Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.

Slides:



Advertisements
Similar presentations
ISIS Accelerator Division
Advertisements

Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
Task Force on Project X for Muon Collider Keith Gollwitzer Accelerator Division Fermilab.
Project X – MAP Task Force Keith Gollwitzer Accelerator Division Fermilab Project X Collaboration Meeting Oct 25, 2011.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Simultaneous Delivery of Parallel Proton Beams with the EURISOL Driver
Fermilab, Proton Driver, Muon Beams, Recycler David Neuffer Fermilab NufACT05.
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
December 5, Chuck Ankenbrandt Fermilab Muon Collider Design Project X as a Hi-Rep-Rate Driver for a Muon Collider Chuck Ankenbrandt.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
Proton Delivery to Target Keith Gollwitzer Accelerator Division Fermilab MAP 2012 Winter Meeting March 7, 2012.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Proton Driver Keith Gollwitzer May 31, Initial Design Overview For design purposes, the following is assumed –H - beam comes from PIP II and follow-on.
Proton Beam for PRISM Keith Gollwitzer Accelerator Division Fermilab 5 th Workshop Project X Physics – Muons November 8, 2010.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
Fermilab and Muons Proton Driver (for ν-Factory, μ + -μ - Collider, …) David Neuffer Fermilab.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
Proton Driver – Target Station Interfaces Keith Gollwitzer Fermilab Wednesday May 28, 2014 MAP 2014 Spring Meeting.
Proton Driver / Project X Keith Gollwitzer Fermilab August 30, 2012.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
F D F November 8, 2006Alessandro G. Ruggiero1 of GeV 10-MWatt Proton Driver Target 200-MeV DTL 1.0-GeV FFAG H – Stripping Foil Injection Energy,
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Accumulator & Compressor Rings with Flexible Momentum Compaction arccells MAP 2014 Spring Meeting, Fermilab, May 27-31, 2014 Y. Alexahin (FNAL APC)
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
Project X as a Muon Facility Platform Keith Gollwitzer Fermilab Accelerator Advisory Committee November 7-9, 2011.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
UK Neutrino Factory Conceptual Design
HIAF Electron Cooling System &
Large Booster and Collider Ring
Injector Chain General and more about p-RCS
Injector Chain General and more about p-RCS/i-RCS
FFAG Accelerator Proton Driver for Neutrino Factory
Progress towards Pulsed Multi-MW CERN Proton Drivers
LHC (SSC) Byung Yunn CASA.
Ion bunch formation options for 400GeV JLEIC
JLEIC 200 GeV ion beam formation options
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014

Proton Driver Outline Overview –History Accomplishments –Current Concept Initial Baseline Selection Schedule Personnel and Effort Technology & Challenges February 19, Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014)

Proton Driver at August 2012 MAP Review Overview –Assumed Project X existed –Outlined how to increase Project X beam to 4 MW of 8 GeV H- ions –Accumulation Ring converts ions to protons as well as formats beam into a few intense bunches –Compressor Ring bunch rotates beam to the desired short bunch(s) –Delivery beam line(s) February 19, Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014)

Since Last August 2012 MAP Review Project X was split into stages MASS looked at facilities starting with stage 2 of Project X –Proton Driver at 3 GeV Proton Improvement Plan (PIP) II has become the start of a new facility for the Proton Driver MASS assumes that there is a follow-on to PIP II resulting in the equivalent of stage 2 MASS proposes Dual Use Linac –Proton Driver delivers 6.75 GeV proton beam February 19, Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014)

Dual Use Linac MAP linac for muon acceleration can be used for H- acceleration –muon beam GeV –H- beam GeV –FNAL SRF expertise is 325 MHz, 650 MHz and 1300MHz MAP has moved to adopt these frequencies February 19, Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014) 1-3 GeV GeV GeV GeV

Key Proton Driver Accomplishments Since the August 2012 MAP Review DateDescription FY13 Q2Provided appendix to Project X design report ("Project X Accelerator Reference Design, Physics Opportunities, Broader Impacts") describing upgrade path to MAP Proton Driver FY13 Q3Completed contribution to Proton Driver section and FNAL Project X appendix to IDS-NF RDR FY13 Q4Provided feedback to MASS on 3 GeV Proton Driver option FY14 Q1Interfaced with MASS on 6.75 Proton Driver option based on Dual Use Linac FY14 Q1Accepted initial concept specification described in IPAC12 paper “Design of Accumulator and Compressor Rings for the Project X Based Proton Driver.” (Design concept will be adjusted for operation at 6.75 GeV as well as 8 GeV) FY14 Q2Developed a work plan for executing the IBS process February 19, 2014 Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014)6

Present Day Assumptions PIP II: Ion source (5mA) & RFQ (162.5 MHz) provides 1.92 x 10 8 particles per linac bunch. Follow on to PIP II: an additional non-MAP linac supporting high power beam to 3 GeV. –Similar to Stage 2 of Project X 1 MW scenario: Dual Use Linac accelerating ions at 15 Hz to 6.75 GeV –4 ms pulses where 50% beam is chopped in front end so that linac bunches are synched with Accumulator Ring RF February 19, Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014)

Previous work had been for 8 GeV Revisit of Rings’ Designs February 19, Accumulator Compressor Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014)

Revisit of Rings’ Designs Previous work has been for 4 MW at 8 GeV Start by revisiting rings for 1 MW at 6.75 GeV –Follow with larger beam power studies February 19, ParametersAccumulatorCompressor Circumference (m) Momentum Compaction Slippage Factor RF Frequency (MHz)3.87 RF Voltage (kV)10240 Synchrotron Tune2.1 x x Peak Current (A) Final rms Bunch Length (ns) Final rms Energy Spread5.2 x x Threshold Impedance (Ohm) Emittance rms (μm)55 Space Charge Tuneshift h/v0.02/ /0.16 Betatron Tunes h/v7.94/ /8.44 Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014)

Stripping System Conversion of MW (or more) ion beam to protons for accumulation will be studied. –Stripping at 6.75 (or 8) GeV –Leveraging SNS experience: 1 MW at 1 GeV Continue Project X work: 300kW at 8 GeV –Same FNAL personnel involved Ideas –Foil (stationary, multiple, rotating) –Laser stripping February 19, Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014)

Delivery Beam Line(s) & Focusing System Based upon IDS-NF design. Focusing system will be interfaced with Target system. Bunch instabilities may require extraction of several bunches from the Compressor Ring to be sent through different beam lines to arrive simultaneously at the target. –Focusing system could require a non-standard magnetic element(s) that focuses multiple beams that have little separation February 19, Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014)

Initial Baseline Selection Schedule February 19, 2014 Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014)12

Personnel & Effort Required A magnet expert is available for consulting Effort to reach IBS will be 1 FTE x 20 months February 19, PersonnelInstitutionTask Alexahin, YuriFermilabRings, Focus System, Instabilities Ankenbrandt, CharlesMuons IncRings, Focus System, Instabilities, Stripping Gollwitzer, KeithFermilabRings, Focus System, Instabilities, Stripping Johnson, DavidFermilabRings, Focus System, Stripping Kapin, ValeryFermilabRings, Focus System, Instabilities Lebedev, ValeriFermilabRings, Focus System, Instabilities, Stripping Neuffer, DavidFermilabRings, Focus System, Instabilities Popovic, MiloradFermilabRings, Focus System, Instabilities, Stripping Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014)

Conventional Technology Ring and beam line magnets –Dipoles –Quads –Sextupoles –Kickers RF Systems Collimators February 19, Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014)

Novel Technologies Stripping System –Greater than 1 GeV ion beam energy –Greater than 1 MW beam power Target Focus System –Focus element(s) within greater than 1 T solenoid magnetic field –Multiple beams with small separation being focused February 19, Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014)

Stripping System Challenges Static Foil or Rotating Foil –What beam power can be endured? –Multiple beam passes. Scattering. Laser –Viability for MW beam Unconverted Beam –Capture of non-protons (dump) –Limit activation of tunnel and components February 19, Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014) Will extend on-going work for linac beam conversion to protons and injection into the Main Injector

Focus System Challenges Target Solenoid Field –A “fringe” field > 1 T exists 5 m upstream of target Magnetic shielding or canceling magnetic field –Off-axis proton beam path is helical Multiple beams with small crossing angles at target –Previous work showed that the separation of 4 beams 5 m upstream of target to be ~15 cm. February 19, Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014)

Proton Driver Conclusion Design work –Revisit of rings designs almost complete –Delivery beam line to be based upon IDS-NF Technology –Most components are conventional –Stripping system will be leveraged from SNS experience and work done for linac beam injection into the Main Injector –Final Focusing element(s) may require design of a non-conventional magnet February 19, 2014 Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014)18

February 19, Extras Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014)

Possible Layout February 19, GeV Muon Linac (325MHz) To SURF 1 GeV Proton Linac GeV Proton & GeV Muon Dual Use Linac 1-3 GeV Proton Linac Front End Accumulator & Compressor Rings Initial Cool 6D Cool Final Cool RLA to 63 GeV Target Keith Gollwitzer | DOE Review of MAP (FNAL, February 19-20, 2014)