Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)

Slides:



Advertisements
Similar presentations
CAVITY LOCK ELECTRONICS Dan Sexton, Sirish Nanda, and Abdurahim Rakhman.
Advertisements

01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Waveguides Seminary 5. Problem 5.1 Attenuation and crosstalk of a wire pair A carrier frequency connection is transmitted on twisted pairs with the following.
DC/DC Switching Power Converter with Radiation Hardened Digital Control Based on SRAM FPGAs F. Baronti 1, P.C. Adell 2, W.T. Holman 2, R.D. Schrimpf 2,
PEP II Transverse Feedback System Ron Akre Anatoly Krasnykh Uli Wienands MAC April 15, 2004.
RF / Laser Timing for 5/20/14 Frisch. Requirements, Jitter and Drift Looking for 100fs Pk-Pk measurements – 30fs RMS. (state of the art) Jitter:
R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Ch 6: Optical Sources Variety of sources Variety of sources LS considerations: LS considerations: Wavelength Wavelength  Output power Output power Modulation.
Ionization Profile Monitor Front End (IFE) System Presenter: Kwame Bowie PPD/EED Phone: (630)
CMOS VLSIAnalog DesignSlide 1 CMOS VLSI Analog Design.
Stefan Simrock 3 rd LC School, Oak Brook, IL, USA, 2008, Radio Frequency Systems 1 Timing and Synchronization S. Simrock and Axel Winter DESY, Hamburg,
Fiber Bragg Gratings.
Chapter Twenty-Five: Optical Communication Systems.
Optical Receiver Lecture 6.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
Updates on RF synchronization and fast trigger distribution A. Butterworth, H. Damerau, W. Hofle Acknowledgements: T. Bohl, S. Doebert, I. Kozsar, J. Molendijk,
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
1 Timing and RF Distribution NLC -> ILC Josef Frisch.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
Optical Anchor / Interferometer Status: June, 2004 Josef Frisch.
Analysis of Phase Noise in a fiber-optic link
MODULATION AIDA ESMAEILIAN 1. MODULATION  Modulation: the process of converting digital data in electronic form to an optical signal that can be transmitted.
September 22, 2005 ESF Workshop-Perugia 1 Virgo Control Electronic upgrade Annecy/Pisa/EGO B.Mours.
LHC Beam Dump System Technical Audit Trigger Synchronisation Unit.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Filip Tavernier Karolina Poltorak Sandro Bonacini Paulo Moreira
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
Micro-Research Finland Oy MRF Timing System Jukka Pietarinen Timing Workshop CERN February 2008.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Marc Ross Saturday, June 5, 2004 nanometer BPM status and plans.
VCSEL High Speed Drivers
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
1/19/2006Frank Lenkszus Advanced Photon Source 1 ILC Timing Frank Lenkszus Controls Group Advanced Photon Source Argonne National Lab.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
The recent history and current state of the linac control system Tom Himel Dec 1,
BIC Issues Alan Fisher PEP-II Run-4 Post-Mortem Workshop 2004 August 4–5.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
BPM stripline acquisition in CLEX Sébastien Vilalte.
LAPP BI Read-out electronics Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC BI WS 02-03/06/2009.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Prof. Alfred J Bird, Ph.D., NBCT Office – Science 3rd floor – S Office Hours – Monday and Thursday.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Data Transmission Common media concepts. Data Transmission and Media.
ESS LLRF and Beam Interaction
RF acceleration and transverse damper systems
LCLS_II High Rep Rate Operation and Femtosecond Timing
SLAC I&C Division / EE Department
ILC Phase Reference Distribution R&D
AFE II Status First board under test!!.
Controls CBETA controls will extend existing EPICS control system
Long-Distance Communication (Carriers, Modulation, And Modems)
New PSB beam control rf clock distribution
LCLS RF Stability Requirements
Diagnostics RF and Feedback
Breakout Session SC3 – Undulator
Presentation transcript:

Timing System R+D for the NLC Josef Frisch

NLC and PEPII Phase and Timing Requirements (approximate)

Why do we need high stability (10ps) triggers? ● BPM pickoffs typically produce a few x100ps pulse (button) or pair of pulses (stripline). If a gated integrator or sampler could be triggered with ~10ps resolution it would make a very simple and low noise BPM. ● Streak cameras, laser wires, etc. could also use high stability trigger timing.

Timing and Phase Distribution ● Timing requirements for NLC are sufficiently tight that active stabilization is needed ● Easiest to use RF phase distribution system for timing ● A fiducial is placed on the RF at 120 or 360Hz) and triggers are generated by counting RF cycles after this fiducial

NLC and PEPII Upgrade ● Technology developed for NLC timing system is applicable to PEPII. ● PEPII requirements much looser – Easier Phase / timing stability – Fewer units required (less cost sensitivity) ● PEPII Ring turn clock will different design – Also needed for NLC damping rings.

Timing Distribution Technologies ● Both copper cable and fiber optics have similar phase coefficients with temperature ~2x10 -5 /°C – Fiber coefficient due to change in index – NLC Would require °C stability: Tough! – PEPII needs.02 °C. (Still not easy) ● Need to use feedback ● Fiber preferred over Copper due to lower loss, better VSWR, and lower cost. – Radiation sensitivity must be considered – Use fiber for long haul, coax in tunnel.

NLC Timing System ● Point to point fiber system (~50 drops for NLC) ● Laser modulated by RF carrier ● Measure transmission fiber length using light reflected from far end of fiber ● Adjust length using fiber spool in oven in series with main fiber

RF Distribution Test System

1 Month, 10 °C Temperature Step 1ps

Performance test for 1 month 1ps

Redundant Architecture ● Want single point failure immune system, but do not want full duplication. ● Sudden phase shift of a sector could cause a large energy excursion - possibly damaging the accelerator. ● Redundancy built into the system topology.

Redundant Fiber System Note: local oscillators in each "crate" prevent sudden changes in sector phase.

Phase Distribution System Status ● Test system meets NLC requirements for phase stability and phase noise ● Fault tolerant system architecture developed – Single point failure resistant ● Fiducial electronics tested, but not used with fiber system. ● Next generation system being developed for PEPII.

Use of Tunable Lasers for Fiber Phase Length Control ● A wavelength tunable laser could replace the fiber /oven. – Wavelength tuning coupled with dispersion (typical 20ps/nm/Km) will provide adjustable delay. – Thermal shift ~2x10 -5 / 0 C or 100ps/km/ 0 C – Need 5nm/ 0 C, or about 50nm total. ● DWDM 1550nm band is ~30nm wide. ● Expect commercial lasers soon!

Changes From Prototype ● Embedded intelligence, rather than external Windows PC. ● Surface mount components to replace connectorized components. ● System to consist of rack mount RF / Optical module and rack mount oven module. ● Temperature stabilization may not be needed for PEPII performance.

Open Design Issues ● Digital vs Analog: Where to convert? – Digital: Use Digital down converters, fast ADCs, fast math in programmable logic – Analog: Everything up to the ADC for the slow feedback loops is analog ● Control system interface: – OK light? – Full support as EPICS micro? ● Single controller, or multiple controllers.

What Does a Future System Look Like? ● All logic on single chip, either PLD, or possibly custom ASIC. – Need 714MHz logic for NLC - few years. ● May integrate CPU with logic, or use micro. ● Still want some analog components: Mixers, amplifiers,etc. – "Cell phone" type components cheap and small