Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,

Slides:



Advertisements
Similar presentations
5 MeV Mott Measurement for CEBAF Operations group Joe Grames, Marcy Stutzman February 14 th, 2007 Sir Nevill F. Mott at the ceremony with his Nobel Prize.
Advertisements

CEBAF Photoinjector: What’s new, what’s the same since HAPPEx 2004? What needs to be done? M. Poelker, HAPPEx collaboration meeting, Feb. 18, 2005.
Parity Quality Beam (PQB) April 07, Notes: 1.For each BPM, the wires are: +X+, +X-, +Y+, +Y- 2.There are only two injector BPMs we are not reading:
Polarized Electron Source R&D at CEBAF/JLab P. Adderley, J. Brittian, J.Clark, J. Grames, J. Hansknecht, M.Poelker, M. Stutzman, R. Suleiman Students:
Commissioning of a Nebraska-type Retarding Potential Mott Polarimeter J. McCarter, M. L. Stutzman, T. J. Gay, K. Trantham, P. Adderley, J. Brittian, J.
ExperimentEnergy (GeV) Pol (%) I (µA) TargetA pv (ppb) Maximum Charge Asym (ppb) Maximum Position Diff (nm) Maximum Angle Diff (nrad) Maximum Size Diff.
ExperimentEnergy (GeV) Pol (%) I (µA) TargetA pv (ppb) Maximum Charge Asym (ppb) Maximum Position Diff (nm) Maximum Angle Diff (nrad) Maximum Size Diff.
Electronic Cross-talk & Ground Loop Elimination in Injector Riad Suleiman Center for Injectors and Sources.
CEBAF Polarized Electron Source: Outlook & Horizon Operations Group Meeting May 13 th & 20 th, 2009 Joe Grames M. Poelker, P. Adderley, J. Clark, J. Grames,
JLab Polarized Source Happex Collaboration Meeting May 18, 2007 P. Adderley, J. Brittian, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008.
Real-time Parity Feedback John Hansknecht & Riad Suleiman April 28, 2009.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Parity Quality Beam (PQB) Study Injector Group November 10, 2008.
/SC-PAC Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Joe Grames CEBAF Operations
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Strained Superlattice.
Polarized Injector Status QWeak Collaboration Meeting February 1, 2010 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman, R. Suleiman,
Operated by Jefferson Science Associates, LLC for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Polarized Electron Beam.
ExperimentEnergy (GeV) Pol (%) I (µA) TargetA pv (ppb) Maximum Charge Asym (ppb) Maximum Position Diff (nm) Maximum Angle Diff (nrad) Maximum Size Diff.
Fast Helicity Reversal Riad Suleiman Injector Group June 2, 2009.
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
The CEBAF 200kV Inverted Gun P. Adderley, M. BastaniNejad, J. Clark, J. Grames, J. Hansknecht, J. McCarter, M. Poelker, M. Stutzman, R. Suleiman, K. Surles-Law.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
DC photogun vacuum characterization through photocathode lifetime studies Marcy L. Stutzman, Philip Adderley, Joseph Grames, Matthew Poelker, Ken Surles-Law.
Re-designing the Helicity Board Riad Suleiman Injector Group March 19, 2009.
4 th Electron-Ion Collider Workshop, Hampton University, Monday May 19 th, 2008 CEBAF Load-Lock Polarized Electron Photogun Joe Grames & Matt Poelker (Jefferson.
CEBAF Polarized Electron Guns Marcy L. Stutzman for the Jefferson Lab Polarized Source Group.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Parity Experiments and JLab Injector Riad Suleiman February 5, 2016.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
Status of GaAs Photoemission Guns at JLab M. Poelker, P. Adderley, M. Baylac, J. Brittian, D. Charles, J. Clark, J. Grames, J. Hansknecht, M. Stutzman,
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
Operated by Jefferson Science Associates, LLC for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Polarized Electron Beams.
November 17, 2008 A. Brachmann Slide 1 ILC polarized Electron Source R&D Update LCWS 2008 A. Brachmann, J. Sheppard, F. Zhou - SLAC National Accelerator.
Continuous Electron Beam Accelerator Facility Polarized e-Source - Talking Points for PV experiments: P. Adderley, M. BastaniNejad, J. Clark, S. Covert,
Parity Quality Beam (PQB) B-Team Meeting September 10, 2008.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
A bit of CEBAF polarized source history…
Polarized Injector Update
PIs: Riad Suleiman and Matt Poelker
Parity Violation Experiments & Beam Requirements
Joe Grames Center for Injectors and Sources
with help from Riad Sulieman, Arne Freyberger, and Joe Grames
CEBAF Injector Update PREX/CREX March 3-4, 2017
G0 Backward Angle Accelerator Preparations
Experimental Overview
K2CsSb cathode tests at Jlab
Magnetized Bunched Electron Beam from DC High Voltage Photogun
Parity Violation Experiments at JLEIC
Parity Quality Beam (PQB)
5 MeV Mott Measurement for CEBAF Operations group
Further Measurements of Photocathode
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
QWeak Collaboration Meeting
Magnetized Electron Beam for Ion Cooling at JLEIC
ELIC Injector Working Group High-P, high-I source issues (DC)
Qweak Coordination Meeting
Center for Injectors and Sources
Polarized Source Development Run Results
R. Suleiman and M. Poelker October 12, 2018
R. Suleiman and M. Poelker September 29, 2016
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
PIs: Riad Suleiman and Matt Poelker
Injector Studies Using Superlattice Photocathode
Polarized Source: Recent Activities
PQB Meeting March 05, 2009.
G0 PC Installation and Beam Studies
MEIC Polarized Electron Source
Injector Commissioning & Optimization
Presentation transcript:

Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman, R. Suleiman, K. Surles-Law

First Inverted Gun (with Stainless Steel Cathode) installed at CEBAF, operational since July 2009 Running at 100 kV. Conditioned to 110 kV Lifetime about 100 C at 50 µA average current  2 weeks between spot moves, 2-3 months between heat/activations Maximum possible Gun Voltage is 150 kV (limited by Safety System and HV Power Supply) Inverted Gun at CEBAF

Second Inverted Gun (with large grain Niobium Cathode) installed at Test Cave in November 2009 Conditioned to 200 kV Inverted Gun at Test Cave

Measured lifetime at 100 kV (Bulk GaAs, 2 mA, 532 nm, 0.35 mm laser spot)

Test Cave Plan (June – July): I.Measure lifetime at 140 kV II.Measure lifetime at 200 kV III.Re-condition to 225 kV to reduce Field Emission (FE) at 200 kV IV.Re-measure lifetime at 200 kV with smaller FE

Fast Pockels Cell (PC) Reversal: New Helicity Board commissioned during PREx Slow Wien Reversal commissioned during PREx ExperimentRateClockPattern HAPPEx III & PVDIS30 HzFreeQuartet PREx120 Hz 240 Hz Free Quartet Octet QWeak (Preliminary)1 kHzFreeQuartet Helicity Reversal

Coordinator: Suleiman Members: Poelker, Grames, Hansknecht, King, Carlini, Paschke, Ramsay A student and a postdoc Injector Team

1.Benchmark Hall C beam with PREx Injector setup. Beam quality should be pretty good since C laser lies on top of A laser (8 hours during Beam Studies before June 22) 2.Heat & re-activate photocathode (2 shifts) 3.Install hand-wound A1 corrector to improve steering through A1 and A2 4.Study PC ringing (opto-coupler and HV Switch) and swap PC (if needed), then perform Pockels Cell re-alignment (2 shifts) Commissioning Plan

5.Devise a means to quantify ringing on once a week basis. An access to laser table can be made, but remote measurement preferable. 6.Rotate photocathode to reduce effect of vacuum window birefringence (1 shift) 7.Wien Filter calibration, part II (2 shifts during beam studies before June 22)

8.Study beam phase-space when using Wien Flip. Quantify the difference between Vertical Wien and Solenoid method with beam to Hall and large position differences (2 shifts) 9.After PREx ends, and before summer shutdown, run 180 µA using 100 kV gun to assess beam quality and for beamline and hydrogen target commissioning 10.Zero vertical polarization using 5 MeV Mott Polarimeter in Injector – requirement: P y < 4% (1 shift)

11.Spin dance to zero transverse polarization using Hall C Polarimeter – requirement: P x < 4% 12.Optimize Helicity Board settings: T_Settle, T_Stable, and Pattern. Need hydrogen target and Lumi (3 shifts) 13.Try 32 MHz beam for background studies and Moller Polarimeter in Hall C

Deferred To Summer Shutdown (August) 4-peak charge asymmetry feedback IA electronics: installation and commissioning CEBAF Inverted Gun HV Conditioning to 150 kV Injector setup with 125 kV gun (or higher) and commissioning Modification to Beamline: New A1 Aperture assembly installation and beamline bake out