Status report on ICARUS T600 (CNGS-2) F. Pietropaolo (ICARUS Collaboration) SPSC, 26-06-2007.

Slides:



Advertisements
Similar presentations
F. Arneodo Imaging 2003 The ICARUS T600 Liquid Argon Time Projection Chamber Francesco Arneodo Laboratori Nazionali del Gran Sasso on behalf of the ICARUS.
Advertisements

J. Strait Fermilab October 21, 2005 The Neutrino Detector of the Future: A Massive Liquid Argon TPC.
HARP Anselmo Cervera Villanueva University of Geneva (Switzerland) K2K Neutrino CH Meeting Neuchâtel, June 21-22, 2004.
A two level trigger system for the ICARUS LAr-TPC Daniele Dequal Università degli Studi di Padova and INFN Padova on behalf of the ICARUS collaboration.
MODULAr: concept design of internal detector mechanics A. Menegolli, University and INFN Pavia.
S. Bricola, A. Menegolli, M. Prata, M.C. Prata, G.L. Raselli, M. Rossella, C. Vignoli INFN and University of Pavia - Via Bassi, 6 – Pavia – Italy.
Off-axis Simulations Peter Litchfield, Minnesota  What has been simulated?  Will the experiment work?  Can we choose a technology based on simulations?
An accelerator beam of muon neutrinos is manufactured at the Fermi Laboratory in Illinois, USA. The neutrino beam spectrum is sampled by two detectors:
First Observations of Separated Atmospheric  and  Events in the MINOS Detector. A. S. T. Blake* (for the MINOS collaboration) *Cavendish Laboratory,
The Design of MINER  A Howard Budd University of Rochester August, 2004.
The ICARUS T600 LAr TPC Andreas Badertscher, ETH Zurich ICARUS collaboration.
Frank Calaprice Princeton University
Neutron background measurement at LNGS: present status Measurement carried out in collaboration between LNGS ILIAS-JRA1 and ICARUS groups.
Status of the OPERA experiment Yoshiaki Nonoyama Nagoya Univ.
10/24/2005Zelimir Djurcic-PANIC05-Santa Fe Zelimir Djurcic Physics Department Columbia University Backgrounds in Backgrounds in neutrino appearance signal.
ICARUS Status and plans SPSC CERN, June 24 th 2014 P. Sala INFN Milano On behalf of the ICARUS Collaboration.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Atmospheric Neutrino Oscillations in Soudan 2
Detection of Cerenkov light emission in LAr Ettore Segreto University of L’Aquila Ettore Segreto University of L’Aquila Cryodet International Workshop.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
ICARUS General Trigger Design Contributions from: M.Della Pietra, A.Di Cicco, P.Di Meo, G.Fiorillo, P.Parascandolo, R.Santorelli, P.Trattino B.Baboussinov,
Present and future detectors for Geo-neutrinos: Borexino and LENA Applied Antineutrino Physics Workshop APC, Paris, Dec L. Oberauer, TU München.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Preliminary Results from the MINER A Experiment Deborah Harris Fermilab on behalf of the MINERvA Collaboration.
NuMI Off-Axis Experiment Alfons Weber University of Oxford & Rutherford Appleton Laboratory EPS2003, Aachen July 19, 2003.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
Nucleon Decay Search in the Detector on the Earth’s Surface. Background Estimation. J.Stepaniak Institute for Nuclear Studies Warsaw, Poland FLARE Workshop.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
Medium baseline neutrino oscillation searches Andrew Bazarko, Princeton University Les Houches, 20 June 2001 LSND: MeVdecay at rest MeVdecay in flight.
E. W. Grashorn and A. Habig, UMD, for the MINOS Collaboration The Detectors of The Main Injector Neutrino Oscillation Search (MINOS) Experiment The MINOS.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
Accelerator-based Long-Baseline Neutrino Oscillation Experiments Kam-Biu Luk University of California, Berkeley and Lawrence Berkeley National Laboratory.
MiniBooNE MiniBooNE Motivation LSND Signal Interpreting the LSND Signal MiniBooNE Overview Experimental Setup Neutrino Events in the Detector The Oscillation.
Status report on ICARUS T600 (CNGS-2) D. Gibin (ICARUS Collaboration) SPSC,
Congresso del Dipartimento di Fisica Highlights in Physics –14 October 2005, Dipartimento di Fisica, Università di Milano Icarus: a multipurpose.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
DARK MATTER SEARCH Carter Hall, University of Maryland.
1 LTR 2004 Sudbury, December 2004 Helenia Menghetti, Marco Selvi Bologna University and INFN Large Volume Detector The Large Volume Detector (LVD)
Installation of the T600 at Fermilab CSN2, September 22,
Status and oscillation results of the OPERA experiment Florian Brunet LAPP - Annecy 24th Rencontres de Blois 29/05/2012.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
NBI2006 Starting OPERA data-taking with the CNGS beam D.Autiero IN2P3/IPN Lyon 5/9/2006.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
The chamber readout scheme consists of three parallel wire planes: the first facing the drift region, with horizontal wires (Induction I plane); the other.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
2008 European School of High-Energy Physics - Trest, Czech Republic - 19 August - 1st September Target Tracker Data Analysis In OPERA Experiment S. Dmitrievsky,
ICARUS Status and Plans NNN13 Kavli IPMU November 2013 D. Gibin Dipartimento di Fisica e Astronomia and INFN Padova For the ICARUS Collaboration.
The ModuLAr Project LoI discussion INFN-LNL 21/11/2007 Legnaro (PD)
Status of the NO A Experiment Kirk Bays (Caltech) on behalf of the NO A collaboration Lake Louise Winter Institute Saturday, Feb 22, 2014.
R. Sulej National Centre for Nuclear Research, Otwock/Swierk Poland for the ICARUS Collaboration XV International Workshop on Neutrino Telescope Venice.
Observation Gamma rays from neutral current quasi-elastic in the T2K experiment Huang Kunxian for half of T2K collaboration Mar. 24, Univ.
 CC QE results from the NOvA prototype detector Jarek Nowak and Minerba Betancourt.
Some preliminary comments on the future options at Fermilab (T600 + short baseline options) A. Guglielmi INFN Padova, Italy On behalf of the ICARUS Collaboration.
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
Alex Howard, Imperial College Slide 1 July 2 nd 2001 Underground Project UNDERGROUND PROJECT – Overview and Goals Alex Howard Imperial College, London.
Daniel H. Gutiérrez Velázquez Fermi National Accelerator Laboratory PPD – Neutrino MicroBooNE.
The NOνA data driven trigger Matthew Tamsett for the NOνA collaboration NOνA Neutrino 2014, XXVI International Conference on Neutrino Physics and Astrophysics.
/18 N eutrino E xperiment with S pectrometer S i n E urope Search for sterile neutrinos at CERN G. Sirri INFN Bologna on behalf of the NESSiE Collaboration.
ICARUS T600: low energy electrons
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
Status of the OPERA experiment
Results from OPERA Pablo del Amo Sánchez for the OPERA collaboration
Physics with the ICARUS T1800 detector
Davide Franco for the Borexino Collaboration Milano University & INFN
p0 detection and reconstruction with the
A. Menegolli, University of Pavia and INFN Pavia
G. Battistoni, R. Brunetti, K. Cieślik, A. Dąbrowska, R. Dolfini,
Presentation transcript:

Status report on ICARUS T600 (CNGS-2) F. Pietropaolo (ICARUS Collaboration) SPSC,

Francesco Pietropaolo2 A. Ankowski 1, M. Antonello 2, P. Aprili 3, F. Arneodo 3, B. Baibussinov 4, M. Baldo Ceolin 4, G. Battistoni 5, P. Benetti 6, A. Borio 6, E. Calligarich 6, M. Cambiaghi 6, F. Carbonara 7, F. Cavanna 2, S. Centro 4, A. Cesana 5, K. Cieslik 8, A. G. Cocco 7, A. Dabrowska 8, R.Dolfini 6, C. Farnese 4, A. Fava 4, A. Ferrari 5, G. Fiorillo 7, S. Galli 2, D. Gibin 4, A. Gigli Berzolari 6, A. Giuliano 9, K. Graczyk 1, S. Gninenko 10, A. Guglielmi 4, C. Juszczak 1, J. Holeczek 11, D. Kielczewska 12, M. Kirsanov 10, J. Kisiel 11, T. Kozlowski 13, N. Krasnikov 10, M. Lantz 5, G. Mannocchi 9, M. Markiewicz 8, V. Matveev 10, F. Mauri 6, A. Menegolli 6, G. Meng 4, C. Montanari 6, S. Muraro 5, J. Nowak 1, O. Palamara 3, L. Periale 9, G. PianoMortari 2, A. Piazzoli 6, P. Picchi 9, F. Pietropaolo 4, W. Polchlopek 14, M. Posiadala 12, M. Prata 6, P. Przewlocki 13, A. Rappoldi 6,. G. L. Raselli 6, E. Rondio 13, M. Rossella 6, C. Rubbia 3, P. Sala 5, L. Satta 9, D. Scannicchio 6, E. Segreto 3, F. Sergiampietri 15, J. Sobczyk 1, D. Stefan 8, J, Stepaniak 13, R. Sulej 16, M. Szarska 8, M. Terrani 5, G. Trinchero 9, F. Varanini 4, S. Ventura 4, C. Vignoli 6, T. Wachala 8, A. Zalewska 8, K. Zaremba 16 1 Wroclaw University of Technology, Wroclaw, Poland 2 Dipartimento di Fisica e INFN, Università di L’Aquila, Via Vetoio, I Laboratori Nazionali del Gran Sasso dell’INFN, Assergi (AQ), Italy 4 Dipartimento di Fisica e INFN, Università di Padova, Via Marzolo 8, I Dipartimento di Fisica e INFN, Università di Milano, Via Caloria 2, I Dipartimento di Fisica Nucleare, Teorica e INFN, Università di Pavia, Via Bassi 6, I Dipartimento di Scienza Fisiche, INFN e Università Federico II, Napoli, Italy 8 H. Niewodniczanski Institute of Nuclear Physics, Krakow, Poland 9 Laboratori Nazionali di Frascati (INFN), Via Fermi 40, I INR RAS, prospekt 60-letiya Oktyabrya 7a, Moscow , Russia 11 University of Silesia, 12 Bankowa st., Katowice, Poland 12 Warsaw Univeristy, Krakowskie Przedmiescie 26/28, Warszawa, Poland 13 A. Soltan Institute for Nuclear Studies, Swierk/Otwock, Poland 14 AGH University of Science and Technology, Al. Mickiewicza 30, Krakow, Poland 15 Dipartimento di Fisica, Università di Pisa, Largo Bruno Pontecorvo 3, I Univeristy of Technology, Pl. Politechniki 1, Warsaw, Polanda The ICARUS collaboration

SPSC, Francesco Pietropaolo3 The ICARUS T600 LAr-TPC Approved and funded by INFN in Built between years 1997 and 2002 (including prototyping, industrialization and testing). Completely assembled in the INFN assembly hall in Pavia. Full scale demonstration on surface with first T300 in 2001: –Three months data taking with cosmic rays –Study of detector performance –Full scale analyses –Completely successful T600 second half-module terminated in Access to LNGS postponed because of Borexino accident until early Argon activities suspended also on surface (Pavia). Now (2007) under final installation at LNGS.

SPSC, Francesco Pietropaolo4 The T600 module: 2001 in Pavia Cryostat (half-module) 20 m 4 m Inner detector Readout electronics channels Three wire planes and a PMT Wire Chamber Side A Drift distance 2 x 1.5 m Cathode Wire Chamber Side B

SPSC, Francesco Pietropaolo5 …and observing cosmic events Walking on the detector… Test run in Pavia

SPSC, Francesco Pietropaolo6 Electronic “Bubble Chamber” Run 960, Event 4 Collection Left 25 cm 85 cm 176 cm 434 cm Run 308, Event 160 Collection Left 265 cm 142 cm Muon decay E.m.shower Hadronic interaction

SPSC, Francesco Pietropaolo7 Publications The T300 technical run in Pavia has been reported by numerous articles illustrating the successful development of this new technology 1.F. Arneodo et al., "Observation of long ionizing tracks with the ICARUS T600 first half-module”, NIM-A508 (2003) S. Amoruso et al., "Analysis of the liquid argon purity in the ICARUS T600 TPC”, NIM-A516 (2004) M. Antonello et al., "Detection of Cherenkov light emission in liquid argon”, NIM-A516 (2004) S. Amoruso et al., "Study of electron recombination in liquid argon with the ICARUS TPC”, NIM- A523 (2004) S. Amoruso et al., "Measurement of the µ decay spectrum with the ICARUS liquid Argon TPC”, EPJ-C33 (2004) S. Amerio et al., "Design, construction and test of the ICARUS T600 detector”, NIM-A527 (2004) A. Ankowski et al., "Characterization of ETL 9357FLA Photomultiplier Tubes for Cryogenic Temperature Applications”, NIM-A556 (2006) A. Ankowski et al., "Measurement of through-going particle momentum by means of multiple scattering with the ICARUS T600 TPC”, EPJ-C48 (2006) F.Arneodo et al., "Performance of a liquid Argon time projection chamber exposed to the CERN West Area Neutrino Facility neutrino beam”, Phys.Rev.-D74 (2006) ICARUS collaboration, "Analysis of Liquid Argon Scintillation Light Signals with the ICARUS T600 Detector", in preparation (2007) 11.ICARUS collaboration, “Pi-zero reconstruction in ICARUS T600”, in preparation (2007)

SPSC, Francesco Pietropaolo8 Physics issues The ICARUS T600 detector is a necessary intermediate technical step towards a much more massive LAr detector (multikton LAr-TPC are now being actively studied), but it offers also some interesting physics in itself. The T600 at LNGS will collect simultaneously “self triggered” events of different nature. This in particular represents: –≈ 100 ev/year of individually recorded atmospheric CC neutrinos. –Solar neutrino electron rates >5 MeV. –Supernovae neutrinos. –A zero background proton decay with 3 x nucleons for ”exotic” channels. –CNGS beam related neutrino events: The T600 raw fiducial volume ≈ 480 t is equivalent nominally to 1200  CC ev/y and 7-8 e CC ev/year. A complete review of the T600 potentialities was recently presented to the SPSC (Oct meeting).

SPSC, Francesco Pietropaolo9 The path to underground operation(1) In December 2003 a generalized risk analysis for large mass cryogenic liquid detectors to be operated underground was completed by the LNGS staff under the mandate of a specially nominated Government’s “Extraordinary Commissioner”. In particular the detailed consequences for the operation of ICARUS were specified and new procedures were agreed. Hall B was chosen as the location for T600. In December 2004 the ICARUS collaboration received the “green light” to initiate the transfer of the two T300 modules from PAVIA to LNGS, however only to a “parking position” in Hall B. Incidentally the final position was finally reached only in June In view of the simultaneous installation of other experiments and in particular of the extensive use of space in Hall B for the construction of OPERA, a very difficult and conflicting situation has further slowed down the timetable of the installation of ICARUS.

SPSC, Francesco Pietropaolo10 Moving to LNGS On the road

SPSC, Francesco Pietropaolo11 Entering into LNGS Hall B to the parking lot

SPSC, Francesco Pietropaolo12 The busy situation in Hall B SITE T600 BAM OPERA Service Area T600 modules in parking position OPERA building Control Rooms ICARUS & OPERA

SPSC, Francesco Pietropaolo13 The path to underground operation(2) The stainless steel structure of the underground supporting cage was completed in March In the following months, the bottom insulation panels and the side-walls were installed. By March 2006 they were vacuum tested at the required insulation level < 7 W/m 2. At the same time the supporting feet, mounted on the anti- seismic shock absorbers, were welded and tested. All the insulation panels were mounted in their final location, except the downstream end-cap. The cold shields were all tested and installed by April Finally, the positioning of the two T300 cryostats inside the holding structure has been completed on June 19, 2007.

SPSC, Francesco Pietropaolo14 “services” loft Frames, shock absorbers and feet. 20are fastened to the shock absorbers and welded The 20 support feet, stainless steel made, are fastened to the shock absorbers and welded to the bottom panel (He-tested).

SPSC, Francesco Pietropaolo15 FOOT Shock absorber frame beam The bottom frame A tight container (a metallic cage) is suspended on the shock absorbers. The cage is used for both pressure and seismic force containment.

SPSC, Francesco Pietropaolo16 safety… Insulation acts as a containment box in case of cryogenic liquid spillages and stands 100 mbar overpressure. The evacuation circuit has been vacuum tested : < mbar l s -1 ) 20 positioning rings

SPSC, Francesco Pietropaolo17 The insulation panels The insulation panels, ready at factory at the end of 2005, were transferred to LNGS late in 2006.

SPSC, Francesco Pietropaolo18 The “feet” Carbon fibre tube Perlite filled Upper support closure

SPSC, Francesco Pietropaolo19 Bottom and lateral insulation Place ready to host the cryostats. The bottom and lateral insulations (vacuum tested up to mbar) are in place and welded. The support feet of the cryostats are ready and vacuum tested. The LN cold shields (vacuum tested) are ready to be installed.

SPSC, Francesco Pietropaolo20 Upstream closure The panel has been transported in two parts Then, re-welded Ready in place Moved to final position

SPSC, Francesco Pietropaolo21 Moving the cryostats… First semi- module on the way First semi-module in place Place of second semi-module

SPSC, Francesco Pietropaolo22 … in their final location Moving the second semi- module The positioning of the two cryostats inside the holding structure has been completed on June 19, 2007 Almost in place

SPSC, Francesco Pietropaolo23 T600 modules moved to LNGS: December 2004 Anti seismic frame (partially) installed:Feb-Mar 2005 Test of the insulation (< 7 W/m 2 ):Oct-Dec 2005Test of the insulation (< 7 W/m 2 ):Oct-Dec 2005 Cryogenic components factory):Jan-March 2006Cryogenic components factory):Jan-March 2006 Insulation LNGS:December 2006Insulation LNGS:December 2006 Cryostats in their final position:June 19 th, 2007Cryostats in their final position:June 19 th, 2007 Summarizing the progress achieved:

SPSC, Francesco Pietropaolo24 T600 general layout Dewar LN 2 (30 m 3 ) Dewar LAr (30 m 3 )

SPSC, Francesco Pietropaolo25 Future actions... With the cryostats in place: Accurate inspection of the wire chamber mechanics, of the PM’s and of the inner slow control instrumentation (18 days)… When the upper floor is accessible: Installation of the electronics racks (36 man-days): On board power supply cabling T600 cabling (25 man-days) Test of the racks (36 man-days ). Trigger system installation and test. …Installation of the signals chimneys (15 days)…

SPSC, Francesco Pietropaolo26 MAINS supply (from the main cabinet to Hall B). Continuity power supply (UPS). Water cooling circuit. Cold pipeline for the cryo-liquids filling. ETHERNET cabling. Sensor-nets for the safety controls, in Hall B. Software for the Central Labs controls room. Production of cryogenic liquids for T600 General Infrastructures The development of these activities, their cost and the schedule are under the responsibility of LNGS All these activities are scheduled to be completed by the end of 2007

SPSC, Francesco Pietropaolo27 GAr purifaction circuit LAr purif. circuit LN2 circuit COOLING Layout of cryogenic structure

SPSC, Francesco Pietropaolo28 The liquefier system is under construction at Stirling site under their responsibility. negotiated and solvedAll geometrical constraints and matching interfaces with Air Liquide have been negotiated and solved. The commissioning is foreseen for December LN2 re-condensation It will be then possible to operate ICARUS T600 in a closed circuit, without Nitrogen outflow, with a factor 2 of safety in installed power

SPSC, Francesco Pietropaolo29 Schedule toward completion  Cooling down  Evacuate the cryostats Cryostats in final position (DONE)June 19th, 07 Completing the cold shielding and top floorJuly 20th, 07 Detector inspection and cabling of feed-throughsAugust 07 Instrumentation of the cryogenic plantAugust 07 Readout electronics & cabling in placeOctober 07 N 2 and Ar cryogenic circuits assemblyDecember 07  T600 main detector completed by October  General Infrastructures completed by December  First cosmic events  Filling with N2 and LAr

SPSC, Francesco Pietropaolo30 Conclusion The delicate installation of T600 underground is proceeding smoothly and nearing its completion There is excellent expectation that both detector and LNGS infrastructures will be fully operational early in 2008… …on time for the first CNGS physics run scheduled for Spring 2008

SPSC, Francesco Pietropaolo31 Additional slides

SPSC, Francesco Pietropaolo32 DAQ event builder The Event Builder architecture foresees: 4 DAQ hosts, 2 hosts as Virtual Filesystem controllers and 4 Disk Arrays (at least 30 TBytes) as short term storage. Moreover Switches and long haul Tranceivers for the dedicated GigaEthernet and FiberChannel networks are needed to transfer data from the Hall B to the external laboratories (7km away) at a rate of 2Gbit/s. At present funding allows for: the complete networking infrastructure, 1 DAQ host + 1 processing node, 7 TBytes of storage (only in hall B) equivalent to ~100K full drift events. These limited resources are nevertheless enough for a first run: all the components are procured and/or installed at LNGS.

SPSC, Francesco Pietropaolo33 DAQ architecture

Event rates and storage needs High energy cosmic rays: ~150 through-going muons/hour, ~0.3/day atmospheric neutrinos ~200 GBytes/day CNGS events: ~10 interactions inside the T600 per day + ~20  /day from interactions in surrounding rock ~ 1.5 GBytes/day + up to ~2TBytes per day initially (for trigger rates and efficiency tests) Calibration: ~100 GBytes live storage (~500 GBytes during commissioning) Low energy events (including solar + supernovae ): ~1-2 ev/day from solar ~2 Hz (5 MeV thresh.): mainly natural radioactivity and PM dark current up to 2.0 TBytes/day: data reduction mandatory!

SPSC, Francesco Pietropaolo35 Computing resources LIVE storage: –~10 TBytes (underground) + 10 TBytes (outside). –~5 TBytes for low energy event buffer. –~5 TBytes intermediate storage for first processing Long term storage: –~100 TBytes/yr (real events) –~10 TBytes (MC events) Raw data processing: ~10 8-core machines. MonteCarlo: ~1 CPU unit (event generation) + 7 CPU unit for analysis

SPSC, Francesco Pietropaolo36 Trigger system The trigger system will be capable of generating a signal for both global and localized detector regions according to the event type and size, exploiting light and ionization signals in LAr. –The front-end electronics provide analogue signals corresponding to the sum of 32 adjacent wires, i.e. about 10 cm slice of LAr. –A custom developed board (LTCU) able to discriminate these signals and to provide suitable input for the trigger logics is being tested on small LAr-TPC prototypes at LNL laboratory and CERN. –The signals from PMT and from the LTCU will be elaborated by powerful FPGA’s mounted on a dedicated crate to compose coincidence patterns between light and wire planes. –The use of FPGA’s allows large flexibility in programming the pattern topologies and multiple trigger conditions. –In this way several trigger pattern like isolated cosmic muons, atmospheric and solar neutrinos, proton decay and neutrinos from the CNGS beam will coexist. The CNGS beam trigger will also profit from the early warning signal delivered from CERN-SPS to produce a gate corresponding to the beam extraction and arrival at LNGS. This activity is under way in collaboration with CERN and LNGS –Based on similar developments undertaken by OPERA, CERN and LNGS.

SPSC, Francesco Pietropaolo37 Search for sterile CNGS The possibility of one or more additional, “sterile” kinds of neutrino - namely of neutrinos which do not participate in the weak interactions - has been put forward by an interpretation of the Los Alamos LSND. Very recently, the Mini-BooNE experiment has disclosed its results, which are not consistent with the LSND observations. –Both LSND and MiniBoone experiments are characterised by: << 1 GeV quasi-elastic events requiring elaborate selection criteria a relatively short oscillation path from the source to the detector the addition of substantial competing backgrounds due to misinterpreted events. therefore the signal should appear as an event excess peaking at low values of the visible  energy. The ICARUS technology allows for a completely independent check, with the great advantage of the total rejection of neutral current backgrounds. –The CNGS beam and the ICARUS “bubble chamber” identification is based on: Deep inelastic e CC events recorded in the minimum bias mode. Extremely good background discrimination, limited only to the intrinsic beam e contamination: ≤0.8% in the chosen E interval of 10 ÷ 30 GeV. Excellent electron discrimination against converted  ’ s because of the differences in ionization losses in the earliest part of the track (negligible NC backgrounds). Very long path-length which ensures several oscillations periods from source to detector in the foreseen LSND window (with L/E values similar to those of LSND and MiniBooNE)

SPSC, Francesco Pietropaolo38 Reconstructed CC events in T600 e -, 15 GeV, p T =1.16 GeV/c Vertex: 1  0,2p,3n,2 ,1e - CNGS e interaction, E =16.6 GeV 120 cm 290 cm CNGS  interaction, E =21.3 GeV Vertex: 3 ,5p,9n,3 ,1  80 cm 300 cm

SPSC, Francesco Pietropaolo39 Events with leading electron signature electron (right) and  0 (left) in T600 The CNGS  spectrum has a most probable energy of about 25 GeV. The calculated e spectrum is expected to be accurate within 5%. Electron shower events are extremely well identified experimentally, because of the ionization behaviour in the first cells after the vertex.

SPSC, Francesco Pietropaolo40  0 reconstruction (on-going analysis) Wire coordinate (3mm pitch) 1800 mm 1400 mm Drift time coordinate 230 hadronic interactions with  0  candidates have been selected from ICARUS T300 Pavia run 11 22 Vertex The measured photon radiation length is in agreement with expectation: The average (  ) invariant mass is in agreement with the  0 mass hypothesis (m  0 = 135 MeV/c 2 ); The systematic error is mostly due to the calibration Preliminary

SPSC, Francesco Pietropaolo41 NC background rejection A full simulation of oscillated and background events in the T600 module has been carried out for different possible combinations of the oscillation parameters in the LSND allowed region The latest calculations of the CNGS neutrino spectra and the nominal intensity ( pot/y) have been assumed. All background sources have been considered: –Intrinsic beam e contamination –Intrinsic beam anti- e contamination –Neutral current events misidentified as e events –  oscillations into  followed by  CC events and  decay in e +X The background due to neutral current events has been rejected thanks to: –vertex reconstruction; –pion mass reconstruction; –dE/dx analysis of the electron/photon tracks. Residual misidentification < 0.1% Electron identification efficiency = 90% >> NC background negligible with respect to intrinsic e <<

SPSC, Francesco Pietropaolo42 The case of large exposure The visible energy spectra in the ideal situation of very large exposure (1700 kt pot) have been reconstructed. –The hypothetical spectrum from a  13 driven oscillation in the Chooz limit for  m 23 = eV 2 is also included. –The energy resolution of the LAr-TPC allows peak separation for most of the explored oscillation parameters. Both background and the  13 events have a lower energy than the LSND-like oscillations. –True for most of the LSND allowed region, where the mass difference is much larger than the atmospheric one. –In this region, the number of LSND- oscillated events is independent on the value of the mass difference, since the oscillation appears as a modulation of the original muon neutrino flux. LSND1 LSND2

SPSC, Francesco Pietropaolo43 T600 performance Due to the limited exposure (11 kt pot in 5 years), a poor reconstruction of the oscillation pattern will be available with the T600 However the oscillated event rate can be significantly larger than the expected backgrounds. A 10 GeV threshold on the visible energy has been applied to enhance the signal to background ratio Spectra and rates have been obtained assuming a minimal fiducial volume cut on the vertex position, corresponding to 90% acceptance. LSND1 LSND2

SPSC, Francesco Pietropaolo44 Physics reach The sin 2 (2  )-  m 2 explored region covers most of LNSD allowed areas and extends to lower value of  m 2 Two indicated points are reference values of MiniBooNE proposal and of previous slides One year of data taking will be enough to exclude sin 2 (2  ) values larger than at 90% CL. LSND1 LSND2