Next Steps after WLCG workshop Information System Task Force 11 th February 2016 1.

Slides:



Advertisements
Similar presentations
1 User Analysis Workgroup Update  All four experiments gave input by mid December  ALICE by document and links  Very independent.
Advertisements

WLCG Operations and Tools TEG Monitoring – Experiment Perspective Simone Campana and Pepe Flix Operations TEG Workshop, 23 January 2012.
CREAM John Gordon GDB November CREAM number of sites now – gstat2 says 24. Batch systems supported Experiment Tests Feedback from sites. Evaluation.
Runtime alignment system SOFTWARE DESIGN IDEAS Wed 4 th May 2005 P Coe.
Storage Accounting John Gordon, STFC GDB June 2012.
LHCC Comprehensive Review – September WLCG Commissioning Schedule Still an ambitious programme ahead Still an ambitious programme ahead Timely testing.
Use Cases. Summary Define and understand slow transfers – Identify weak links, narrow down the source – Understand what perfSONAR measurements mean wrt.
Enabling Grids for E-sciencE Overview of System Analysis Working Group Julia Andreeva CERN, WLCG Collaboration Workshop, Monitoring BOF session 23 January.
Status of the production and news about Nagios ALICE TF Meeting 22/07/2010.
Workshop summary Ian Bird, CERN WLCG Workshop; DESY, 13 th July 2011 Accelerating Science and Innovation Accelerating Science and Innovation.
Enabling Grids for E-sciencE System Analysis Working Group and Experiment Dashboard Julia Andreeva CERN Grid Operations Workshop – June, Stockholm.
Towards a Global Service Registry for the World-Wide LHC Computing Grid Maria ALANDES, Laurence FIELD, Alessandro DI GIROLAMO CERN IT Department CHEP 2013.
WLCG Collaboration Workshop 7 – 9 July, Imperial College, London In Collaboration With GridPP Workshop Outline, Registration, Accommodation, Social Events.
Multicore Accounting John Gordon, STFC-RAL WLCG MB, July 2015.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Overview of STEP09 monitoring issues Julia Andreeva, IT/GS STEP09 Postmortem.
OSG Technology Area Brian Bockelman Area Coordinator’s Meeting February 15, 2012.
1 User Analysis Workgroup Discussion  Understand and document analysis models  Best in a way that allows to compare them easily.
Julia Andreeva, CERN IT-ES GDB Every experiment does evaluation of the site status and experiment activities at the site As a rule the state.
1 Andrea Sciabà CERN Critical Services and Monitoring - CMS Andrea Sciabà WLCG Service Reliability Workshop 26 – 30 November, 2007.
8 th CIC on Duty meeting Krakow /2006 Enabling Grids for E-sciencE Feedback from SEE first COD shift Emanoil Atanassov Todor Gurov.
Storage Accounting John Gordon, STFC GDB March 2013.
Recent improvements in HLRmon, an accounting portal suitable for national Grids Enrico Fattibene (speaker), Andrea Cristofori, Luciano Gaido, Paolo Veronesi.
Automatic Resource & Usage Monitoring Steve Traylen/Flavia Donno CERN/IT.
Procedure to follow for proposed new Tier 1 sites Ian Bird CERN, 27 th March 2012.
CE extensions requirements for the Information System Pre-GDB 11 th July 2012 Maria Alandes Pradillo CERN IT Department, Grid Technology Group With contributions.
Procedure for proposed new Tier 1 sites Ian Bird WLCG Overview Board CERN, 9 th March 2012.
Accounting Update John Gordon and Stuart Pullinger January 2014 GDB.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks John Gordon SA1 Face to Face CERN, June.
2011/11/03 Partial downtimes management Pierre Girard WLCG T1 Service Coordination Meeting.
WLCG Information System Use Cases Review WLCG Operations Coordination Meeting 18 th June 2015 Maria Alandes IT/SDC.
Criteria for Deploying gLite WMS and CE Ian Bird CERN IT LCG MB 6 th March 2007.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
SRM v2.2 Production Deployment SRM v2.2 production deployment at CERN now underway. – One ‘endpoint’ per LHC experiment, plus a public one (as for CASTOR2).
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES Andrea Sciabà Ideal information system - CMS Andrea Sciabà IS.
WLCG critical services update Andrea Sciabà WLCG operations coordination meeting December 18, 2014.
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
Definitions Information System Task Force 8 th January
Open Science Grid OSG Resource and Service Validation and WLCG SAM Interoperability Rob Quick With Content from Arvind Gopu, James Casey, Ian Neilson,
News and Status WLCG Information System Task Force Maria Alandes IT/SDC.
The Grid Storage System Deployment Working Group 6 th February 2007 Flavia Donno IT/GD, CERN.
LCG Pilot Jobs + glexec John Gordon, STFC-RAL GDB 7 December 2007.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE Operations: Evolution of the Role of.
WLCG Service Report ~~~ WLCG Management Board, 17 th February 2009.
Accounting Review Summary from the pre-GDB related to CPU (wallclock) accounting Julia Andreeva CERN-IT GDB 13th April
CREAM CE: upgrades in the system  Migration of the ALICE production queue in the CREAM CE: DONE  From pps-cream-fzk.gridka.de:8443/cream-pbs-pps to.
Accounting John Gordon WLC Workshop 2016, Lisbon.
WLCG Accounting Task Force Update Julia Andreeva CERN GDB, 8 th of June,
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Storage Accounting John Gordon, STFC OMB August 2013.
WLCG Information System Status Maria Alandes Pradillo, CERN CERN IT Department, Support for Distributed Computing Group GDB 9 th September 2015.
John Gordon EMI TF and EGI CF March 2012 Accounting Workshop.
Maria Alandes Pradillo, CERN Training on GLUE 2 information validation EGI Technical Forum September 2013.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
The Grid Information System Maria Alandes Pradillo IT-SDC White Area Lecture, 4th June 2014.
Accounting Review Summary and action list from the (pre)GDB Julia Andreeva CERN-IT WLCG MB 19th April
WLCG Accounting Task Force Introduction Julia Andreeva CERN 9 th of June,
HTCondor Accounting Update
Main objectives To have by the end of August :
WLCG Accounting Task Force Update Julia Andreeva CERN IT on behalf of the WLCG Accounting Task Force GDB
Benchmarking Changes and Accounting
Short term improvements to the Information System: a status report
lcg-infosites documentation (v2.1, LCG2.3.1) 10/03/05
Raw Wallclock in APEL John Gordon, STFC-RAL
Update from the HEPiX IPv6 WG
WLCG Accounting Task Force Update Julia Andreeva CERN WLCG Workshop 08
Summary from last MB “The MB agreed that a detailed deployment plan and a realistic time scale are required for deploying glexec with setuid mode at WLCG.
Monitoring Session Intro
Infrastructure Area EMI All Hands Summary.
WLCG Collaboration Workshop;
Development Planning Now that you have completed all your designing you need to write up a ‘development plan’. This can be in the form of a mind map or.
Presentation transcript:

Next Steps after WLCG workshop Information System Task Force 11 th February

WLCG workshop summary 1 General agreement that WLCG should become independent from the BDII But existing dependencies need to be understood We need to evaluate the alternatives If EGI continues with the BDII… Could we at least work on reducing the amount of published information to a minimum? This could be already done in any case! 2

Suggested action item 1 Identify the minimum set of attributes that are needed (input from use cases doc): ALICE: status of CEs, number of waiting jobs, number of running jobs ATLAS: list of sites, list of services, CE service details, local queues, HS06, logical CPUs and site downtimes CMS: list of CEs and CEs service details LHCb: list of CEs and CEs service details, MaxCPU time, CPU Scaling reference, site properties and site downtimes Focus on the common attributes: List of CEs and their attributes Get them properly published in GOCDB/OIM This will help reduce dependencies on the BDII 3

WLCG workshop summary 2 WLCG IS Still not clear if this is needed More discussions needed with the experiments One more GDB presentation to re-discuss it General agreement that in any case, the WLCG IS needs to guarantee that information is reliable 4

Suggested action item 2 Suggested by Julia: working on a table to identify sources of information for each experiment use cases The idea is to have a list of authoritative sources of information And to point out how reliability could be guaranteed for each of them Nothing new wrt use cases document It will be a “table version” of the document But it will help to clarify our strategy on the new IS 5

Other topics discussed… GLUE 2 It was agreed (again) that we keep GLUE 2 It was clarified that we don’t need to use the whole GLUE 2, only the attributes we need Benchmark definitions The benchmarking working group and MJF are the right place to discuss them Once these definitions are clear, we should make sure they are properly published in the information system if this is needed 6