Proposal of a digital-analog RPC front-end for synchronous density particle measure for DHCAL application R.Cardarelli and R.Santonico INFN and University.

Slides:



Advertisements
Similar presentations
Electronics for large LAr TPC’s F. Pietropaolo (ICARUS Collaboration) CRYODET Workshop LNGS, March 2006.
Advertisements

SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
1 VCI, Werner Riegler RPCs and Wire Chambers for the LHCb Muon System  Overview  Principles  Performance Comparison: Timing, Efficiency,
24-28 May, 2010 S. Mastroianni - 17th Real-Time Conference, Lisboa, Portugal ARGO-YBJ is a cosmic ray air shower detector based on a single layer of RPC.
SiLC Front-End Electronics LPNHE Paris March 15 th 2004.
Investigation for Readout Electronics of WAC in LHAASO Shubin Liu University of Science & Technology of China April 22nd, 2009.
E. Norbeck U. IowaFast Gas Detector APR 05 Tampa1 Small Fast Gas Detector for High-Energy Electrons E. Norbeck, J.E. Olson, and Y. Onel University of Iowa.
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
A new generation of RPCs to be tested for the super- LHC CERN GIF workshop 20/06/2011 G. Aielli.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
CMS-GRPC status Imad Laktineh for the GRPC-CMS groups.
1 New TOT design for the LAV F.E. electronics M. Raggi, P. Valente G. Corradi, D. Tagnani LNF electronic service TDAQ Working Group 29/05/2009.
Using delay lines on a test station for the Muon Chambers Design considerations (A. F. Barbosa, Jul/2003)
Development of the Readout ASIC for Muon Chambers E. Atkin, I. Bulbalkov, A. Voronin, V. Ivanov, P. Ivanov, E. Malankin, D. Normanov, V. Samsonov, V. Shumikhin,
XXXI International Cosmic Ray Conference, ICRC 2009 Lodz, Poland, July 7-15, 2009 Time structure of the Extensive Air Shower front with the ARGO-YBJ experiment.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
Hadronic interaction studies with the ARGO-YBJ experiment (5,800 m 2 ) 10 Pads (56 x 62 cm 2 ) for each RPC 8 Strips (6.5 x 62 cm 2 ) for each Pad ( 
ArgoYBJ: further steps for the next thfuture WAPP 2009 Bose Institute, Mayapuri, Darjeeling Dec 12 th 2009 By R. Santonico.
Tests of RPCs (Resistive Plate Chambers) for the ARGO experiment at YBJ G. Aielli¹, P.Camarri¹, R. Cardarelli¹, M. Civardi², L. Di Stante¹, B. Liberti¹,
EAS Time Structures with ARGO-YBJ experiment 1 - INFN-CNAF, Bologna, Italy 2 - Università del Salento and INFN Lecce, Italy A.K Calabrese Melcarne 1, G.Marsella.
Temporal and spatial structure of the Extensive Air Shower front with the ARGO- YBJ experiment 1 - INFN-CNAF, Bologna, Italy 2 - Università del Salento.
Meeting from Mai 10th at ETHZ ArgonTube electronics Charge amplifier or linear amplifer ? Front end module Max Hess.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
A Hadron Calorimeter with Resistive Plate Chambers José Repond Argonne National Laboratory CALOR 2006, Chicago, June 5 – 9, 2006.
The Prototype Simulation of SDHCAL Ran.Han Gerald.Grenier Muriel.Donckt IPNL.
Study of gas mixture containing SF6 for the OPERA RPCs A.Paoloni, A. Mengucci (LNF)
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
An INTRODUCTION to RPC2016 Het Pand Gent 22 Feb 2016 By R. Santonico.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
RPCs with Ar-CO2 mix G. Aielli; R.Cardarelli; A. Zerbini For the ATLAS ROMA2 group.
Overview of TPC Front-end electronics I.Konorov Outline:  TPC prototype development  Readout scheme of the final TPC detector and further developments.
Analog Front End For outer Layers of SVT (L.4 & L.5) Team:Luca BombelliPost Doc. Bayan NasriPh.D. Student Paolo TrigilioMaster student Carlo FioriniProfessor.
Picosecond timing of high energy heavy ions with semiconductor detectors Vladimir Eremin* O. Kiselev**, I Eremin*, N. Egorov***, E.Verbitskaya* * Physical-Technical.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Status of hardware activity in CNS Taku Gunji Center for Nuclear Study University of Tokyo 1.
30th International Cosmic Ray Conference July , 2007, Merida, Yucatan, Mexico Performance of the 1.5 × 10 5 front-end electronics channel of the.
Measurement of the CR light component primary spectrum B. Panico on behalf of ARGO-YBJ collaboration University Rome Tor Vergata INFN, Rome Tor Vergata.
Performance of the PHENIX NCC Prototype Michael Merkin Skobeltyn Institute of Nuclear Physics Moscow State University.
W-DHCAL Digitization T. Frisson, C. Grefe (CERN) CALICE Collaboration Meeting at Argonne.
A high rate fast precision tracking trigger with RPCs
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
KLOE II Inner Tracker FEE
Journées VLSI-FPGA-PCB Juin 2010 Xiaochao Fang
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
A General Purpose Charge Readout Chip for TPC Applications
Results achieved so far to improve the RPC rate capability
Surface Concept Position Sensitive MCP Detectors Novel Solutions A
Radiation Monitor: Concepts, Simulation for an Advanced Read Out
DHCAL TECH PROTO READOUT PROPOSAL
Institute of High Energy Physics, CAS
DCH FEE 28 chs DCH prototype FEE &
University and INFN of Naples
L. Ratti, M. Manghisoni Università degli Studi di Pavia INFN Pavia
Front-end electronics Bis7-8
The Monitoring System of the ARGO-YBJ Data Acquisition
Ideas and opportunities for a 2nd generation detector
TDC at OMEGA I will talk about SPACIROC asic
RPC Front-end development
A Low Power Readout ASIC for Time Projection Chambers in 65nm CMOS
A Fast Binary Front - End using a Novel Current-Mode Technique
Phase shifter design for Macro Pixel ASIC
ECAL Electronics Status
X. Zhu1, 3, Z. Deng1, 3, A. Lan2, X. Sun2, Y. Liu1, 3, Y. Shao2
Pre-installation Tests of the LHCb Muon Chambers
RPC Front End Electronics
Presentation transcript:

Proposal of a digital-analog RPC front-end for synchronous density particle measure for DHCAL application R.Cardarelli and R.Santonico INFN and University of Rome Tor Vergata

.

Starting from the Argo experience: digital vs analog read out

BTF (LNF)of a RPC working in streamer mode Moto Giovane SRL

Extrapolation to the avalanche mode 2* 10 5 /m 2 30 pC charge delivered in the gas per mip 2*10 4 /m 2 Particle density up to particle density up to 300 pC charge delivered in the gas in per mip streamer mode avalanche mode

Pad feature Pad 100pF. 300 mm 30 pC for a single mip 0.3mC for mips (10mips/cm 2 ) 1pC 10uC Total charge delivered in the RPC gas Prompt charge induced in the pad

Simulation of the front-end electronics for an input amplitude in the range 1pC - 10nC Out amplifier pulse Pad capacitance 10pF Prompt charge pulse of the RPC

Simulated pad signal 350uV 4 V mips mips

Simulated output amplifier mips 1 mip

Detail of the simulated out amplifier pulse for mips to mips mips mips Time of threshold

Time of threshold v.s. pad signal charge Logarithmic part Parabolic part

Fit of the time of threshold v.s. pad charge ns pC

Time resolution at high desity of particles

Time resolution of RPC for n synchronous particle

RPC DHCAL layout RPC pad iron

Tentative readout scheme of the experiment 30 x 30mm 2 module pad module cluster C=1pF FPGA Front-end 16 ch +analog or Optical link 6 Gbit/sec Maximum readout time 500 ns 7.5 mm

Circuit of the proposed front end IN 1 IN 16 Digital out Discr /02/2015 Discr. Tdc time over th Digital out

FPGA function. in1 in2 in10 TDC 1 TDC2 TDC10 Optical link Trigger in Data ouput in1 in2 in10 Digital in 1 Digital in 2 Digital in 10

Front-end Front end connection to the FPGA We choose single ended LV TTL logic for the connection between FE and FPGA The motivation is: Minimize the driver consumption (benefits both FE and FPGA) Simple and robust against noise 04/02/2015R. Cardarelli, SSC Pull up resistor +3V FPGA Open collector TTL Transmission line GND

Conclusions We have shown the tentative scheme of digital-analog readout for DHCAL The front-end electronics simulation shows that a dynamic factor of is feasible This simulation shows also that a 20 ps time resolution with 2 mm gas gap is possible with high multiplicity. Nevertheless the same front end electronics can be optimize for DHCAL application

Backup slides

Tentative carpet structure 300 x 300 mm 2 pad module cluster carpet C=100 pF

Improving the Argo analog read out The Argo results suggest that the Argo approach can be improved up to the limit of fully switching from the digital to the analog read out Requirements Small size squared read-out pads instead of strips New front end electronics to fully exploit the extremely wide amplitude range of the detector: a factor of about required eg for 30x30 cm2 pads Full sensitivity for a single mip Advantages Trigger threshold based on the total amplitude instead of the number of firing pads Low multiplicity trigger preserved by the front end sensitivity to mip Possibility to study the core/multicore shower structure in the range from low energies up to 100 PeV Possibility to study, even at low energy, events releasing a large amplitude in a single pad (small showers, end range protons…)

Particle density v.s. distance of the shower core for different energies ARGO ybj

Tentative readout scheme of the experiment 300 x 300mm 2 module pad module cluster C=100pF FPGA Front-end 4 ch Optical link 6 Gbit/sec Maximum readout time 500 ns

Skeme of the proposed front end IN 1 IN 4 Digital out Discr. 3204/02/2015