MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.

Slides:



Advertisements
Similar presentations
Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
Advertisements

Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Design pressure issues of Super-FRS dipole CrYogenic Department in Common System (CSCY), GSI, Darmstadt Yu Xiang, Hans Mueller* * Primay Beam Magnet Technology.
ESS Cryogenic System Design
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
ITER Cryoplant System Status
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
Internal review of superconductors and magnet laboratories 2nd part: Infrastructure/Laboratories Cryogenics Klaus Barth (CERN), Vladislav Benda (CERN)
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
N.Delruelle (CERN)31-May-2007 Cryogenics for ATLAS and CMS Experimets N. Delruelle on behalf of AT-ECR group.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
Review of the Tests of Superconducting Magnets in SM18 14 th January 2005 Review of the Cryogenic Infrastructure in SM18 Bruno Vullierme ACR-MT.
Subjects for SC FF magnet system at ATF2 Infrastructures at ATF2? How supply cryogen at ATF2 (set up cryogenic system?) (Gas helium recovery line?) Set.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
Performance analysis of cryogenic system and cryomodules for the complete superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
AT-ACR B. VULLIERMECSOC Meeting 29 September Cryogenics for LHC Test Benches Safety Aspects Overview of the Test Station Overview of the Operation.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Crab cavities – cryogenics for SPS and LHC LHC-CC13, 6 th LHC Crab Cavity Workshop – CERN, Geneva, Switzerland 9-11 December 2013 K. Brodzinski on behalf.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
L Design and Optimization of Helium Liquefaction System with Targeted Capacity of 50 lph without LN2 T Maiti, S Pal, A Mukherjee, U Panda Variable Energy.
CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics.
A. Perin, TE/CRG, Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi,
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
Crab Cavities SPS cryogenics – progress and requirements Fermilab visit at CERN 02 August 2013 Krzysztof Brodzinski (on behalf of CERN cryogenic team)
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
Internal review of superconductors and magnet laboratories 2nd part: SM 18 & b.163: current status, weak points, possible improvement Cryogenics Vladislav.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Final Design Cryogenic and mechanical configurations
How Does HNOSS Operate? Rocío Santiago Kern 20th May 2016.
Magnet cryogenic system update.
He Plant, LN2 Systems and Commissioing
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
M Chorowski, H Correia Rodrigues, D Delikaris, P Duda, C Haberstroh,
IT-4189 Supply and installation of a cryogenic distribution system
Cryogenic behavior of the cryogenic system
Cryoplant Installation Scope
SPS cryogenic proximity equipment and SM18 validation
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
CRYOGENICS OPERATIONS 2008 Organized by CERN
Status of the cryogenic system for B180
ESS Target Cryogenic System European Cryogenic Days CERN
Block 4 and Cluster D - Safety
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
ILC Experimental Hall Cryogenics An Overview
ESR 2 Presented to Joint Hall A/C Summer Meeting
Cryogenics – The Basics
Design of the cryogenic system of the CBM magnet
Cryogenic behavior of the magnet
ESR2 Process Cycle Design
Cryogenics – The Basics
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
ESR2 Process Cycle Design
Presentation transcript:

MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m 3 DEWAR LN 2 50m 3 COLD BOX FAIR Concept Layout

Layout: all operating modes

Layout: Precool #2

Layout: Warmup #1

Main requirements for cryogenic design ParametersGSI spec.CERN design proposal Note Cool-down speed 300K - 80K [K/h] With pre-cooler, average 1.8 Cool-down speed 80K – 5K [K/h] g/s of LHe Filling 4 g/s of LHe LHe evaporation [h]-8.5Considering EH of 100W in a magnet Warm-up speed 5K – 80K [K/h] h, with pre-cooler Warm-up speed 80K – 300K [K/h]11.7 – 3With pre-cooler, average 1.8 Maximum dT on the magnet [K]50 Maximum flow precool/warmup [g/s] -50Magnet and shield circuit Maximum magnet heat in-leak [W] dynamic 10’ Maximum CLs gas flow [g/s]1.6 Maximum LHe volume of a magnet [l]1350 Maximum mass of a cold-mass [t]45 Design pressure [b]20 Max pressure drop [b]1.3 / ? /?5/1/0.3Pre-cooler/SCHe/LHe Working temperature [K]-4.5 ± 0.1Saturated P=1.3 b± 0.1 b LHe level stability [mm]-±10 6

Cryogenic equipment and their preliminary parameters to achieve the requested cryogenic testing requirements Existing equipment, instrumentation to be refurbished – Cold box 6 g/s of LHe (power can be increased by LN boosting) – Distribution Valve Box (DVB) – 9 kW pre-cooler including 50 g/s compressor – GHe buffer, 3 x 80 m 3 for 5 m 3 of LHe, design pressure to be checked New equipment required – Compressor station for cold box, m=165 g/s at 20 b – Dryer/purifier (cold box/pre-cooler) – 10 kW pre-cooler including 15 kW heater inclusive of compressor station 50 g/s including buffer – Satellite 15 kW heater to implemented to the existing 10 (9) kW pre-cooler – 3 satellite valve boxes (SVB) including instrumentation – 3 cryogenic lines between the distribution valve box and satellite valve boxes – 4 cryogenic lines between two pre-coolers and 3 satellite valve boxes (including 10 valves, 2+6+2, integrated in SVB) – LHe dewar, V min = 5 m 3 of LHe (opinion) – LN tank, 50 m 3 – Cryogenic infrastructure Purge system for magnet helium circuits Pumping system for insulation vacuum Leak detectors Gas analyzer system Cold and warm pipework including supports Control system including PC, cables and power distribution

Main parameters for the precoolers ParametersGSI spec.CERN design proposal Note Cool-down speed 300K - 80K [K/h] With pre-cooler, average 1.8 Cool-down speed 80K – 5K [K/h] g/s of LHe Warm-up speed 5K – 80K [K/h] h, with pre-cooler Warm-up speed 80K – 300K [K/h]11.7 – 3With pre-cooler, average 1.8 Maximum dT on the magnet [K]50 Maximum flow precool/warmup [g/s] -50Magnet and shield circuit Max pressure drop [bar]1.3 / ? /?5/1/0.3Pre-cooler/SCHe/LHe Feed pressure to magnets [bar]10 Return pressure to compressor [bar]5 Heater power [kW]15 8 Function: warmup one magnet while also precooling one magnet Two precoolers: one existing with additional heater + one new