Connect communicate collaborate LHCONE European design & implementation Roberto Sabatino, DANTE LHCONE Meeting, Washington, June 13-14 2011.

Slides:



Advertisements
Similar presentations
Connect. Communicate. Collaborate GÉANT2 (and 3) CCIRN XiAn 26 August 2007 David West DANTE.
Advertisements

Connect communicate collaborate LHCONE – Linking Tier 1 & Tier 2 Sites Background and Requirements Richard Hughes-Jones DANTE Delivery of Advanced Network.
T1-NREN Luca dell’Agnello CCR, 21-Ottobre The problem Computing for LHC experiments –Multi tier model (MONARC) –LHC computing based on grid –Experiment.
FNAL Site Perspective on LHCOPN & LHCONE Future Directions Phil DeMar (FNAL) February 10, 2014.
CCIN2P3 Network FJPPL 2015
Dynamically Provisioned Networks as a Substrate for Science David Foster CERN.
Trial of the Infinera PXM Guy Roberts, Mian Usman.
31 May, 2006Stefan Stancu1 Control and Data Networks Architecture Proposal S. Stancu, C. Meirosu, B. Martin.
Overview of LCG-France Tier-2s and Tier-3s Frédérique Chollet (IN2P3-LAPP) on behalf of the LCG-France project and Tiers representatives CMS visit to Tier-1.
Transatlantic Connectivity in LHCONE Artur Barczyk California Institute of Technology LHCONE Meeting Washington DC, June 13 th,
Agenda Network Infrastructures LCG Architecture Management
LHC high-level network architecture Erik-Jan Bos Director of Network Services SURFnet, The Netherlands T0/T1 network meeting NIKHEF/SARA, Amsterdam, The.
Connect. Communicate. Collaborate The Technological Landscape of GÉANT2 Roberto Sabatino, DANTE
Questionaire answers D. Petravick P. Demar FNAL. 7/14/05 DLP -- GDB2 FNAL/T1 issues In interpreting the T0/T1 document how do the T1s foresee to connect.
Applications of MPLS in GEANT Agnès Pouélé Applications of MPLS in GÉANT MPLS WORLD CONGRESS 2002 Paris 7th February 2002 Agnes.
Linking European and Chinese Research Infrastructures and Communities.
Connect. Communicate. Collaborate Building and developing international future networks Roberto Sabatino, DANTE HEANET conference, Athlone, 10 November.
Connect. Communicate. Collaborate VPNs in GÉANT2 Otto Kreiter, DANTE UKERNA Networkshop 34 4th - 6th April 2006.
T0/T1 network meeting July 19, 2005 CERN
Using E2E technology for LHC Apr 3, 2006 HEPiX Spring Meeting 2006
Connect communicate collaborate LHCONE L3VPN Status Update Mian Usman LHCONE Meeting Rome 28 th – 29 th Aprils 2014.
LHC Open Network Environment LHCONE Artur Barczyk California Institute of Technology LISHEP Workshop on the LHC Rio de Janeiro, July 9 th,
Networks ∙ Services ∙ People Enzo Capone (GÉANT) LHCOPN/ONE meeting – LBL Berkeley (USA) Status update LHCONE L3VPN 1 st /2 nd June 2015.
Thoughts on Future LHCOPN Some ideas Artur Barczyk, Vancouver, 31/08/09.
Scientific Networking: The Cause of and Solution to All Problems April 14 th Workshop on High Performance Applications of Cloud and Grid Tools Jason.
Connect. Communicate. Collaborate perfSONAR MDM Service for LHC OPN Loukik Kudarimoti DANTE.
Network to and at CERN Getting ready for LHC networking Jean-Michel Jouanigot and Paolo Moroni CERN/IT/CS.
LHC OPEN NETWORK ENVIRONMENT STATUS UPDATE Artur Barczyk/Caltech Tokyo, May 2013 May 14, 2013
From the Transatlantic Networking Workshop to the DAM Jamboree to the LHCOPN Meeting (Geneva-Amsterdam-Barcelona) David Foster CERN-IT.
NORDUnet Nordic Infrastructure for Research & Education Workshop Introduction - Finding the Match Lars Fischer LHCONE Workshop CERN, December 2012.
LHC Open Network Environment Architecture Overview and Status Artur Barczyk/Caltech LHCONE meeting Amsterdam, September 26 th,
Connect communicate collaborate LHCONE moving forward Roberto Sabatino, Mian Usman DANTE LHCONE technical workshop SARA, 1-2 December 2011.
Networks ∙ Services ∙ People Mian Usman LHCOPN/ONE meeting – Amsterdam Status update LHCONE L3VPN 28 th – 29 th Oct 2015.
Network infrastructure at FR-CCIN2P3 Guillaume Cessieux – CCIN2P3 network team Guillaume. cc.in2p3.fr On behalf of CCIN2P3 network team LHCOPN.
Connect communicate collaborate LHCONE Diagnostic & Monitoring Infrastructure Richard Hughes-Jones DANTE Delivery of Advanced Network Technology to Europe.
The GÉANT network: addressing current and future needs of the HEP community Vincenzo Capone, Mian Usman CHEP2015 – April.
Future R&E networks: Technology challenges Roberto Sabatino CTO DANTE.
Connect. Communicate. Collaborate GÉANT2 status and update, IPv6 Network Infrastructure & Services Marco Marletta, GARR HEPiX Spring meeting rd.
Connect communicate collaborate LHCONE in Europe DANTE, DFN, GARR, RENATER, RedIRIS LHCONE Meeting Amsterdam 26 th – 27 th Sept 11.
9 th November 2005David Foster CERN IT-CS 1 LHCC Review WAN Status David Foster Networks and Communications Systems Group Leader.
Ian Bird WLCG Networking workshop CERN, 10 th February February 2014
IRFU SITE REPORT Pierrick Micout CEA/DSM/IRFU/SEDI.
2005 ESCC/Internet2 Joint Tech Workshop, 15 th February 2005, Salt Lake City – Otto Kreiter GÉANT2 Otto Kreiter Network Engineering.
Strawman LHCONE Point to Point Experiment Plan LHCONE meeting Paris, June 17-18, 2013.
IT-INFN-CNAF Status Update LHC-OPN Meeting INFN CNAF, December 2009 Stefano Zani 10/11/2009Stefano Zani INFN CNAF (TIER1 Staff)1.
Networks ∙ Services ∙ People Mian Usman TNC15, Porto GÉANT IP Layer 17 th June 2015 IP Network Architect, GÉANT.
LHC-OPN operations Roberto Sabatino LHC T0/T1 networking meeting Amsterdam, 31 January 2006.
100GE Upgrades at FNAL Phil DeMar; Andrey Bobyshev CHEP 2015 April 14, 2015.
17 September 2004David Foster CERN IT-CS 1 Network Planning September 2004 David Foster Networks and Communications Systems Group Leader
1 Network Measurement Challenges LHC E2E Network Research Meeting October 25 th 2006 Joe Metzger Version 1.1.
LHCOPN / LHCONE Status Update John Shade /CERN IT-CS Summary of the LHCOPN/LHCONE meeting in Amsterdam Grid Deployment Board, October 2011.
LCG France Network Network 11/2010 Centre de Calcul de l'IN2P3/CNRS.
CCIN2P3 Network November 2007 CMS visit to Tier1 CCIN2P3.
LHCONE Phase 1 Prototype architecture. Agenda LHCONE FR prototype target architecture LHCONE FR gateways Other tiers 2 connection to LHCONE FR.
T0-T1 Networking Meeting 16th June Meeting
LHCOPN lambda and fibre routing Episode 4 (the path to resilience…)
LHCOPN/LHCONE status report pre-GDB on Networking CERN, Switzerland 10th January 2017
BGP Route Server Proof of Concept
LHCONE status and future
GÉANT LHCONE Update Mian Usman Network Architect
LHCOPN update Brookhaven, 4th of April 2017
The LHCONE network and L3VPN status update
LHCONE L3VPN Status update Mian Usman LHCOPN-LHCONE meeting
Network Monitoring and Troubleshooting with perfSONAR MDM
LHC Open Network Project status and site involvement
KISTI Daejeon, 23rd September 2015
K. Schauerhammer, K. Ullmann (DFN)
Tony Cass, Edoardo Martelli
John Gordon, STFC GDB April 6th 2011
Otto Kreiter 10th Dec LHCOPN meeting
Presentation transcript:

connect communicate collaborate LHCONE European design & implementation Roberto Sabatino, DANTE LHCONE Meeting, Washington, June

connect communicate collaborate Outline Overview European Approach Implementation status US setup and transatlantic connectivity for LHCONE Lessons learnt Conclusions

connect communicate collaborate Overview European Approach Designed according to European user’s requirements European workshop on 5 th April agreed way forward Set of Distributed Exchange Points based on GEANT infrastructure Interconnection with Netherlight

connect communicate collaborate Long-term solution Layout of (generic) Distributed Exchange

connect communicate collaborate Prototype design & implementation Logically identical to long term solution but smaller in scope (# of sites connected) Different technology, in core and in NREN connectors Shared vs dedicated capacity Use VPLS technology on existing Juniper T1600 routers to emulate a distributed LAN Make use of existing shared (IP) capacity, with logical separation from general R&E IP traffic (with separate monitoring) Confidence there is enough capacity on existing backbone links 40Gbps CH-DE-AMS 20Gbps NL-UK-FR-CH and IT-CH May upgrade links if demonstrated necessary

connect communicate collaborate Access options for NRENs to LHCONE During prototype Via a VLAN or LSP on existing port Via additional separate physical port Use backup IP port Long Term Via a VLAN on main access (e.g if main access is > 10Gbps) Via a VLAN on additional access …other…TBD

connect communicate collaborate European prototype overview NL Juniper T1600 renater GARR DFN DE Juniper T1600 IT Juniper T1600 CH Juniper T1600 FR Juniper T1600 Route server UK Juniper T1600 VPLS on IP network Border Router T1 site T2 site NREN aggregation Network 40Gbps 20Gbps To Netherlight Route server To ASGC

connect communicate collaborate Services supported in prototype P2mp and static p2p services Dynamic services not yet available. Expected 2012 GEANT-NREN pilot started now perfSONAR release available May 2011 Note: p2p circuits (with BW guarantees) are already available via GEANTPlus. No need to establish new infrastructure May need to install additional capacity, depending on demand

connect communicate collaborate Prototype costs within Europe Depending on how NREN aggregator networks (T2 clouds) connect, there may be an additional 10GE port in some locations We do not expect to have to add additional backbone capacity, for the prototype There may be exceptions, depending on traffic growth Route Server

connect communicate collaborate IMPLEMENTATION: LHCONE Setup in GEANT

connect communicate collaborate LHCONE Setup in GEANT GEANT IP Network will be invisible to T2 sites (via LHCONE) All LHC connectors will be within the same IP subnet All sites should peer with all route servers Looking for a workaround Technical service guidelines agreed with participants

connect communicate collaborate Italian Tier2 prototype L3VPN INFN-Torino ALICE LHCb ATLAS CMS 1GE 10GE INFN-Milano INFN-Legnaro INFN-Pisa INFN-Bari INFN-Napoli INFN-Roma INFN-Frascati INFN-Catania INFN-CNAF T2INFN-CNAF T1 LHCONELHCOPN

connect communicate collaborate Geneva Route-server Jussieu GEANT Paris1 Orsay Lyon1 Geneva LHCONE FR Prototype target architecture RENATER CCIN2P3 CEA-IRFU IPNHO LAL LLR RHD Saclay RAP LPNHE APC RAP Paris GRIF - Distributed T2) T1 LHCONE EU VPLS Cloud Lambda We are also currently investigating if a VRF LITE implementation would be more appropriate

connect communicate collaborate Germany

connect communicate collaborate VPLS Implementation Routers configured 10 th June-11 Tests will be performed till 17 th June-11 Route Server Implementation Route servers deployed 10 th June-11 Tests will be performed till 17 th June-11 NREN Connections NRENs will be able to connect LHC T2/3s from week starting 20 th June-11 Trans-Atlantic Connectivity GEANT ready to connect on 20 th June-11 Timescale

connect communicate collaborate Conclusions Intra European set-up Conforms to LHCONE architecture LHCONE “core” in Europe provided by a set of distributed exchange points in GEANT PoPs, interconnected to Netherlight New equipment in 2012, with allocated capacity from 10G up to 100G VPLS on existing Juniper T1600 for prototype. No need for additional capacity (bar possible exceptions) NREN aggregator networks Costs: Minimal during prototype Prototype implementation well under way

connect communicate collaborate Transatlantic connectivity - general

connect communicate collaborate Distribution of European Resources for experiments (from WSLCG) NL Juniper T1600 DE Juniper T1600 IT Juniper T1600 CH Juniper T1600 FR Juniper T1600 UK Juniper T Gbps 20Gbps Netherlight 7 sites 7.5% disk 16.5% CPU 8 sites 4% disk 11.6% CPU 11sites 21.8% disk 17.5% CPU 4 sites 9.6% disk 5.2% CPU 18 sites 9% disk 14.5% CPU 7 sites 7.% disk 6.7% CPU ES

connect communicate collaborate Transatlantic – p2mp service

connect communicate collaborate Prototype lesson N.1: Architectural issues L2 architecture does not support multi-continent/region p2mp service well: Loop avoidance Resilience NA – Europe – Asia or Asia – NA – Europe Or Europe – Asia – NA ? Bottom line issue to solve: avoid fragmentation of TA connectivity LHCONE architecture does not solve this issue for p2mp It works for p2p GEANT/ACE have made excellent progress on avoiding fragmentation for general R&E Need to look again at L3 between regions

connect communicate collaborate Conclusion Progress within Europe/GEANT on prototype implementation Initial proposal for T.A setup that meets the connectivity needs of the users (for the prototype, within its limitations) Partnership between EU NREN funded connectivity and USLHCNET Based on GEANT PoPs in Europe, US to choose PoPs in US GEANT ready from June 20 th Study lessons learnt from prototype, feed into next architecture iteration Recognition of limitation of LHCONE architecture to support p2mp services – Start prototype with one path between EU-N.A Review architecture Objectives & success criteria of prototype need to be clear