Calo Calibration meeting 08 september 2009 Calorimeter Olivier Deschamps LPC Clermont-Fd Software Status&News.

Slides:



Advertisements
Similar presentations
GCT Software Jim Brooke GCT ESR, 7 th November 2006.
Advertisements

Trigger Validation Board PVSS panels tutorial 1. TVB components 2 FPGA controls :  FPGA HCAL hadron trigger  FPGA EPPI electron, photon, pi0, Global.
Monitoring for Data Quality Status of monitoring Histogramm analysis tools Data quality qualification.
Calo Calibration meeting 10/19/2010 Tools & software O. Deschamps (LPC)
M. Adinolfi - University of Bristol1LHCb software week - 18/06/2009 Offline monitoring Marco Adinolfi University of Bristol.
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
1 N. Davidson Calibration with low energy single pions Tau Working Group Meeting 23 rd July 2007.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
PHOS calibration in CDB framework M.Bogolyubsky, Y.Kharlov B.Polichtchouk, S.Sadovsky IHEP, Protvino ALICE off-line week 3 October 2005.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
Chris Parkes for VELO software Group VELO Software Overview & Shutdown Planning Organisation Milestones 3 Critical Areas.
Calorimeter Data Monitoring News Benoit Viaud (LAL-in2p3) B. Viaud, Calo Mtg Aug. 31 st
Status of the LHCb MC production system Andrei Tsaregorodtsev, CPPM, Marseille DataGRID France workshop, Marseille, 24 September 2002.
Software installation for commissioning tests Olivier Deschamps Calorimeter commissioning meeting – 05 april 2007.
1 Control Software (CAT) Introduction USB Interface implementation Calorimeter Electronics Upgrade Meeting Frédéric Machefert Wednesday 5 th May, 2010.
RPC DQA but also Monitoring for the DCS group: status and prospective for Marcello Bindi RPC L1MU Barrel DQM - 08/05/2013.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
A Technical Validation Module for the offline Auger-Lecce, 17 September 2009  Design  The SValidStore Module  Example  Scripting  Status.
CMS pixel data quality monitoring Petra Merkel, Purdue University For the CMS Pixel DQM Group Vertex 2008, Sweden.
1 T1-T3 in L1 algorithm  Outlook: I) Summary of L1-confirmation II) About the TrgForwardTracking package III) Confirming (preliminary)  L1-confirmation.
Kali Calo progress report Dasha Savrina (ITEP/Moscow), Vanya Belyaev.
STAR Collaboration Meeting, BNL, Feb 2005 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software update L3 display 200 GeV February.
Reconstruction Configuration with Python Chris Jones University of Cambridge.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
Calorimeter Status Pascal Perret LPC Clermont 22 March 2011.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
M.N Minard Calorimeter Calibration scheme Calorimeter calibration procedure.
CBM ECAL simulation status Prokudin Mikhail ITEP.
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
Photon reconstruction and matching Prokudin Mikhail.
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
Software status for commissioning tests Olivier Deschamps Calorimeter commissioning meeting – 14 february 2007.
1 SICBDST and Brunel Migration status and plans. 2 Migration Step 1: SICBMC/SICBDST split  Last LHCb week: Split done but not tested  Software week.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
DØ Calorimeter Software Meeting April 26, Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 1  Examines  Crate Unpacking.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
DØ Algorithms Meeting April 6, Leslie Groer, Columbia Univ Ursula Bassler, LPNHE, ParisCalorimeter Online Software Status 1  Examines  Crate Unpacking.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
Calibration hits in Jets A proposal for a package analyzing calibration hits inside reconstructed jets Pierre–Antoine Delsart Mohsen Kharzad & Rachid Mazini.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Calibration & Monitoring M.N Minard Monitoring News Status of monitoring tools Histogramm and monitoring meeting 6/02/08 Calibration farm brainstorming.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
20 October 2005 LCG Generator Services monthly meeting, CERN Validation of GENSER & News on GENSER Alexander Toropin LCG Generator Services monthly meeting.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
Kali Calo progress report Dasha Savrina (ITEP/Moscow), Vanya Belyaev.
Electron and Photon HLT alley M. Witek K. Senderowska, A. Żurański.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
David Lange Lawrence Livermore National Laboratory
11 june 2002 CMS ECAL : Patrick Jarry ( Saclay) 1 Pulse shape reconstruction : CMS ECAL Introduction –the problem –the tools –experimental pulse shape.
1 MC Production and Reconstruction Summary and Plans Valeria Bartsch, Fabrizio Salvatore, A.-M. Magnan, and Nigel Watson.
Calo Objects summary Calo news TURCAL PID tools.
Online Monitoring : Detector and Performance check
Calorimeter Software Status & News Software week – 17/06/2009
VELO Software Update TELL1 Algorithms Error analysis
Status and plans for bookkeeping system and production tools
Production client status
Presentation transcript:

Calo Calibration meeting 08 september 2009 Calorimeter Olivier Deschamps LPC Clermont-Fd Software Status&News

Calibration Farm automatic analysis Reminder : LED data histogramed in Calibration Farm Pedestal and LED-signal mean and RMS per channel (+ possibly the detailed distributions) DataSet stored every mn containing O(6k) LED flashes per channels Automatic analysis based on OMAlib Configure ‘CaloMonitor’ object mean pedestal follower, noise level, gain variation, … provides warning and alarms provides summary histograms (alarm levels, location of problematic channels, …) see talk in 29 april 2009 meeting for details Automatic analysis can be easily configured for other purpose. E.g. : validate dead channels on physics data in Monitoring Farm (useful for Prs/Spd) Identify channel with timing asymmetry and kernel out of expected range Automatic procedure succesfully commissionned during summer with Sergey : During LED run taken by Irina on 07/30 Orwell histogram redirected on Monitoring Farm during the test After fixing several configuration problems the automatic analysis nicely provided Ecal status for pedestal and LED every time a new DataSet was saved (every 10mn) Configuration options ready to set the actual Calibration Farm in operation

Calibration Farm : next to do Tune histo production (pedestal/led range, …) and fill condDB with initial values(OD) would be useful to have ‘reference’ LED data with nominal conditions including empty LED flashing in the calibration sequence (for Xtalk free analysis of pedestal) Need help from Irina/Anatoly to setup the nominal LED sequence for XCal Stephane kindly provides such file for Prs (but not perfect – many channels saturating) Refine ‘CaloMonitor’s for EHcal and Prs (Sergey) Define default presenter page with analysis summary histo (OD) Develop code to analyze consecutive data set(volunteer) time evolution for many variables useful to define stability range for each parameter Develop script to fastly retrieve information from log and summary(volunteer) tools for piquets to digest summary info and help to decision taking retrieve problematic channels - follow problems evolution - … Link to Condition DataBase (volunteer) produced new condition table ready for condDB update from caloMonitor (OD) déjà vu condDB update procedure to be transmitted via DIM to a PVSS DataPoint. need PVSS expert to built a panel to manage these information. Documentation/tutorial(all)

Miscalibration exercise Miscalibrated data production Full production of miscalibrated data software in place + options configuration ready See Albert’ talk Reprocessing existing data Fast procedure but reprocessing already digitized data gives approximate miscalibration no miscalibration for the 1bit Spd 0-suppression/saturation effect for Prs/Xcal Available sample : 10M Fest09 minibias events (run k L0-filtered ) 170k B  K* γ events (run k L0-filtered) 10% RMS miscalibration in Ecal, Hcal and Prs + 11 dead channels in each. files on Castor at /castor/cern.ch/user/o/odescham/data/2009/Fest09-CaloMisCalib-v0 Aurélien ran the Eflow method on the 10M ‘miscalibrated’ minibias Blind test : compare re-calibration coefficients (Aurélien) to initial miscalibration (OD) Results on next slides See Aurélien talk for details about the procedure

Calibration blind test : Ecal Distribution of miscalibation coefficients (10% RMS gaussian) Re-calibration coefficients with Eflow method from Aurelien

Calibration blind test : Ecal Dead channels

Calibration blind test : Hcal Distribution of miscalibation coefficients (10% RMS gaussian) Re-calibration coefficients with Eflow method from Aurelien

Calibration blind test : Hcal

Calibration blind test : Prs Distribution of miscalibation coefficients (10% RMS gaussian) Re-calibration coefficients with Eflow method from Aurelien

Calibration blind test : Prs

Miscalibration exercise : what next Eflow method provides O(5%) calibration as expected (incl. some bias) Huge sample of ‘correctly) miscalibrated data is about to be produced To be used to setup/exercise ‘fine calibration’ procedure (pi0, e/p) Applying same miscalibration coefficients in Boole as used for MDF reprocessing and used by Eflow tests No re-calibration applied in Brunel Will add Aurélien calibration coefficients in condition DataBase can be used to start ‘fine calibration’ from Eflow-pre-calibrated data just need to re-run Brunel step with the wanted re-calibration condDB tag default tag : no re-calibration  start from 10% gaussian miscalibration recalib tag : Eflow calibration applied  start from O(5%) miscalibration software for Eflow histo. production+ automatic analysis available in Orwell v1r8 Could run in the monitoring farm or Data Quality stream Sergey’ proposal for ‘sliding analysis’ : continuously run over the N previous datasets to have enough statistics (e.g. over the last 24h -> 4M evts if 50Hz data in MF) Scripts and code configuration to be setup

Other issues Orwell v1r8 available in LHCbRelease development version Orwell v1r9 about to be activated at pit Implementing python configurable in Calo reco software (thanks to Vanya) in CaloReco, CaloPIDs, CaloMoniDst and CaloAssociators packages Easier to configure multi-purpose reco sequences (offline, Hlt, Hlt-topo, …) Manage the configuration of the dataOnDemand for all calo object (used in DaVinci) being validated – should be used for next Brunel version Brief introduction of calo configurable concept during next software week Vanya is developping calibration tools based on this configurables (see Victor talk) Integrate software to perform Photon/Electron correction (E/S/L-corrections) Provide correction parameters (to be included in condition DataBase) Using MC truth or tracked electron include some monitoring (S-shaping, … ) More news in next meeting New tools in preparation to manage MC association calo reconstructed object generic DaVinci association tools have some problems with calo particles specific use-case-dependent patches exist here and there the new generic tool should help

Conclusion Automatic analysis of Calibration Farm histograms commissioned ready to have a first version in operation at pit Still a lot to do / to complete the procedur’. / Volunteers needed. / Absolute calibration from physics data Blind test of the Eflow method -> O(5%) calibration large miscalibrated sample about to be produced to check fine calibration methods

(plots done on 100 minbias DIGI events) L0Calo2CaloTool (1/2) (D. Golubkov) Timing vs level IL0Calo2Calo: a simple tool to get a list of CaloClusters (owned by TES) in the vicinity of the input L0CaloCandidate(s) or CaloCellID(s). Basically, just invokes decoding of the corresponding Tell1s and clusterization with help of CaloDataProvider and CaloClusterizationTool (recently adapted for that purpose by Olivier and Victor). Level (“neighbour level”): the size of the clusterized region in Calo cells. For an L0CaloCandidate (2x2 region) Level = 0 => 2x2 cells, Level = 1 => 3x3 cells, etc. A good value for the Level parameter might be ~2 (see next slide).

=> The full efficiency for finding the cluster seems to be achieved at Level=~2 Selection: E>100 MeV, Et>100MeV (suppress “zeroes”), XY distance between the CaloCluster and center of the L0CaloCandidate dR<10cm. E CaloCluster – E L0CaloCandidate Number of CaloClusters per L0CaloCandidate L0Calo2CaloTool (2/2) Level = 0Level = 2Level = 4 + decode full Ecal