NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9,

Slides:



Advertisements
Similar presentations
T&D Losses Reflecting Losses in DR within ERCOT August 22, 2012.
Advertisements

INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Convergence Bidding Overview Margaret Miller Manager, Market Design & Regulatory Policy CPUC Convergence Bidding Workshop August 26, 2010.
Loads in SCED v2 Subgroup Update to DSWG 3/9/
1 TAC Review of PRR 650 August 3, Board Charge to TAC Board remanded PRR 650 to TAC for: “an analysis of how to ensure that consumers pay only.
Loads Acting as a Resource Relationships with QSEs and LSEs
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
1 PRR 776 in the Context of the ERCOT Market Design Eric S. Schubert Regulatory Affairs Advisor BP Energy Company.
LMP-G Policy Issues Discussion Demand Side Working Group July 9 th,
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
1 Dead Bus Pricing Issue/CRR Performance Issue TAC 3 February, 2010.
December 2, 2011 QMWG Summary of Potential Issues with NPRR385 Price Floor ERCOT.
Real Time Mitigation During Exceptional Fuel Cost Events.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
NPRR 097 DSR and Small Capacity / Low Operating Level Issues for Compliance Monitoring.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
PRS Response to Steel Companies’ Appeal of NPRR’s 351 and 378 Tom Payton on behalf of PRS August 4, 2011 Disclaimer: This response attempts to capture.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Photovoltaic and Storage Integration Workshop “Operational Issues” Kenneth Ragsdale October 15, 2012 ERCOT.
Load Participation in Real-Time Market: LMP Minus G.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
LMP-G Policy Issues Matrix LRISv2 Subgroup July 23 rd,
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
This slide deck contains animations. Please open this deck in slide show mode (“View” menu, then click on “Slide Show”). To move through the animations,
QMWG Update to WMS S. Looney December 3, Assignments from WMS ERCOT Market Operations Report – Two SASMs in October, no AS insufficiency – Two unique.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee October 9, 2003.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
9/17/2012 CSWG CSWG – ERCOT Update ERCOT. 2 Settlements Project & Operational Updates February 27, 2012 NPRR 347: Combined Daily Invoice –Still on track.
LMP-G Policy Issues Matrix LRISv2 Subgroup July 23 rd,
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
The credit exposure impact of higher system-wide offer caps was estimated using an internal ERCOT model under four scenarios: 1.(Base Case) “Normal” summer.
Nodal Short Pay and Uplift Process CWG Meeting May 28, 2008.
ERCOT Market Credit Working Group Presentation to the Finance and Audit Committee Payment Short Pay/Default and Uplift for Congestion Revenue rights (CRRs)
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
Item 10: Mitigation of Credit Tail Risk Exposure Donald Meek 2015 Chair, Credit Work Group Finance & Audit Committee Meeting ERCOT Public February 9, 2015.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
Third Party DR Self-Deployment Loads in SCEDv2 Subgroup Sept. 18, 2015.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
CMWG Update to WMS Report of CMWG Meeting of
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
1 Market Trials Update NATF January 5, 2010.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
TAC Rejection of NPRR Mitigated Offer Caps for RMR Units
Settlement Update Austin Rosel ERCOT February 27, 2017.
Exceptional Fuel Costs in LMP
PRS Rejection of NPRR Mitigated Offer Caps for RMR Units
Alternative Approach for Loads in SCED v.2
Load Participation in Real-Time Market: Loads in SCED version 2
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Reflecting Losses in DR within ERCOT August 22, 2012
Presentation transcript:

NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9, 2016

NPRR 649 Overview Concerns generally centered on: (1) scope of “make-whole” payment for hypothetical lost profits, which would be uplifted to customers, and (2) high implementation cost for infrequent issue. Original NPRR had two options, with Option 1 providing a much broader payment than Option 2: Option 1 would pay the Qualified Scheduling Entity (QSE) for lost “opportunity costs” (i.e., hypothetical profits) relative to its expected Real-Time market position. Option 2 attempted to limit payment to the QSE’s financial losses by compensating for the lower of: (1) losses in Real Time relative to Day-Ahead Market (DAM) position, or (2) losses relative to expected Real-Time market position, as calculated under Option 1.

Concerns with NPRR649 Make-Whole Payments No other ERCOT compensation is for lost profits. “ Opportunity costs” are hypothetical profits a generator would have made based on their anticipated dispatch in Real Time. Opportunity costs do not represent actual costs (i.e., financial losses) but hypothetical lost revenues. The ERCOT market has historically avoided paying generators for hypothetical lost profits because (a) it inappropriately shifts operational risk to loads who are unable to anticipate, hedge, or manage it, and (b) it creates gaming opportunities that are difficult to police. Consumers concerned with compensating generators for maximum lost profits under Option 1, and proposed a number of safeguards to limit the scope of these payments and the associated uplift. The NPRR proponents ultimately rejected most of these safeguards and pursued Option 1 with limited changes relative to the filed version.

Concerns on NPRR649- Make Whole Payments Potential consequences of NPRR: Option 1 pays difference between actual dispatch and LMP. Generators can artificially increase compensation for lost profits by lowering offers below what they typically bid or even their actual cost, increasing the delta. Overrides are often predictable, particularly when a condition remains for several days. Allowing a make-whole in this situation could force consumers to pay for multiple days of hypothetical lost profits, even though generator could limit financial risk. Option 2 is more limited but also carries risk of unjustified make-whole payments. For example, Generators can sell into the DAM just to receive over-rides.

Concerns on NPRR649- Make Whole Payments Safeguards proposed by consumers to limit make-whole/uplift exposure included verifying actual financial losses through the dispute process to limit payments, and terminating make-whole payments when the constraint could be managed by SCED instead of a manual override or after successive days of overrides. The NPRR proponents ultimately rejected most of these safeguards and restrictions and pursued Option 1 with limited changes, drawing opposition from load-serving interests.

Concerns on NPRR649- Implementation Cost Secondary concern was high implementation cost of NPRR. Proponents worked with ERCOT to reduce implementation cost but it is still estimated at $100 to $125k for relatively rare occurrence. Market participants have had concerns over NPRRs with much lower implementation costs that will be applied more frequently, so some were concerned about benefits relative to costs.

Options Affirm TAC’s recommendation to reject NPRR649. Remand to TAC with instructions to limit payment to verified financial losses, with limitations on duration.