14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.

Slides:



Advertisements
Similar presentations
Topics to be Covered 1. Capacity Planning
Advertisements

Aggregate / Production Planning
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
BUAD306 Aggregate Planning. Determines the resource capacity needed to meet demand over an intermediate time horizon Typically months in duration.
IES 371 Engineering Management Chapter 14: Aggregate Planning
Chapter 12 Aggregate Planning.
PRODUCTION AND OPERATIONS MANAGEMENT
Operations Management
Aggregate Planning.
Ardavan Asef-Vaziri Systems and Operations Management
WEEK 11A – [S&OP] AGGREGATE PLANNING (CHAPTER 13) Planning levels (long, intermediate and short ranges and real time control); Planning & Control Model;
1 Introduction to Operations Management Aggregate Planning CHAPTE R 12.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Aggregate Planning Operations.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
Chapter 5 Aggregate Planning Operations Analysis Using MS Excel.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Chapter 14 Aggregate Sales and Operations Planning.
Utdallas.edu/~metin 1 Aggregate Planning Chapter 12.
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
Aggregate Planning and Master Scheduling
Aggregate Planning and Master Scheduling
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operations Planning Operations Management - 6 th Edition.
Ardavan Asef-Vaziri Systems and Operations Management
© 1997 Prentice-Hall, Inc Principles of Operations Management Aggregate Scheduling Chapter 12.
Lesson 16 Aggregate Planning
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
CHAPTER 3 AGGREGATE PLANNING. LEARNING OBJECTIVES Define aggregate planning and how it is useful Identify optional strategies for developing an aggregate.
Aggregate Planning.
AGGREGATE PLANNING Rachmat A. Anggara 9th of April 2010.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Operations Management Aggregate Planning
Aggregate Planning Chapter 11.
© The McGraw-Hill Companies, Inc., DOM 511: Operations Mgt Practice Aggregate Planning.
 The McGraw-Hill Companies, Inc Irwin/McGraw-Hill 1 Facilities and Aggregate Planning Chapter 12 Due Date!
Operations Management For Competitive Advantage 1 Aggregate Planning Operations Management For Competitive Advantage Chapter 12.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
Operations Fall 2015 Bruce Duggan Providence University College.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Aggregate Planning. Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering 6 to 18 months. Short range Intermediate.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Aggregate Planning Intermediate-range capacity planning that typically covers a time horizon of 2~12 months – may extend to as much as 18 months. Product.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Management
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
© The McGraw-Hill Companies, Inc., OUTPUT PLANNING PROCESS Aggregate Planning.
Sales and Operations Planning
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
Chapter 14 Aggregate Planning.
BUAD306 Aggregate Planning.
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
13 Aggregate Planning.
Dr Sh Salleh bin Sh Ahmad
Production and Operations Management
Aggregate Production Planning (APP)
Presentation transcript:

14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning

14-2 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Chapter 14

14-3 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering 2 to 12 months. Short range Intermediate range Long range Now2 months1 Year

14-4 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Short-range plans (Detailed plans) –Machine loading –Job assignments Intermediate plans (General levels) –Employment –Output Long-range plans –Long term capacity –Location / layout Overview of Planning Levels

14-5 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Planning Sequence Corporate strategies and policies Economic, competitive, and political conditions Aggregate demand forecasts Business Plan Production plan Master schedule Establishes production and capacity strategies Establishes production capacity Establishes schedules for specific products

14-6 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Resources –Workforce –Facilities Demand forecast Policy statements –Subcontracting –Overtime –Inventory levels –Back orders Costs –Inventory carrying –Back orders –Hiring/firing –Overtime –Inventory changes –subcontracting Aggregate Planning Inputs

14-7 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Total cost of a plan Projected levels of inventory –Inventory –Output –Employment –Subcontracting –Backordering Aggregate Planning Outputs

14-8 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Pricing Promotion Back orders New demand Demand Options

14-9 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Hire and layoff workers Overtime/slack time Part-time workers Inventories Subcontracting Capacity Options

14-10 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Aggregate Planning Strategies Maintain a level workforce Maintain a steady output rate Match demand period by period Use a combination of decision variables

14-11 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Basic Strategies Level capacity: –Maintaining a steady rate of regular-time output while meeting variations in demand by a combination of options. Chase demand: –Matching capacity to demand; the planned output for a period is the expected demand for that period.

14-12 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Determine demand for each period Determine capacities for each period Identify policies that are pertinent Determine units costs Develop alternative plans and costs Select the best plan that satisfies objectives Techniques for Aggregate Planning

14-13 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Cumulative Graph Cumulative production Cumulative demand Cumulative output/demand Figure 14-3

14-14 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Average Inventory Average inventory Beginning Inventory + Ending Inventory 2 =

14-15 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Mathematical Techniques Linear programming: Methods for obtaining optimal solutions to problems involving allocation of scarce resources in terms of cost minimization. Linear decision rule: Optimizing technique that seeks to minimize combined costs, using a set of cost-approximating functions to obtain a single quadratic equation.

14-16 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Summary of Planning Techniques

14-17 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Services occur when they are rendered Demand for service can be difficult to predict Capacity availability can be difficult to predict Labour flexibility can be an advantage in services Aggregate Planning in Services

14-18 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Master schedule: The result of disaggregating an aggregate plan; shows quantity and timing of specific end items for a scheduled horizon. Rough-cut capacity planning: Approximate balancing of capacity and demand to test the feasibility of a master schedule. Disaggregating

14-19 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Master Scheduling Process Master Scheduling Beginning inventory Forecast Customer orders Inputs Outputs Projected inventory Master production schedule Uncommitted inventory Figure 14-5

14-20 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Projected On-hand Inventory Beginning Inventory Customer orders are larger than forecast in week 1 Forecast is larger than Customer orders in week 2 Forecast is larger than Customer orders in week 3 Figure 14-8

14-21 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Time Fences in MPS Period frozenfirmfullopen Figure

14-22 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Planning Solved Problems: Problem 1