1 HLT (confirmation, generic)  Idea Reconstruct only a fraction tracks In hand:  better PT estimation  signal (secondary) vertices  Data TDR DaVinci.

Slides:



Advertisements
Similar presentations
STAR Status of J/  Trigger Simulations for d+Au Running Trigger Board Meeting Dec5, 2002 MC & TU.
Advertisements

H/Abb -> 4b’s process & Multi-Et-Threshold Study for 4jet Trigger Kohei Yorita Young-Kee Kim University of the FTK Meeting on July 13 th, 2006.
More on making fake TT clusters More creating Fake TT clusters We can compute the number of combinations instead of the purity (following all the possible.
Test Beam 2003 Some Preliminary Results CMS Week Sep-2003.
B triggering Fabrizio Palla INFN Pisa Consorzio CMS Italia Firenze 7 Sept
Muon Identification Antoine Cazes Laboratoire de l’ Accelerateur Lineaire OPERA Collaboration Meeting in Frascatti Physics coordination meeting. October.
27 th June 2008Johannes Albrecht, BEACH 2008 Johannes Albrecht Physikalisches Institut Universität Heidelberg on behalf of the LHCb Collaboration The LHCb.
Emulsion scanning: present status and plans for the coming run Giovanni De Lellis.
Report of the Oscillation Working Group and status of Charm study 1 F. Juget – D. Duchesneau Ankara, April 1rst 2009.
A Method to measure  + /   detection efficiency asymmetry at LHCb Liming Zhang 08/15/07.
In order to acquire the full physics potential of the LHC, the ATLAS electromagnetic calorimeter must be able to efficiently identify photons and electrons.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
1 T1-T3 in L1 algorithm  Idea (F. Teubert) Use extra tracking information to measure the large Pt that triggers the event (L1, HLT). Based in the fact.
Tracking at LHCb Introduction: Tracking Performance at LHCb Kalman Filter Technique Speed Optimization Status & Plans.
Preliminary Study of CC-Inclusive Events in the P0D using Global Reconstruction Rajarshi Das (w/ Walter Toki) Nu-Mu Prelim. Meeting Dec 2010 CSU.
April 21st 2010Jacques Lefrancois1 UPGRADE NEWS Scope of upgrade presented by Andrei in upgrade meeting April 16th Role of trigger presented by Hans in.
Darren Price – HLT B-trigger offline status report :: B-Physics meeting July 23 rd ‘08Page 1 HLT B-trigger offline monitoring status Darren Price, LANCASTER.
A statistical test for point source searches - Aart Heijboer - AWG - Cern june 2002 A statistical test for point source searches Aart Heijboer contents:
August 30, 2006 CAT physics meeting Calibration of b-tagging at Tevatron 1. A Secondary Vertex Tagger 2. Primary and secondary vertex reconstruction 3.
Selection cuts on Bs→ with FTK F. Crescioli, P. Giannetti, M. Dell'Orso, G. Punzi, G. Volpi 2/5/2006.
Prompt J/  and b ➝ J/  X production in pp collisions at LHCb Patrick Robbe, LAL Orsay & CERN, 7 Dec 2010 For the LHCb Collaboration KRUGER 2010 Workshop.
1 T1-T3 in L1 algorithm  Outlook: I) Summary of L1-confirmation II) About the TrgForwardTracking package III) Confirming (preliminary)  L1-confirmation.
K charged meeting 10/11/03 K tracking efficiency & geometrical acceptance :  K (p K,  K )  We use the tag in the handle emisphere to have in the signal.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
25 sep Reconstruction and Identification of Hadronic Decays of Taus using the CMS Detector Michele Pioppi – CERN On behalf.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
ALICE Offline Week, CERN, Andrea Dainese 1 Primary vertex with TPC-only tracks Andrea Dainese INFN Legnaro Motivation: TPC stand-alone analyses.
B-Tagging Algorithms for CMS Physics
Study of exclusive radiative B decays with LHCb Galina Pakhlova, (ITEP, Moscow) for LHCb collaboration Advanced Study Institute “Physics at LHC”, LHC Praha-2003,
Marcel Vreeswijk (NIKHEF) B tagging, performance vertexing Neural Net studies tt event selection mass reconstruction in tt events conclusions B tagging.
Barbara Sciascia July,29 th - LNF 1 Barbara Sciascia K  semileptonic decays Charged Kaon Meeting July, 29 th - LNF Single photon efficiency in KPM events.
CALOR April Algorithms for the DØ Calorimeter Sophie Trincaz-Duvoid LPNHE – PARIS VI for the DØ collaboration  Calorimeter short description.
Muon detection in NA60  Experiment setup and operation principle  Coping with background R.Shahoyan, IST (Lisbon)
CPPM (IN2P3-CNRS et Université de la Méditerranée), Marseille, France Olivier Leroy, for the Marseille group Trigger meeting, CERN19 April 2004 b-tagging.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
1 Constraining ME Flux Using ν + e Elastic Scattering Wenting Tan Hampton University Jaewon Park University of Rochester.
General requirements for BES III offline & EF selection software Weidong Li.
Search for High-Mass Resonances in e + e - Jia Liu Madelyne Greene, Lana Muniz, Jane Nachtman Goal for the summer Searching for new particle Z’ --- a massive.
K 0 s reconstruction in ALICE Giuseppe Lo Re INFN, Sezione di Catania, and Dipartimento di Fisica e Astronomia, Università di Catania, Italy, March 2002.
Charged Particle Multiplicity, Michele Rosin U. WisconsinQCD Meeting May 13, M. Rosin, D. Kçira, and A. Savin University of Wisconsin L. Shcheglova.
Progress Report on GEANT Study of Containerized Detectors R. Ray 7/11/03 What’s New Since Last Time?  More detailed container description in GEANT o Slightly.
Tomas Hreus, Pascal Vanlaer Overview: K0s correction stability tests Jet-pt correction closure test Study of Strangeness Production in Underlying Event.
Heavy stable-particle production in NC DIS with the ZEUS detector Takahiro Matsumoto, KEK For the ZEUS collaboration.
Confirming L1 decision Use: DaVinci v7r4 field 043 Idea (Teubert’s) : Most of min.bias L1 possitive trigger are due to missmeasurements of Pt (P) How mutch.
July 22, 2002Brainstorming Meeting, F.Teubert L1/L2 Trigger Algorithms L1-DAQ Trigger Farms, July 22, 2002 F.Teubert on behalf of the Trigger Software.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Aug _5071 Top stop by charm channel analysis using D0 runI data OUTLINE physics process of top to stop Monte Carlo simulation for signal data.
Paolo Massarotti Kaon meeting March 2007  ±  X    X  Time measurement use neutral vertex only in order to obtain a completely independent.
Trigger Strategy and Performance of the LHCb Detector Mitesh Patel (CERN) (on behalf of the LHCb Collaboration) Thursday 7 th July 2005.
Electron and Photon HLT alley M. Witek K. Senderowska, A. Żurański.
1 HLT GENERIC SIGNAL LOSSES ANALYSIS summer internship 2004 Philippe Kobel EPFL, Lausanne, summer internship 2004.
Mark Dorman UCL/RAL MINOS WITW June 05 An Update on Using QE Events to Estimate the Neutrino Flux and Some Preliminary Data/MC Comparisons for a QE Enriched.
1 HLT (generic)  Data TDR DaVinci v9r3 DC04 DaVici v12r0 DC04 DaVici v12r1  Outlook! # of track candidates!!! Comparation DC04 & TDR data  L1 does a.
A 2 nd proposal for a Low mass electron pair trigger. Richard Seto University of CA, Riverside Trigger Working Group Meeting 6/7/2001.
H->WW->lνlν Analysis - Improvements and results - - Data and MC - Higgs Working group meeting, 6 January 2011 Magda Chełstowska & Rosemarie Aben.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
Erik Devetak Oxford University 18/09/2008
Using IP Chi-Square Probability
Searching for CHAMPs at CDF
Marco Incagli – INFN Pisa
Converted photons efficiency
Michele Pioppi* on behalf of PRIN _005 group
Reddy Pratap Gandrajula (University of Iowa) on behalf of CMS
Update on LHCb Level-1 trigger
Prospects for quarkonium studies at LHCb
Julie Kirk Rutherford Appleton Laboratory
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Missing B-tracks in L1 trigger
LHCb Trigger LHCb Trigger Outlook:
Quarkonium production, offline monitoring, alignment & calibration
Presentation transcript:

1 HLT (confirmation, generic)  Idea Reconstruct only a fraction tracks In hand:  better PT estimation  signal (secondary) vertices  Data TDR DaVinci v9r3  HLT Velo + VeloTT  TrgForward tracking  Offline vertices HLT (confirmation or generic) [1st attempt] Jose A. Hernando, Frederic Teubert (03/4/04) work in progress... This is a status report

2 HLT (confirmation, generic)  Previous results Selection of candidates  To get 2 B-tracks reconstructed abs(IP) [0.15,3] mm Secondary vertices (2 tracks)  95%,90% of the times the track with highest pt comes from the B  Use the 4 th first Pt candidates is enough  Create a 2 track vertex using this order of track by pt: [0,1][0,2][0,3][1,2][1,3][2,3] efficiency vs rejection  95% eff (Bpipi,BsDsK) 10 KHz  L1confirmation : log(pt(0))+log(pt(1)  Combine with z-distance between 2 vertices  Mass related with l1confirmation  Plans: What about other channels:  Neutrals, electrons?, muons!  We consider the bonus from L1!  Working on it…. Multi primary vertex  We discover they were a problem!  Many 2 nd verteces (signal) are from track of a second primary vertex  We made a treatment of the multi primary vertex Combining the variables  Cut (l1conf,Delta-Z) by “hand” to get eff vs rejettion  Can we combined in an “automatic” way to cut only in one variables? What is the b,c content?

3 Efficiency vs retention Z distance vs log(pt1*pt2)Eff vs retention KHz B0->  ; Bs->DsK (black) B0->  ; (white) Bs->DsK what did it happen to the bonus (10 KHz)?: we are checking it

4 Dealing with multi primary verteces  Multiple primary vertices After L1-conf the sample has a good number of 2 primary vertices! We can see it in the z-distance between the primary and the secondary  Secondary vertex made with tracks from the second primary vertex  Method to deal with multi primary vertices 1.Use off-line primary vertices 2.Associate each track to the primary vertex with smaller abs(IP) 3.Compute the # of candidates in abs(IP) window [0.15,3] mm for each vertex 4.Consider the primary the one with more candidates 5.Consider only the candidates of that primary vertex

5 Combining variables: flattening Flatting the mim bias Xflat = F(x) log(pt1*pt2) Z-distance (SV-PV)

6 The phi-angle variable: flattening cos(phi)  Phi angle: Angle in the transverse plane between:  The separation of the secondary-primary vertex  The total momentum (of the 2 tracks) in the secondary vertex  About the variables: L1-confirmation + bonus if the most powerful Z-Distance is the less powerful (still some long tail…) Phi is working good They are “quite” independent  How to combine them into one variable? Xflat = F(x) Flatting the mim bias

7 Combining flat variables  Combining flat variables: Easy to see the correlation, easy to define a cut  Mim.bias(background) space “flat” if they are independent  To make a one variable only Define the distance in that space to a point (1.,1.) dis = sqrt(x^2+y^2) And flat this variable again  Easy to add more variables Improvement: weights for variables (x/w), and center the signal (x0,y0)

8 L2 variable: efficiency, retention, c and b content  L2 trigger (“improved l1confirmation”) We need to take into account the # events with no secondary vertex (mim.bias ~15%) We maybe can go up to 8 KHz, with efficiency >90% In the “by hand” cut we will be able to get a little more efficiency  Retune and weight more l1confirmation  Generic algorithm There is a region where the l2 variable has a large (50,70) % of (b,b+c) content  How much on KHz is that?, should we keep all this events?, how much time we save?

9 Efficiency vs retetion  L2 efficiency vs rejection 8KHz with 92% efficiency (Bpipi,BsDsK), 5KHz with 90,~85% L1- more weight? Delta-Z benefices BsDsK and penalizes Bpipi, Phi benefices again Bpipi

10 Conclusions and plans  Conclusions Treatement of the multi primary vertices, seems ok A method to combine different variables  Flat variables  Distance in the flat-space Preliminary: 8 KHz, 92% eff  But… the bonus Prelimainary:  A fraction of mim.bias with 50%(70%) of b(b+c) content?  Note: We use TDR data, DaVinci v9r3 We use tracking TrgForward (HLT) We use Offline vertices!  Plans More statistics The other channels (neutrals,e,mus) How many c/b we have after?  Do we have a generic algorithm? Revisit-tune the flat variable method  To Play We do the full analysis in python We have a data in python We have developed a python module  (HIPYS similar to PAW) It is really SIMPLE and FAST to work with python!!!!

11 HIPYS  Python is a great language… to make analysis Python (clay), C++ (stone)  Python is: An scrip and a OO lenguage Dynamically typed Interpreted (interactive) Has heterogeneous container Has solved the persistency:  But.. The I/O is slow  So intuitive to use  To make the flat variables: No way I do in PAW Maybe… in C++ But it is so…easy in Python If only I will have some kind of “PAW”  I do it! PUB Histo1d,2d,xyNtuple Manager (~HBOOK) Plotter (~PAW) GNUplot Ranges(~cuts)  I have a kind of PAW (HIPYS) in PYTHON Create, display, 1d,2d,scatter histograms I can create and display histogram form ntuples I can apply cuts in ntuples variables I can manipulate data ntuples:  Slice in rows, columns, add more columns  Make a histogram from a column I can manipulate data histograms:  Get the range (different size of bins) and contents DATA, ANALYSIS, “KUMACS” AND… I PLAY INTERACTIVE… ALL IN PYTHON …