a new ILC estimate, but to facilitate SB2009 decisions Peter H. Garbincius,
Linear Collider Positron Source System Integration Jim Clarke, James Jones, Ian Bailey, Leo Jenner, James Rochford,Alexander Mikhailichenko, John A. Osbourne,
Simulation of Positron Production and Capturing. W. Gai, W. Liu, H. Wang and K. Kim Working with SLAC & DESY.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Discussion for Keep Alive Source /Auxiliary Positron Source KURIKI Masao Hiroshima U. /KEK 10/25/2011 ILC Technical Baseline Review, 2011, DESY 1.
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
ILC undulator based RDR e+ source: Yields and Polarizations for QWT capturing and different drive beam energy: Wei Gai, Wanming Liu Argonne National Lab.,
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Spin Control and Transportation O. Adeyemi*, M. Beckmann**, V. Kovalenko*, L. Malysheva*, G. Moortgat-Pick*, S. Riemann**, A. Schälicke**, A. Ushakov**
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Positron source beamline lattice Wanming Liu, ANL
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
ILC J.Osborne / A.Kosmicki / B.List – March 22 th 2012 CFS update for Europe.
Pictorial Damping Ring DC03 Layout (A. Wolski, M. Korostelev)
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
Review Layout of E- Linac Side of Central Region for Feb 10,2011 Meeting For E+ use Norbert’s data from CF&S meeting 12 th July, 2010, which has coordinates.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
Spin Tracking at the ILC Positron Source with PPS-Sim POSIPOL’11 V.Kovalenko POSIPOL’11 V. Kovalenko 1, G. Moortgat-Pick 1, S. Riemann 2, A. Ushakov 1.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Linear Collider Positron Source System Integration Jim Clarke, James Jones, Ian Bailey, Leo Jenner, James Rochford, Alexander Mikhailichenko, John A. Osbourne,
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Baseline Technical Review – Central Region Accelerator Systems
Integration Ideas for the Central Region Some old some new
Summary of WG2 :CFS for staging
THE STATUS OF POSITRON SOURSE DEVELOPMENT AT CORNELL-II
CLIC Civil Engineering Update
ILC CFS AD&I Daresbury Lab Summary
AD & I : BDS Lattice Design Changes
Cost Comparison of Undulator and e-Driven Systems
Linear Collider Positron Source Update
Linear Collider Positron Source and Central Integration Update
Central Region Working Group
ATF project meeting, Feb KEK, Junji Urakawa Contents :
ILC - Global Design Effort
CDR2 – Injection System Injection system overview (Seeman) (2 pages)
Presentation transcript:

28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation. by N.Collomb

28/03/2010Norbert Collomb2 ILC – Central Integration SB 2009 Layout Racetrack shape Damping Ring Tunnel Electron Beam Delivery System Tunnel Detector Hall Next slide BDS Diagnostic Dump and Positron 5GeV Booster section Slides 10 & 11 Positron Production Area; incl. AUX Source, Remote Handling Area, Capture area and chicane and Pre - Accelerator Slides Undulator Area Slides 17 & 18 Main LINAC (just out of view)

28/03/2010Norbert Collomb3 Detector Hall Service Tunnel ILC – Central Integration SB 2009 Layout Interaction Point (I.P.) Positron Main Dump Electron BDS Tunnel Damping Ring Injection and Extraction Straight ISO View Close up Capable of making out some systems Damping Ring Transfer Tunnel

28/03/2010Norbert Collomb4 ILC – Central Integration SB 2009 Layout Top View Close up Damping Ring Offset = 90m Interaction Point (I.P.) where X, Y and Z = 0 (zero) Positron Beam direction after collision Electron BDS Beam direction pre-collision Positron Beam Transfer direction Electron Beam RTML direction +ve Z +ve X +ve Y, Out of page Next slide - Positron Beam Direction - Electron Beam Direction Positron Injection & Electron Extraction Septum Position at X=90m and Z=-80.9m Damping Ring offset change since Albuquerque

28/03/2010Norbert Collomb5 ILC – Central Integration SB 2009 Layout 110 m between Dipoles R=30m, all Arcs, with Dipoles at ° spacing Positron Spin Rotation relocated. (400MeV version shown, 5GeV requires larger Solenoids and Dipole magnets, will NOT change tunnel arrangement) Positron Energy compression (best guess) Positron Elevator (Y = 0m to 1.3m) Electron Elevator (Y = 0m to 2m) - Positron Beam Direction - Electron Beam Direction Quite a bit of guess work going on at this moment. There are 9 Beam Dumps in the Transfer Tunnel? Damping Ring offset change since Albuquerque

28/03/2010Norbert Collomb6 ILC – Central Integration SB 2009 Layout - Positron Beam Direction - Electron Beam Direction Positron Damping Ring Electron Damping Ring Positron Main Dump Positron Transfer Line Electron BDS PTRAN Dump Electron RTML Left verification line in model in error. Corrected! Very busy tunnel Positron Spin Rotation Positron Energy compression Electron RTML elevator

28/03/2010Norbert Collomb7 ILC – Central Integration SB 2009 Layout Positron Main Dump. Tunnel arrangement has been investigated previously. Next slide.

28/03/2010Norbert Collomb8 ILC – Central Integration SB 2009 Layout Previous study investigated the shielding requirement and cavern design of main Beam Dumps (Electron Main Dump shown). Additional Electron Transfer line and e+ RTML to go in here

28/03/2010Norbert Collomb9 ILC – Central Integration SB 2009 Layout The study included the surface building requirements (Electron Main Dump shown).

28/03/2010Norbert Collomb10 ILC – Central Integration SB 2009 Layout Positron Transfer Line 5GeV Booster section Electron BDS Electron RTML Electron BDS Diagnostic Dump. 5GeV Booster upstream of it (radiation concerns). - Positron Beam Direction - Electron Beam Direction No changes here since Albuquerque

28/03/2010Norbert Collomb11 ILC – Central Integration SB 2009 Layout Positron Transfer Line 5GeV Booster section Electron BDS Electron RTML Electron BDS Diagnostic Dump - Positron Beam Direction - Electron Beam Direction No changes here since Albuquerque

28/03/2010Norbert Collomb12 ILC – Central Integration SB 2009 Layout Positron Capture Chicane Electron BDS Positron 400MeV Travelling Wave Accelerator Section - Positron Beam Direction - Electron Beam Direction Photon Dump Left verification line in model in error. Corrected! Spin Rotation moved into Damping Ring Transfer Tunnel since Albuquerque!!

28/03/2010Norbert Collomb13 Positron Capture Chicane Electron BDS Long Drift Electron Dump - Positron Beam Direction - Electron Beam Direction Photon Dump Left verification line in model in error. Corrected! Additional Electron Dump required due to AUX Source (somewhere here). ILC – Central Integration SB 2009 Layout Pre-Accelerator (Travelling Wave x3 modules) Change. The additional Electron Dump requirement identified in Albuquerque!!

28/03/2010Norbert Collomb14 ILC – Central Integration SB 2009 Layout Remote Handling Area Next slide AUX Source Diagnostic Dump may mean that the Source needs to be moved further upstream due to close proximity or RH area.

28/03/2010Norbert Collomb15 ILC – Central Integration SB 2009 Layout Electron BDS Long Drift Pre-Accelerator (Standing Wave x2 modules) in Remote Handling area (shielded). Pre-Accelerator (Travelling Wave x3 modules) Positron target Quarter Wave Transformer as Matching Device Photon Collimator also in shielded area Detail design for SW Accel. Modules now received. Remote Handling area currently under development. Shielding removed for clarity.

28/03/2010Norbert Collomb16 ILC – Central Integration SB 2009 Layout Electron BDS ‘Dogleg’ AUX Source Diagnostic Dump may mean that the Source needs to be moved further upstream due to close proximity or RH area. - Positron Beam Direction - Electron Beam Direction - Photon Beam Direction Additional Electron Dump required due to AUX Source (somewhere here). AUX Source utilising Photon Beam pipe Photon Beam pipe

28/03/2010Norbert Collomb17 ‘Big’ change since Albuquerque. 3 additional Undulator modules + 1 Quadrupole magnet due to ‘Low Energy requirement’. Fast Abort Dump Undulator section ILC – Central Integration SB 2009 Layout - Positron Beam Direction - Electron Beam Direction

28/03/2010Norbert Collomb18 ILC – Central Integration SB 2009 Layout Fast Abort Dump line Undulator section start - Positron Beam Direction - Electron Beam Direction Fast Abort Dump line branching off Service Tunnel start Undulator Access shaft and cavern

28/03/2010Norbert Collomb19 ILC – Central Integration SB 2009 Layout Summary: - Relatively small changes since Albuquerque and Pre-AAP meeting at DESY in Dec To get model and layout done some guess work had to be made especially in the Damping Ring Transfer Tunnel (but these are based on conversations with WG leaders). Components there are mainly place-holders awaiting confirmation. - RTML requests have been taken into consideration. Length of elevator straight needs to be revised. - No concerns from CF&S with regards to Damping Ring Tunnel being too close to Target Hall (yet?). - Next level of detail can commence if all agree the solution presented is viable (Area System representatives) and the Undulator remains at the end of the Main LINAC (still uncertain at time of writing this). Many thanks to all who contributed or aided otherwise.

Norbert Collomb28/03/ ILC – Central Integration SB 2009 Layout Positron Source and Beam Delivery System acknowledgements: Jim Clarke, Deepa Angal-Kalinin, James Jones and Andrei Seryi Damping Ring acknowledgements: Andy Wolski, Susanna Guiducci, Maxim Korostelev RTML acknowledgements: Nikolay Solyak Civil Engineering acknowledgements: John Osborne, Antoine Kosmicki (providing the presentation images), Thomas Lackowski and Vic Kuchler