Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Critical Components July 26, 2012 John Carrigan MassDEP Northeast Regional Office.

Slides:



Advertisements
Similar presentations
Guidance Notes on Safe Health Facilities Sanjaya Bhatia Focal Point Disaster Resilient Schools & Hospitals.
Advertisements

Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
Certification of Compliance By Evita Lagard
ENVIRONMENTAL MONITORING AT SOLID WASTE (SW) LANDFILLS QUIZ Ruxandra Floroiu, Environmental Engineer, ECSSD WB Safeguards Workshop Chisinau, Moldova October.
Role of Activity & Use Limitations in Clean Energy Development at Disposal Sites Elizabeth Callahan Acting Division Director, Policy and Program Planning,
 ideally the disposal methods should meet the following condition:  environment friendly  cause no health hazard  economically less demanding  maximum.
NC SWANA FALL 2014 MEETING Presented by Ed Mussler P.E., Wilmington, NC October 2014 DWM Post-Closure Landfill Use Concepts and Considerations.
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
Promoting Renewable Energy Development on Closed MA Landfills Sarah Weinstein, Massachusetts Department of Environmental Protection, AEHS Foundation, UMass.
“Landfill Final Cover Stormwater Drainage” Mark A. Taylor, PE EcoLogic Associates, P.C.
CE 326 Principles of Environmental Engineering Prof. Tim Ellis February 4, 2008 Municipal Solid Wastes
EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
Stormwater 101: How to stay out of trouble with TDEC.
Air Pollutant Watch List (APWL) Darrell D. McCant, B.S. Chief Engineer’s Office - Toxicology Section Texas Commission on Environmental Quality.
Upper Providence Township Stormwater Management MS4 Program.
PUBLIC INFORMATION SESSION: Old Fall River Road Landfill Dartmouth, MA Massachusetts Unlined Landfill Closure Policy March 28, 2013 Mark Dakers, Acting.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
L-THIA Long-Term Hydrologic Impact Assessment Model ….provides relative estimates of change of runoff and non point source pollutants caused due to land.
G3 – Environmental Geomechanics (Dr Sam Yuen)
6:00 ­- 6:30 p.m.Poster board display 6:30 - 6:40 p.m.Open Meeting/Introductions Ellie Donovan, MassDEP, Facilitator 6:40 - 6:45 p.m.Opening Remarks Michelle.
SUSTAINABLE ROOFING ENVIRONMENT ENERGY DURABILITY ACCOUNTABILITY The ROOFLIFE Sustainable Roofing Decision Model:
January Goals: Streamline permitting process for certain solid waste facilities and activities Expand use of 3 rd party inspectors to allow MassDEP.
Fourth Meeting June 26, 2012 "The Cleaner Greener Lincoln initiative will make the City of Lincoln an active leader in the area of sustainability, building.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
Module 7: Construction Phase
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
Solar PV on a Capped Municipal Landfill Ellen E. Ebner, Tighe & Bond 7/26/2012.
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
20 – Operation and Maintenance 1/45 “There is no sensible reason to design and prepare for a better engineered landfill if it is not operated in a better.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Fort Ord, Monterey County, California History and Closure of a Landfill on a former Military Installation and Current Superfund Site Derek S. Lieberman,
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
EU Legislation in the field of environment – key developments in 2007 and rd ECENA Plenary Meeting 18 September 2008.
MUNISPORT LANDFILL Vijay Kumar Rayabharapu. Munisport Landfill (Biscayne Landings) Landfill N N.E. 151st St., Biscayne Blvd ) Florida International University.
Bioreactors Landfills
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines June 17, 2009 Mark Dakers, Environmental Analyst Massachusetts.
Cal/EPA Building Room 550 Financial Assurances Phase II Informal Rulemaking Group Meeting May 12, :00 am to 12:00 pm Financial Assurances Phase II.
Landfill Closure Issues. Stormwater Retention  Florida Regulations - –must collect and detain runoff from first 1” of rainfall (for > 100 acres, 0.5”
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
Renewable Energy Facilities at Closed Landfills Siting and Installation Considerations January 19, 2010 Briony Angus, AICP Dana Huff, P.E. Tighe & Bond,
Lynne Welsh Massachusetts Department of Environmental Protection.
© Module 4—Hazard Prevention and Control Safety Management Worksite Analysis Management Commitment and Employee Involvement Hazard Prevention and.
1 Bioreactor Landfill Operations Regulatory Perspective Considerations ASTSWMO Conference July 23, 2003 Scott Walker, PE, CEG California EPA Integrated.
Integrated Stormwater Monitoring associated with the 2011 Las Conchas Fire.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Discussion And Request For Direction Relative To Strategic Directive 8.3 Regulation Reviews For Alternative Daily Cover And Food/Green Waste Composting.
Update On Landfill Long-Term Financial Assurances Activities For Postclosure Maintenance And Corrective Action.
Landfill Closure SWANA November 2015.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.
May 11-13, 2005CIWMB/LEA Conference1 Closure & Postclosure Maintenance Plans What You Need To Know or Secrets Revealed.
December 6, 2004CIWMB P&E Committee Workshop1 Postclosure Maintenance Postclosure Maintenance Beyond the Initial 30 Years and Financial Assurance Demonstrations.
Cal/EPA Building Room 550 Postclosure Maintenance Workshop March 10, :00 am to 12:00 pm Postclosure Maintenance Workshop March 10, :00 am to.
Systems mitigate risks Risks not eliminated Public Works: Prepared Annual valve testing Ongoing dam infrastructure improvement program.
Yolo County Planning, Resources and Public Works Department 1 Landfill-based Anaerobic Digestion Compost Pilot project at Yolo County Central Landfill.
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
Rutgers, The State University of New Jersey Recommendations From the New Jersey Climate Adaptation Alliance Marjorie B. Kaplan, Associate Director Rutgers.
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
Conceptual Approaches for Short- and Long- Term Erosion and Sediment Control Big River State Park At Big River State Park, DPR and the State of California.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
Mandatory Requirements of Ecological Solid Waste Management Act (RA 9003) on CLOSURE AND REHABILITATION OF DUMPSITES.
New Life for Landfills One Man’s Trash Another Man’s Treasure.
Results of the Review of MSW Landfill Regulations from Selected States and Countries Landfill Facility Compliance Study presented to California Integrated.
ENGINEERING CHALLENGES OF SITING RENEWABLE ENERGY AT LANDFILLS Ronald Johnson, PE, GE Brownfields Conference 2011 Philadelphia, PA April 5,
Long-Term Care After 30-Year Post-Closure Period
Land Use and Zoning Committee Special Workshop
Scientific or Engineered Landfilling of Waste
Presentation transcript:

Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Critical Components July 26, 2012 John Carrigan MassDEP Northeast Regional Office

Critical Application Components What the DEP permit reviewer will be most focused on: Foundations Storm Water Controls Long-Term Maintenance

Foundations Must not compromise the function and integrity of the landfill cap/final cover system: Keep water out, Management of storm water runoff, and Keep landfill gas in. Must be structurally stable and accommodate loading/settlement.

Landfill Gas Control and Monitoring Plan Address Impact of Facility Design on Landfill Gas Controls and of Landfill Gas on the Facility Design criteria Public Health (toxic compounds in ambient) Safety (explosion, fire, asphyxiation) Welfare (nuisance odors) Landfill Gas Control and Risk Reduction Methods Engineering Management controls Monitoring

Geotechnical Analysis – Settlement & Stability Demonstrate No Adverse Impact to Final Cover and Design is Structurally Stable Site/Design Specific Geotechnical/Stability Analysis Pre and Post Construction Monitoring

Stormwater Controls Consider: the foundation design and density of development. location and orientation of power lines from development. Will these factors concentrate runoff and erosion potential or create water bars? Design for the 24-hour, 25 year storm event. Evaluate flooding potential from the 24- hour, 100 year storm event.

Long-Term Maintenance Maintenance ensures the continued functionality of the cap/final cover system and all of its components. Designed well: Maintenance should be minimal. Designed poorly: may need efforts to address instability, frequent erosion/cap repairs, and/or labor intensive vegetation control.

Post Closure Monitoring & Maintenance Plan Inspections professional engineer or qualified professional problems noted & scheduled for follow-up attention Routine Monitoring and Repairs mowing, removing brush and trees, reseeding storm water landfill gas collection system leachate collection system environmental monitoring system Post Closure Monitoring evaluate effectiveness of final cover system post closure use areas

IT’S NOT ROCKET SCIENCE Design Considerations Impact of the Facility on the Landfill Integrity and Function of the Cap, Landfill Gas and Storm Waster Controls Impact of the Landfill on the Facility Post-Closure Operation, Monitoring, and Maintenance of the Landfill including the Facility